Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Air Traffic Management-eXploration Testbed for Urban Air Mobility Research and Development

The presentation will describe the architecture, current capabilities and some future enhancements of the testbed that is being developed at the National Aeronautics and Space Administration (NASA) to enable benefit, impact, safety and cost assessments for accelerating the deployment of air traffic management concept and technologies in the national airspace system. The testbed will support analysis of operational feasibility of urban air mobility operations, a part of NASA's Air Traffic Management eXploration project, and provide the data needed by regulatory agencies charged with public safety. Introduction of concepts and technologies, especially new concepts and technologies, is difficult and often takes decades because of the inability to assess the operational impact of the interaction between the proposed concept and technology and operationally deployed systems in terms of system-wide safety, traffic flow efficiency, roles and workload of controllers and traffic managers, and impact on airlines and other operators. To overcome these limitations, the testbed is developing infrastructure to enable mathematical modeling, human-in-the-loop evaluations and testing with operational systems in a simulated environment. In addition to the difficulty of establishing communications between geographically distributed systems, downloading/installing software, and management of startup, error-handling and shutdown, a major impediment for conducting simulations and human-in-the-loop testing with operational systems is the tedious manual scenario generation process. Several of these difficulties have been addressed in the current state of the testbed. The testbed can be described in terms of the following elements (1) web-based frontend and backend, (2) Testbed Builder, (3) Data Distribution Service, (4) Component Library, (5) Simulation Management, and (6) Scenario Generation. The web-based frontend and backend enable the user to interact with the testbed for tasks such as composing a simulation, running a simulation and retrieving output data. The Testbed Builder application launched from the web frontend is a graphical user interface for the user to drag-and-drop and connect predefined blocks for composing a simulation/scenario generation task. The Builder writes a set of instructions for Simulation Management based on the links between the blocks and the block properties such as the component (executable) associated with a particular block. Management of the distributed simulation is accomplished by Execution and Component Managers. Execution Manager interprets the instructions provided by the Builder to instruct the Component Managers to download components from the Component Library to specified computers and to start them up. Once started, the components communicate with each other by publishing messages and subscribing to messages that are delivered by the Data Distribution Service. The Scenario Generation capability can be used for creating traffic scenarios for Multi-Aircraft Control System, which has been used extensively at NASA for human-in-the-loop-based concept evaluations. The presentation will provide a testbed enabled example scenario of Multi-Aircraft Control System based simulation in which the urban air mobility pilot using the conflict detection and resolution system would interact with the air traffic controllers for resolving conflicts with other aircraft during terminal area operations.

Testbed↗

Integrating Land Cover Modeling and Adaptive Management to Conserve Endangered Species and Reduce Catastrophic Fire Risk

Land cover modeling is used to inform land management, but most often via a two-step process where science informs how management alternatives can influence resources and then decision makers can use this to make decisions. A more efficient process is to directly integrate science and decision making, where science allows us to learn to better accomplish management objectives and is developed to address specific decisions. Co-development of management and science is especially productive when decisions are complicated by multiple objectives and impeded by uncertainty. Multiple objectives can be met by specification of tradeoffs, and relevant uncertainty can be addressed through targeted science (i.e., models and monitoring). We describe how to integrate habitat and fuels monitoring with decision making focused on dual objectives of managing for endangered species and minimizing catastrophic fire risk. Under certain conditions, both objectives might be achieved by a similar management policy, but habitat trajectories suggest tradeoffs. Knowledge about system responses to actions can be informed by applying competing management actions to different land units in the same system state and by ideas about fire behavior. Monitoring and management integration is important to optimize state-specific management decisions and increase knowledge about system responses. We believe this approach has broad utility for and cover modeling programs intended to inform decision making.

adaptive management↗

Adaptive Management Using Remote Sensing and Ecosystem Modeling in Response to Climate Variability and Invasive Aquatic Plants for the California Sacramento-San Joaquin Delta Water Resource

The California Sacramento-San Joaquin River Delta is the hub for California's water supply and supports important ecosystem services, agriculture, and communities in Northern to Southern California. Expansion of invasive aquatic plants in the Delta coupled with impacts of changing climate and long-term drought is detrimental to the San Francisco Bay/California Delta complex. NASA Ames Research Center and the USDA-ARS partnered with the State of California to develop science-based, adaptive-management strategies for invasive aquatic plant in the Sacramento-San Joaquin Delta. Specific mapping tools developed utilizing satellite and airborne platforms provide regular assessments of population dynamics on a landscape scale and support both strategic planning and operational decision making for resource managers. San Joaquin and Sacramento River watersheds water quality input to the Delta is modeled using the Soil-Water Assessment Tool (SWAT) and a modified SWAT tool has been customized to account for unique landscape and management of agricultural water supply and drainage within the Delta. Environmental response models for growth of invasive aquatic weeds are being parameterized and coupled with spatial distribution/biomass density mapping and water quality to study ecosystem response to climate and aquatic plant management practices. On the water validation and operational utilization of these tools by management agencies and how they are improving decision making, management effectiveness and efficiency will be discussed. The project combines science, operations, and economics related to integrated management scenarios for aquatic weeds to help land and water resource managers make science-informed decisions regarding management and outcomes.

Adaptive↗

Lessons Learned With Risk Management: A Systems Engineer's Perspective

Risk management is a communications device that, when executed as an essential task, enables systems engineering to effectively balance risk across the project. Developing and baselining risks is an essential continuous task to ensure top project concerns both from bottom up and top down are being mitigated. Risk management provides the opportunity to avoid the consequence of the risk when mitigation steps start early enough. Just discussing risk with all the project flight elements during development, even if no risks are open, provides an excellent communication opportunity between systems engineering and those elements, ensuring concerns and worries have a platform for discussion. A well-managed risk identification process will identify concerns that are serious but not being clearly communicated, and it will enable mitigation of those potential problems before they cause a failure. Effective risk management requires considerable time and effort, but that effort will save time and money across the development. Risk management must be frequent enough to be useful and in depth enough to bring out emerging issues. It also requires a trusting relationship between the lead systems engineer and element and/or subsystem leads. The discussions need to be with the right number of individuals (typically a handful) and the right duration in time (typically an hour a month). Outside of these risk working groups, there is a formal management process to input, status, and disposition risks, and a monthly Risk Management Board meeting where key project stakeholders are informed. This paper provides good guidance on effective risk management from a systems engineering perspective and provides project lessons learned from the NASA spaceflight missions NICER, Landsat 9, LRO, and OSIRIS-REx to demonstrate the effectiveness of risk management.

Lessons Learned↗

Lessons Learned With Risk Management: A Systems Engineer’s Perspective

Risk management is a communications device that, when executed as an essential task, enables systems engineering to effectively balance risk across the project. Developing and baselining risks is an essential continuous task to ensure top project concerns both from bottom up and top down are being mitigated. Risk management provides the opportunity to avoid the consequence of the risk when mitigation steps start early enough. Just discussing risk with all the project flight elements during development, even if no risks are open, provides an excellent communication opportunity between systems engineering and those elements, ensuring concerns and worries have a platform for discussion. A well-managed risk identification process will identify concerns that are serious but not being clearly communicated, and it will enable mitigation of those potential problems before they cause a failure. Effective risk management requires considerable time and effort, but that effort will save time and money across the development. Risk management must be frequent enough to be useful and in depth enough to bring out emerging issues. It also requires a trusting relationship between the lead systems engineer and element and/or subsystem leads. The discussions need to be with the right number of individuals (typically a handful) and the right duration in time (typically an hour a month). Outside of these risk working groups, there is a formal management process to input, status, and disposition risks, and a monthly Risk Management Board meeting where key project stakeholders are informed. This paper provides good guidance on effective risk management from a systems engineering perspective and provides project lessons learned from the NASA spaceflight missions NICER, Landsat 9, LRO, and OSIRIS-REx to demonstrate the effectiveness of risk management.

Lessons Learned↗

Advancing Asset Management in Water Infrastructure Systems

Aging water system infrastructure, including drinking water, wastewater, and stormwater, poses a growing challenge for utilities and municipalities. These water systems have well documented challenges with respect to their age, condition, and level of service. ASCE annual report cards consistently rate these infrastructure systems in the United States as underfunded, overcapacity, or past service life (ASCE 2025 Report Card). For example, Chini and Stillwell (2017) estimated that the mean water loss in drinking water systems, i.e., non-revenue water, is approximately 16% across the United States. These concerns are not just relegated to the United States, with Courtenay, British Columbia, identifying 17% of their water main pipes as in a ‘poor’ condition state, defined as a category condition 5 out of 5 (City of Courtenay, 2024). These cases illustrate the challenges utilities are facing to manage extensive networks of infrastructure to deliver a consistent and high level of service. For buried infrastructure such as water systems, studies suggest that preventative interventions can lead to lower maintenance costs and fewer service disruptions (Mazumder et al, 2018; Li et al, 2014). The demonstrated need and benefit of appropriately applied asset management is juxtaposed against the relatively sparse literature that evaluates water systems within an asset management construct. Since 2020, just 37 papers specifically reference asset management in the Journal of Water Resources Planning and Management. Of those, only a few specifically look to develop strategies for improved asset management. Therefore, we highlight four key research areas that represent opportunities for advancement of asset management research for water systems. First, advances in condition assessment and forecasting are needed to better estimate asset deterioration using diverse datasets. Second, machine learning (ML) and artificial intelligence (AI) hold promise for predictive maintenance and investment prioritization, though questions of generalizability and model transparency remain. Third, applying a value of information framework can guide utilities in making cost-effective sensor deployment and data collection decisions, to direct monitoring strategies towards data-informed asset management decisions. Finally, integrated infrastructure management is critical, requiring coordinated planning with other infrastructure systems and stakeholder engagement to reduce costs and enhance service delivery.

Chini, Christopher M.↗

Repository-Based Software Engineering Program: Working Program Management Plan

Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

Source record↗

Resource Management for Distributed Parallel Systems

Multiprocessor systems should exist in the the larger context of distributed systems, allowing multiprocessor resources to be shared by those that need them. Unfortunately, typical multiprocessor resource management techniques do not scale to large networks. The Prospero Resource Manager (PRM) is a scalable resource allocation system that supports the allocation of processing resources in large networks and multiprocessor systems. To manage resources in such distributed parallel systems, PRM employs three types of managers: system managers, job managers, and node managers. There exist multiple independent instances of each type of manager, reducing bottlenecks. The complexity of each manager is further reduced because each is designed to utilize information at an appropriate level of abstraction.

Neuman, B. Clifford↗

Guidelines for Project Management

Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

Ben-Arieh, David↗

Chemical restrictions of roots in Ultisol subsoils lessened by long-term management

Exchangeable Al in subsoils of Ultisols in the southeastern USA can restrict rooting depth. Downward movement of basic cations (Ca, Mg, and K), applied as lime and fertilizer, may diminish that restriction over time. Materials from the argillic horizon were collected from three paired sites, having managed (long-term cropping) and nonmanaged topsoils (Typic Paleudults and Hapludults). One managed site was cropped continuously for 15 yr while the others were cultivated for more than 30 yr. Concentrations of extractable cations and other nutrients from the paired sites were compared to determine the magnitude of change due to management. The ability of the subsoils to support plant growth was evaluated in a missing-nutrient greenhouse experiment with sorghum [Sorghum bicolor (L.) Moench]. Subsoils of managed sites had greater effective cation-exchange capacity (CEC) and base saturation than those of non-managed sites. While availabilities of Ca, Mg, and K in subsoils of nonmanaged sites were inadequate to support maximal plant growth, they were adequate in subsoils of managed sites. Compared with nonmanaged sites, KCl-exchangeable Al in subsoils of managed sites was 23% lower at the 15-yr location and 65 and 100% lower at the two other locations. In the absence of lime, sorghum growth was almost totally inhibited on nonmanaged subsoils amended with optimum nutrients. On the managed subsoils, where 100, 65, and 23% of the nonmanaged exchangeable Al had been neutralized by topsoil fertilization and liming, growth reductions under the same conditions were 0, 50, and 100%, respectively. Thus, relatively long-term management had improved these Ultisol subsoils for root growth and development.

NASA Discipline Life Support Systems↗

NASA Spacecraft Fault Management Workshop Results

Fault Management is a critical aspect of deep-space missions. For the purposes of this paper, fault management is defined as the ability of a system to detect, isolate, and mitigate events that impact, or have the potential to impact, nominal mission operations. The fault management capabilities are commonly distributed across flight and ground subsystems, impacting hardware, software, and mission operations designs. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns due to underestimating the complexity and support requirements for fault management. As a result of this and other recent experiences, the NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) commissioned a workshop to bring together invited participants across government, industry, academia to assess the state of the art in fault management practice and research, identify current and potential issues, and make recommendations for addressing these issues. The workshop was held in New Orleans in April of 2008. The workshop concluded that fault management is not being limited by technology, but rather by a lack of emphasis and discipline in both the engineering and programmatic dimensions. Some of the areas cited in the findings include different, conflicting, and changing institutional goals and risk postures; unclear ownership of end-to-end fault management engineering; inadequate understanding of the impact of mission-level requirements on fault management complexity; and practices, processes, and tools that have not kept pace with the increasing complexity of mission requirements and spacecraft systems. This paper summarizes the findings and recommendations from that workshop, as well as opportunities identified for future investment in tools, processes, and products to facilitate the development of space flight fault management capabilities.

Newhouse, Marilyn↗

NASA Schedule Management Handbook

The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

Source record↗

Managing Small Spacecraft Projects: Less is Not Easier

Managing small, low cost missions (class C or D) is not necessarily easier than managing a full flagship mission. Yet, small missions are typically considered easier to manage and used as a training ground for developing the next generation of project managers. While limited resources can be a problem for small missions, in reality most of the issues inherent in managing small projects are not the direct result of limited resources. Instead, problems encountered by managers of small spacecraft missions often derive from 1) the perception that managing small projects is easier if something is easier it needs less rigor and formality in execution, 2) the perception that limited resources necessitate or validate omitting standard management practices, 3) less stringent or unclear guidelines or policies for small projects, and 4) stakeholder expectations that are not consistent with the size and nature of the project. For example, the size of a project is sometimes used to justify not building a full, detailed integrated master schedule. However, while a small schedule slip may not be a problem for a large mission, it can indicate a serious problem for a small mission with a short development phase, highlighting the importance of the schedule for early identification of potential issues. Likewise, stakeholders may accept a higher risk posture early in the definition of a low-cost mission, but as launch approaches this acceptance may change. This presentation discusses these common misconceptions about managing small, low cost missions, the problems that can result, and possible solutions.

Barley, Bryan↗

NASA's Risk Management System

Phased‐approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest‐level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management.  Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

Perera, Jeevan S.↗

Management Approach for NASA's Earth Venture-1 (EV-1) Airborne Science Investigations

The Earth System Science Pathfinder (ESSP) Program Office (PO) is responsible for programmatic management of National Aeronautics and Space Administration's (NASA) Science Mission Directorate's (SMD) Earth Venture (EV) missions. EV is composed of both orbital and suborbital Earth science missions. The first of the Earth Venture missions is EV-1, which are Principal Investigator-led, temporally-sustained, suborbital (airborne) science investigations costcapped at $30M each over five years. Traditional orbital procedures, processes and standards used to manage previous ESSP missions, while effective, are disproportionally comprehensive for suborbital missions. Conversely, existing airborne practices are primarily intended for smaller, temporally shorter investigations, and traditionally managed directly by a program scientist as opposed to a program office such as ESSP. In 2010, ESSP crafted a management approach for the successful implementation of the EV-1 missions within the constructs of current governance models. NASA Research and Technology Program and Project Management Requirements form the foundation of the approach for EV-1. Additionally, requirements from other existing NASA Procedural Requirements (NPRs), systems engineering guidance and management handbooks were adapted to manage programmatic, technical, schedule, cost elements and risk. As the EV-1 missions are nearly at the end of their successful execution and project lifecycle and the submission deadline of the next mission proposals near, the ESSP PO is taking the lessons learned and updated the programmatic management approach for all future Earth Venture Suborbital (EVS) missions for an even more flexible and streamlined management approach.

Guillory, Anthony R.↗

Integrated Demand Management: Concepts and Procedures

This report provides a comprehensive description of the Integrated Demand Management concept. Motivation: NASA’s Integrated Demand Management (IDM) research explores the idea that, under certain conditions, time-based flow management (TBFM) arrival operations can benefit from the coordinated use of a strategic traffic management initiative (TMI) to “precondition” the inbound demand. The research was motivated by the observation that TBFM was usually turned off during convective weather, even in facilities where it was routinely used. Our hypothesis was that strategic adjustments to the inbound traffic so that it provided a better match to the off-nominal changes in capacity observed during these conditions could enable TBFM scheduling to continue to provide effective support for arrival traffic management. Concept: IDM proposes that a TMI (e.g., a Collaborative Trajectory Options Program, or CTOP) be used to adjust the rate and/or geographic distribution across flows of the traffic inbound to a high-demand, TBFM-managed airport before that traffic reaches the TBFM planning horizon. After this strategic preconditioning, TBFM can then tactically fine-tune the demand to deliver a well-managed, orderly feed to the destination airport. Coordinated use of these two flow management capabilities is intended to improve system performance in terms of: • Equity of ground delay assignment, avoiding excessive ground delay for TBFM-scheduled departures, without penalizing longer flights; • Throughput, by distributing traffic to maximize use of available capacity; • Predictability for operators, providing advance notice about the impact on individual flights; • Increased flexibility, supporting operator mitigation strategies such as slot swapping or trajectory options; • Efficiency of flight operations, using ground delay more effectively and reducing airborne delay. The operational description in this document highlights how the IDM concept builds upon already existing tools and procedures, and also indicates where tool enhancements could facilitate conduct of IDM operations. However, enhanced tools are not a requirement for concept introduction. In fact, initial deployment that focused on training procedures and rationale for coordinated use of TFMS and TBFM, without changes to existing tools, might be a simpler way to introduce and to familiarize traffic managers with the idea of preconditioning. The concept and procedures described in this document can hopefully provide useful guidance for introduction of IDM into field operations..

IDM↗

A Framework for Assessment of Autonomy Challenges in Air Traffic Management

Traditionally, air traffic management services have been provided by air traffic controllers and managers stationed in ground facilities, employed or contracted by the public sector, and supported by automation. These centralized, human-centric air traffic management services do not scale to accommodate increasing demands from conventional and new entrant operations for access to the national airspace system. One transformation that provides much needed scalability is increasing the level of autonomy of air traffic management by enabling edge agents of the system, including vehicles, operators, and third-party service suppliers, to collectively self-manage independently from the centralized service providers and enabling the automation to also take on more independent traffic management responsibility from the human agents. This paper identifies challenges to increasing the level of autonomy of air traffic management services. It describes a framework to enable a systematic identification of these challenges. The framework consists of a functional breakdown of air traffic management services and several dimensions characterizing different autonomy scales. The autonomy dimensions include the automation level between human and machine agents, the locus of control between centralized and distributed edge agents, cognitive activities for autonomous situation awareness and decision making, intelligence levels ranging from skill-based to expertise-based autonomous behavior, and uncertainty levels of the dynamics and environment in which autonomous agents operate. Several challenges are identified and categorized using the different dimensions of the autonomy framework.

automation, autonomy framework, collective autonom↗

A Discussion of Time Management Concepts and Time Constraint Equations for Multi-Rate Federation Executions

The High Level Architecture (HLA) is a simulation interoperability standard developed by the Simulation Interoperability Standards Organization (SISO) and published as the international standard IEEE 1516-2010 by the Institute for Electrical and Electronics Engineers (IEEE). HLA is a widely used standard for the development and execution of collaborative distributed simulations. HLA provides a number of Management Services to simulation developers: Federation, Declaration, Object, Ownership, Data Distribution, and Time. Of those services, Time Management Services is probably one of the least understood and least used. However, Time Management Services are critical to technical simulations like those created for space systems using the Space Reference Federation Object Model (SpaceFOM). Time Management can be used to insure data coherence and execution repeatability in distributed simulations. When combined with real time execution policies, Time Management is being used to support real time execution of mixed software and hardware in the loop integration, verification, and validation simulations for active space systems development. This paper starts by providing an overview of the HLA Time Management Services. This provides the background to discuss the challenges associated with Time Management and its use, starting with simple common rate frame scheduled simulations, then simple multi-rate simulations, and ending with complex mixed rate simulations. The authors then formulate the significant time constraint relationships between identified frame scheduling parameters. The intent of the paper is to provide a concise discussion of how to use Time Management in both simple cases and in more complex mixed frame rate federation executions.

Simulation Interoperability↗