Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lighting Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

LCLS-II Cryomodules Production at Fermilab

LCLS-II is a planned upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac will consist of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF continuous wave (CW) cryomodules that Fermilab and Jefferson Lab are currently producing in collaboration with SLAC. The LCLS-II 1.3 GHz cryomodule design is based on the European XFEL pulsed-mode cryomodule design with modifications needed for CW operation. Two prototype cryomodules had been assembled and tested. After prototype cryomodule tests, both laboratories have increased cryomodule production rate to meet the challenging LCLS-II project installation schedule requirements of approximately one cryomodule per month per laboratory. Fermilab is at half point for the production, meaning that 6 cryomodules are fully assembled and tested. This paper presents Fermilab Cryomodule Assembly Facility (CAF) infrastructure for the LCLS-II cryomodules assembly, production experience at the half point emphasizing the challenges and mitigations.

43 PARTICLE ACCELERATORS↗

LCLS-II Cryomodules Production at Fermilab

LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac will consist of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF continuous wave (CW) cryomodules that Fermilab and Jefferson Lab (JLab) will assemble in collaboration with SLAC. The LCLS-II 1.3 GHz cryomodule design is based on the European XFEL pulsed-mode cryomodule design with modifications needed for CW operation. Fermilab and JLab will each assemble and test a prototype 1.3 GHz cryomodule to assess the results of the CW modifications, in advance of 16 and 17 production 1.3 GHz cryomodules, respectively. Fermilab is solely responsible for the 3.9 GHz cryomodules. After the prototype cryomodule tests are complete and lessons learned incorporated, both laboratories will increase their cryomodule production rates to meet the challenging LCLS-II project requirement of approximately one cryomodule per month per laboratory. This paper presents the Fermilab Cryomodule Assembly Facility (CAF) infrastructure for LCLS-II cryomodule production, the Fermilab prototype 1.3 GHz CW cryomodule (pCM) assembly and readiness for production assembly.

43 PARTICLE ACCELERATORS↗

Report on LLRF

The RF system for the Pohang Light Source (PLS) storage ring was upgraded for the PLS-II project to improve from 2.5GeV/200mA to 3.0GeV/400mA. The key points of machine upgrade are to implement superconducting RF (SRF) cavities and digital low-level RF (LLRF) system. Two SRF cryomodules with cryogenic system were installed and tested during summer shutdown period of 2012. And the user service beam operation has started with the SRF system since 2013. The RF system is operating at 3.0GeV/200mA with two superconducting RF (SRF) cavities.

Source record↗

A White Paper on Design and Fabrication of SRF Deflecting Cavities for Elletra-2

Synchrotron Trieste (ST) operates an X-ray light source Elettra and plans to upgrade it to a low-emittance high-brightness X-ray source Elettra-2.0 based on a multi-bend achromat lattice. There is also a significant interest among Elettra users to pursue time-resolved studies of matter choosing the appropriate X-ray pulse duration in the range from 20 picoseconds to a few picoseconds FWHM. Recently, X. Huang (SLAC) and A. Zholents (ANL) performed a study sponsored by ST and proposed modifications to the Elettra-2.0 design that will allow production of picosecond x-ray pulses on many beamlines. They showed that two radio frequency deflecting cavities with slightly different frequencies can be installed in the ring’s sector 8 and produce time-dependent orbit deflection to a few dedicated electron bunches without affecting other regular bunches. These special bunches produce X-ray pulses in which transverse position or angle, or both, are correlated with time. The short X-ray pulse is then obtained by using a narrow slit positioned downstream in the beamline. Many technical details of the proposed modification to Elettra-2.0 are discussed in the supplemental report. We present here the design of a multicell superconducting deflecting cavity for the purpose of the ST Short Pulse X-ray (SPX) project.

43 PARTICLE ACCELERATORS↗

Shielding development for the VENUS imaging instrument

VENUS is an imaging instrument that will use a broad range of neutron wavelengths, from epithermal to cold, will include enhanced contrast mechanisms, and will offer novel energy-selective imaging techniques that directly connect the structures, properties, and function of complex engineering materials and systems to reveal practical and fundamental answers about their real-world performance. The instrument is to be built at SNS beam line 10 and will face the decoupled poisoned hydrogen moderator. The driving cost for the instrument is the beam line and instrument cave shielding. Initial scoping analyses were performed to estimate thickness and composition of shielding materials for the instrument cave and beam line. In light of the upcoming Proton Power Upgrade (PPU) project, these transport analyses were performed for proton beam on target at 1.3 GeV and 2 MW.

Popova, Irina I.↗

Sustainability Actions in Higher Education

This brochure details common sustainability actions taken by universities to reduce their energy consumption. Some of the most common actions include energy efficiency (existing building commissioning; lighting; heating, ventilation, and air conditioning upgrades; plug loads) and renewable energy (RE) (on-site or off-site solar deployment, RE procurement). We focus on the costs and benefits of energy efficiency measures and RE through the brochure while highlighting resources where readers can find more information.

14 SOLAR ENERGY↗

Providence Performing Arts Center (PPAC): Energy Efficient Upgrades

The Energy Efficient Upgrades project at the Providence Performing Arts Center represents a significant investment in modernizing infrastructure, enhancing performance capabilities and improving visitor experience, all while promoting sustainability. The project’s primary goals included the installation of building-wide WIFI coverage, replacement of the outdated theatrical lighting system with energy-efficient alternatives, upgrades to the telephone systems and enhancements to the internal sound systems, both backstage and in the lobby.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optical damage considerations in the design of the matter in extreme condition upgrade (MEC-U) laser systems

The Matter in Extreme Conditions Upgrade (MEC-U) project is a major upgrade to the MEC instrument of the LINAC Coherent Light Source (LCLS) X-ray free electron laser (XFEL) user facility at SLAC National Accelerator Laboratory. Here, the envisioned MEC upgrade will significantly enhance the capabilities of the pump laser sources in current MEC experimental station, boosting the energy of the nanosecond shock driver from 100 J to the kJ level, and increasing the power and repetition rate of the short pulse laser from 25 TW at 5 Hz to 1 PW at 10 Hz rate. Building such high energy/power pump laser systems presents challenges to minimize and mitigate against laser-induced optical damage. Here, as part of the system design, we have identified the optics at high-risk to damage and we have designed the laser systems to mitigate against these damage risks to ensure sustained facility operation.

Coating↗

City of Phoenix - Energize Phoenix Program

Energize Phoenix (EPHX) was designed as an ambitious, large-scale, three-year pilot program to provide energy efficiency upgrades in buildings, along Phoenix’s new Light Rail Corridor – part of a federal effort to reduce energy consumption and stimulate job growth, while simultaneously reducing the country’s carbon footprint and promoting a shift towards a green economy. The program was created through a 2010 competitive grant awarded to the City of Phoenix who managed the program in partnership with Arizona State University (ASU), the state’s largest university, and Arizona Public Service (APS), the state’s largest electricity provider. The U.S. Department of Energy (DOE) Better Buildings Neighborhood Program (BBNP) and the American Recovery and Reinvestment Act (ARRA) of 2009 provided $25M in funding for the EPHX program. The Light Rail Corridor runs through the heart of downtown Phoenix, making most high-rise and smaller commercial buildings eligible to participate in the EPHX program, along with a diverse mix of single and multi-family residential buildings. To ensure maximum impact and deeper market penetration, Energize Phoenix was subdivided into three unique parts: i. commercial rebate program, ii. commercial financing program, and iii. residential program Each component was managed by the City of Phoenix in partnership with APS. Phoenix was fortunate to partner with APS, which already operated robust commercial and residential rebate programs within its service territory. Phoenix tapped into the existing utility contractor network, provided specific training to over 100 contracting firms, and leveraged the APS rebate program structure (energy efficiency funding) to launch the EPHX commercial and residential rebate programs. The commercial finance program was coordinated and managed through a contract with National Bank of Arizona, NBAZ, which also provided project capital leveraging EPHX finance funds. Working in unison, approved contractors jointly produced more than 161,000 labor hours in pursuit of EPHX goals over the life of the project. Labor hours were spread among electricians, heating, ventilating and air-conditioning (HVAC) technicians, marketing professionals, engineers, sales, and administrative support staff across the approved contractor workforce. Program participants received both the utility rebate along with the EPHX rebate, and depending on project size and utility rebate structure some projects resulted in low to no-cost upgrades for customers. Phoenix also partnered with ASU, a grant sub-recipient, to leverage the institution’s expertise in research and data analysis. In this partnership, ASU accepted marketing responsibilities for the grant and partnered with DRA Communications (DRA), a Phoenix-based marketing firm, to create and communicate the message out to the marketplace. The EPHX program has completed its energy upgrade activities. A review of the work completed by ASU revealed that the EPHX program substantially exceeded the program’s stated goals by retrofitting/upgrading over 33 million sq ft of commercial space (30 million sq ft goal exceeded by 11%) and 2,014 residential units (1,700 unit goal exceeded by 18%) along the Light Rail Corridor. The program helped stimulate economic growth by adding $31million to the local economy and enhanced an already robust energy efficiency contractor network. This contractor network will continue to promote utility energy incentives to sustain energy efficiency upgrade activities in the future. Finally, EPHX helped reduce participants annual energy consumption by 135 million kilowatt-hour (kWh) translating into over $12.5 million of annual energy cost avoidance for the community. This also resulted in projected payback period of 4.5 years for total investment by all parties and reduced greenhouse gas emissions by over 95,000 metric tons of carbon dioxide equivalent (CO2e).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reach of the high-energy LHC for gluinos and top squarks in SUSY models with light Higgsinos

We investigate the top squark (stop) and gluino reach of the proposed 33 TeV energy upgrade of the Large Hadron Collider (LHC33) in the Minimal Supersymmetric Standard Model (MSSM) with light Higgsinos and relatively heavy electroweak gauginos. In our analysis, we assume that stops decay to Higgsinos via t ˜ 1 → t Z ˜ 1 , t ˜ 1 → t Z ˜ 2 , and t ˜ 1 → b W ˜ 1 with branching fractions in the ratio 1 : 1 : 2 (expected if the decay occurs dominantly via the superpotential Yukawa coupling), while gluinos decay via g ˜ → t t ˜ 1 or via three-body decays to third-generation quarks plus Higgsinos. These decay patterns are motivated by models of natural supersymmetry where Higgsinos are expected to be close in mass to m Z , but gluinos may be as heavy as 5–6 TeV, and stops may have masses up to ~ 3 TeV . We devise cuts to optimize the signals from stop and gluino pair production at LHC33. We find that experiments at LHC33 should be able to discover stops with > 5 σ significance if m t ˜ 1 < 2.3 (2.8) [3.2] TeV for an integrated luminosity of 0.3 (1) [ 3 ] ab - 1 . The corresponding reach for gluinos extends to 5 (5.5) [6] TeV. These findings imply that experiments at LHC33 should be able to discover at least one of the stop or gluino pair signals even with an integrated luminosity of 0.3 ab - 1 for natural supersymmetry models with no worse than 3% electroweak fine-tuning and quite likely both gluinos and stops for an integrated luminosity of 3 ab - 1 .

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The GlueX DIRC detector

We present the GlueX DIRC (Detection of Internally Reflected Cherenkov light) detector that is being developed to upgrade the particle identification capabilities in the forward region of the GlueX experiment at Jefferson Lab. The GlueX DIRC will utilize four existing decommissioned BaBar DIRC bar boxes, which will be oriented to form a plane roughly 4 m away from the fixed target of the experiment. A new photon camera has been designed that is based on the SuperB FDIRC prototype. The full GlueX DIRC system will consist of two such cameras, with the first planned to be built and installed in 2017. In addition, we present the current status of the design and R&D, along with the future plans of the GlueX DIRC detector.

43 PARTICLE ACCELERATORS↗

Lowering the threshold in the DAMA dark matter search

The DAMA experiment searches for Weakly Interacting Massive Particle (WIMP) dark matter via its expected but rare interactions within the detector, where the interaction rates will modulate throughout the year due to the orbital motion of the Earth. Over the course of more than 10 years of operation, DAMA has indeed detected a strong modulation in the event rate above the detector threshold of 2 keVee. Under standard assumptions regarding the dark matter halo and WIMP interactions, this signal is consistent with that expected of WIMPs of two different approximate masses: ∼ 10 GeV and ∼ 70 GeV. We examine how a lower threshold, allowed by recent upgrades to the DAMA detector, may shed light on this situation. We find that the lower threshold data should rule out one of the two mass ranges for spin-independent couplings (in the worst case, disfavoring one of the masses by still more than 2.6σ) and is likely, though not certain, to do the same for spin-dependent couplings. Furthermore, the data may indicate whether the interaction is predominantly spin-independent or spin-dependent in some cases. Our findings illustrate the importance of a low threshold in modulation searches.

79 ASTRONOMY AND ASTROPHYSICS↗

Cryogenic System for the Cryomodule Test Stand at Fermilab

This paper describes the cryogenic system for the Cryomodule Test Stand (CMTS) at the new Cryomodule Test Facility (CMTF) located at Fermilab. CMTS is designed for production testing of the 1.3 GHz and 3.9GHz cryomodules to be used in the Linac Coherent Light Source II (LCLSII), which is an upgrade to an existing accelerator at Stanford Linear Accelerator Laboratory (SLAC). This paper will focus on the cryogenic system that extends from the helium refrigeration plant to the CMTS cave. Topics covered will include component design, installation and commissioning progress, and operational plans. The paper will conclude with a description of the heat load measurement plan.

43 PARTICLE ACCELERATORS↗

A WISER way for simulating the performance of gratings

Soft X-ray monochromators for synchrotron radiation sources have been continuously developed over the years, improving energy resolution and stability. Great effort has been made in improving the surface quality of the optics involved, reaching values permitting diffraction-limited images. Still, one problem has not been solved, nor fully understood, yet: groove placing errors. Nowadays, these are one of the major factors responsible for resolving the power reduction of diffraction-gratings-based X-ray monochromators. Despite decades of use of gratings, there is not yet a universally established method for predicting and simulating the effect of groove placing errors on monochromator performance. This is especially important in the new scenario of high-coherent X-ray sources, i.e. diffraction-limited storage rings and free-electron lasers. To address this problem, in this article an approach based on WISER (Wavefront propagatIon Simulation codE libRary) is presented. WISER is a physical optics simulation package, also available in the user-friendly Orange Synchrotron Radiation Suite – OASYS. Even though it was originally conceived to assess the focusing performance of X-ray mirrors in the presence of height defects, it perfectly simulates the performance of a periodic (or quasi-periodic) structure like a diffraction grating. In this article, the way to use WISER and its application to a specific case, e.g. the design of a monochromator for the upgrade of a beamline at the Advanced Light Source, are shown. A simple rule for estimating how well the grooves are placed on a grating, based on calculation of the Strehl ratio, is also presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Production of Copper-Plated Beamline Bellows and Spools for LCLS-II

The SLAC National Accelerator Laboratory is currently constructing a major upgrade to its accelerator, the Linac Coherent Light Source II (LCLS-II). Several Department of Energy national laboratories, including the Thomas Jefferson National Accelerator Facility (JLab) and Fermi National Accelerator Laboratory (FNAL), are participating in this project. The 1.3-GHz cryomodules for this project consist of eight cavities separated by bellows (expansion joints) and spools (tube sections), which are copper plated for RF conduction. JLab is responsible for procurement of these bellows and spools, which are delivered to JLab and FNAL for assembly into cryomodules. Achieving accelerator-grade copper plating is always a challenge and requires careful specification of requirements and application of quality control processes. Due to the demanding technical requirements of this part, JLab implemented procurement strategies to make the process more efficient as well as provide process redundancy. This paper discusses the manufacturing challenges that were encountered and resolved, as well as the strategies that were employed to minimize the impact of any technical issues.

Wilson, Katherine M.↗