Decommissioning of the Nuclear Licensed Facilities at the Fontenay aux Roses CEA Center

This is a summary of the program for the decommissioning of all the CEA's facilities in Fontenay aux Roses. The particularity of this center is that it is located in a built-up area. Taking into account the particularities of the various buildings and the levels of radioactivity in them, it was possible to devise a coherent, optimized program for the CEA-FAR licensed nuclear facility decommissioning operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cleanup of Nuclear Licensed Facility 57

This summary describes the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. The French atomic energy commission's center at Fontenay aux Roses (CEA-FAR) was created in 1946 to house pile ZOE. Laboratories for fuel cycle research were installed in existing buildings at the site. Work was later concentrated on spent fuel reprocessing, in a pilot workshop referred to as the 'Usine Pu'. In the early sixties, after the dismantling of these first generation facilities, a radiochemistry laboratory dedicated to research and development work on reprocessing was constructed, designated Building 18. During the same decade, more buildings were added: Building 54, storehouses and offices, Building 91, a hall and laboratories for chemical engineering research on natural and depleted uranium. Together, these three building constitute NLF 57. Building 18 architecture featured four similar modules. Each module had three levels: a sub-level consisting of technical galleries and rooms for the liquid effluent tanks, a ground floor and roof space in which the ventilation was installed. Offices, change rooms, four laboratories and a hall were situated on the ground floor. The shielded lines were installed in the laboratories and the halls. Construction of the building took place between 1959 and 1962, and its commissioning began in 1961. The research and development programs performed in NLF 57 related to studies of the reprocessing of spent fuel, including dry methods and the Purex process, techniques for the treatment of waste (vitrification, alpha waste decontamination, etc.) as well as studies and production of transuranic elements for industry and research. In addition to this work, the necessary methods of analysis for monitoring it were also developed. The research and development program finally ended on 30 June 1995. The NLF 57 cleanup program was intended to reduce the nuclear and conventional hazards and minimize the quantities of HLW and MLW during the subsequent dismantling work. To facilitate the organization of the cleanup work, it was divided into categories by type: - treatment and removal of nuclear material, - removal of radioactive sources, - treatment and removal of aqueous liquid waste, - treatment and removal of organic effluents, - treatment and removal of solid waste, - pumping out of the PETRUS tank, - flushing and decontamination of the tanks, - cleanup of Buildings 18 and 91/54. To estimate the cost of the operations and to monitor the progress of the work, an indicator system was put in place based on work units representative of the operation. The values of the work units were periodically updated on the basis of experience feedback. The cleanup progress is now 92% complete (06/12/31): - treatment and removal of nuclear material: 100%, - removal of radioactive sources: 100%, - treatment and removal of aqueous liquid waste: 64%, - treatment and removal of organic effluents: 87%, - treatment and removal of solid waste: 99%, - pumping out of the PETRUS tank: 69%, - flushing and decontamination of tank: 75%, - section cleaning of Buildings 18 and 91/: 90%. The DRSN/SAFAR is the delegated Project Owner for cleanup and dismantling operations. It is also the prime contractor for the cleanup and dismantling operations. SAFAR itself is responsible for operations relating to the CEA activity and those with technical risks (Removal of nuclear materials, Removal of radioactive sources, Pumping out plutonium and transuranic contaminated solvent and Flushing and decontamination of tanks and pipes). All other operations are sub-contracted to specialist companies. The NLF57 cleanup program as executed is capable of attaining activity levels compatible with a future dismantling operation using known and mastered techniques and producing a minimum of HLW.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site and off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the facility in accordance with the facility's radioactive materials license(s) (RML). While both CHPRC and PFNW maintain waste databases to track all waste movements, it became evident early in the process that a tool was needed that married the two systems to better track SNM inventories and sequence waste from the point of generation, through the PFNW facility, and back to the Hanford site for final disposition. This tool, known as the Treatment Integration and Planning Tool (TIPT), has become a robust planning tool that provides real-time data to support compliant and efficient waste generation, transportation, treatment, and disposition. TIPT is developing into the next generation tool that will change the way in which legacy wastes, retrieval wastes and decontamination and decommissioning operations are conducted on the Plateau Remediation Contract (PRC). The real value of the TIPT is its predictive capability. It allows the W and FMP to map out optimal windows for processing waste through the PFNW facility, or through any process that is in some way resource limited. It allows project managers to identify and focus on problem areas before shipments are affected. It has been modified for use in broader applications to predict turnaround times and identify windows of opportunity for processing higher gram wastes through PFNW and to allow waste generators, site-wide, to accurately predict scope, cost, and schedule for waste generation to optimize processing and eliminate storage, double handling, and related costs and unnecessary safety risks. The TIPT addresses the years old problem of how to effectively predict not only what needs to be done, but when. 'When' is the key planning parameter that has been ignored by the generator and processor for many years, but has proven to be the most important parameter for both parties. While further refinement is a natural part of any development process, the current improvements on the TIPT have shown that prediction is a powerful consideration. Even in lean times expected for the foreseeable future, the improved TIPT continues to play a central role in managing our way through those times to assure facilities remain viable and available. It is recommended that other major remediation projects and waste processing facilities incorporate a tool such as TIPT to improve customer-commercial supplier communications and better optimization of resources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Surrender of Radioactive Substances (Environmental) Permits on UK Nuclear Licensed Sites - 16646

This paper is split into three, linked, parts; each part explains work being taken forward by the United Kingdom (UK) Government and/or the nuclear site regulators to apply proportionate regulatory controls before, during and after nuclear site decommissioning and clean-up. Part I of the paper describes work led by UK Government to examine credible options for a step-wise removal of those safety, security and environmental protection regulations that apply to nuclear site decommissioning and clean-up. Any removal of regulations will have to take due account of and be proportionate to the residual risk following cessation of all clean-up works. Part II of the paper describes the approach used by the UK Environment Agencies to regulate final site clean-up of UK nuclear licensed sites. Ultimately, clean-up will result in nuclear sites being released from radioactive substances regulation. Part III of the paper links Parts I and II of the paper together by describing how the UK Environment Agencies will apply proportionate regulation to the clean-up of the 140-acre Dounreay site in Caithness which is the largest nuclear clean-up project in Scotland and the second largest in the UK, after Sellafield. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Regulatory Strategy for Post Operational Clean Out Activities at Sellafield Limited Nuclear Licensed Site - 20273

The Thermal Oxide Reprocessing Plant (THORP) at the Sellafield nuclear licensed site carried out its final commercial shear of spent nuclear fuel in November 2018, since when the facility has undergone rundown prior to cessation of operations. The Magnox Reprocessing Facility (MRF) is also due to cease operating, around the end of 2020. Following the cessation of spent fuel reprocessing, the facilities and supporting infrastructure will transition into Post Operational Clean Out (POCO), which will become an increasingly significant portion of Sellafield Limited's (SL) activities. POCO is defined as the set of activities undertaken directly after a nuclear facility comes to the end of its operational life, in order to place the plant in a suitable state for the subsequent decommissioning steps. The decommissioning strategy at SL is for deferred dismantling of these facilities, which will be subject to a period of Surveillance and Maintenance (S and M) following completion of POCO. This paper outlines the development and implementation of a regulatory strategy for POCO activities at the Sellafield site by the Office for Nuclear Regulation (ONR), the independent nuclear safety, transport and security regulator in the United Kingdom. The paper also describes how this regulatory strategy is applied to nuclear installations undergoing transition into POCO and subsequent decommissioning. ONR works jointly with the Environment Agency, as the environmental regulators in England, to ensure that matters relevant to them have been duly considered. In developing a regulatory strategy, ONR has taken a site-wide approach, moving away from regulation on a facility-by-facility basis, to promote consistency, as well as maximising efficiency and effectiveness. The aim of this integrated approach was to prevent complications during future decommissioning and dismantling that have been experienced previously at similar facilities in France. The strategy recognised that once reprocessing operations are concluded, the hazard present will be reduced significantly, which provides the opportunity for ONR to consider how best to deliver a proportionate approach to regulatory interventions. Once POCO has been completed and the facility has transitioned into a period of S and M, the scale and frequency of ONR's interventions will reduce, commensurate with the safety case covering the remaining hazard and activities associated with maintaining the facility prior to final decommissioning. This approach allows ONR to consider risks holistically, considering the full life cycle of the facility and by taking due account of the interdependencies between facilities across the site. The strategy also aligns with existing regulation of high hazard and risk reduction activities, which remain ONR's top priority. As SL progresses with POCO activities in THORP and across the rest of the site, ONR will review its regulatory strategy to ensure that the intended safety benefits are realised. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Poster — Thur Eve — 54: Radiotherapy and Non-Radiotherapy Safety Practices Beyond Licensing Expectations

The Canadian Nuclear Safety Commission (CNSC) regulates the use of nuclear energy and materials to protect the health, safety and security of Canadians and the environment, and to implement Canada's international obligations on the peaceful use of nuclear energy. In order to perform this regulatory activity, the CNSC issue licences and has its staff perform inspections to verify conformity to the aspects of those licences. Within the CNSC, the Accelerators and Class II Facilities Division (ACFD) is responsible for the regulatory oversight of Class II Prescribed Equipment used in medical, academic, and industrial sectors in Canada. In performing inspections, ACFD has encountered licensees with practices that are either below, meet or exceed regulatory expectations in specific areas. Unfortunately, none of these practices are ever communicated to the broader Class II community to help other licensees avoid the same problem or achieve high standards. In this poster, ACFD will highlight safety practices that go beyond expectations. These practices are taken from observations during site inspections between 2007 and 2013 and will be presented in six areas: Procedures, Participation, Awareness, Equipment, Servicing and Software. Each area briefly discusses a number of practices that the CNSC feels went beyond the expectations dictated by the licence. Where possible, names are added of the contact people at the centres who can be reached for full details of their implementations. It is hoped that this communication will assist other licensees to achieve these same high levels of compliance and possibly go beyond.

07 ISOTOPE AND RADIATION SOURCES↗

Technical Data to Justify Full Burnup Credit in Criticality Safety Licensing Analyses

Enercon Services, Inc. (ENERCON) was requested under Task Order #2 to identify scientific and technical data needed to benchmark and justify Full Burnup Credit, which adds 16 fission products and 4 minor actinides to Actinide-Only burnup credit. The historical perspective for Full Burnup Credit is discussed, and interviews of organizations participating in burnup credit activities are summarized as a basis for identifying additional data needs and making recommendation. Input from burnup credit participants representing two segments of the commercial nuclear industry is provided. First, the Electric Power Research Institute (EPRI) has been very active in the development of Full Burnup Credit, representing the interests of nuclear utilities in achieving capacity gains for storage and transport casks. EPRI and its utility customers are interested in a swift resolution of the validation issues that are delaying the implementation of Full Burnup Credit [EPRI 2010b]. Second, used nuclear fuel storage and transportation Cask Vendors favor improving burnup credit beyond Actinide-Only burnup credit, although their discussion of specific burnup credit achievements and data needs was limited citing business sensitive and technical proprietary concerns. While Cask Vendor proprietary items are not specifically identified in this report, the needs of all nuclear industry participants are reflected in the conclusions and recommendations of this report. In addition, Oak Ridge National Laboratory (ORNL) and Sandia National Laboratory (SNL) were interviewed for their input into additional data needs to achieve Full Burnup Credit. ORNL was very open to discussions of Full Burnup Credit, with several telecoms and a visit by ENERCON to ORNL. For many years, ORNL has provided extensive support to the NRC regarding burnup credit in all of its forms. Discussions with ORNL focused on potential resolutions to the validation issues for the use of fission products. SNL was helpful in ENERCON's understanding of the difficult issues related to obtaining and analyzing additional cross section test data to support Full Burnup Credit. A PIRT (Phenomena Identification and Ranking Table) analysis was performed by ENERCON to evaluate the costs and benefits of acquiring different types of nuclear data in support of Full Burnup Credit. A PIRT exercise is a formal expert elicitation process with the final output being the ranking tables. The PIRT analysis (Table 7-4: Results of PIRT Evaluation) showed that the acquisition of additional Actinide-Only experimental data, although beneficial, was associated with high cost and is not necessarily needed. The conclusion was that the existing Radiochemical Assay (RCA) data plus the French Haut Taux de Combustion (HTC) and handbook Laboratory Critical Experiment (LCE) data provide adequate benchmark validation for Actinide-Only Burnup Credit. The PIRT analysis indicated that the costs and schedule to obtain sufficient additional experimental data to support the addition of 16 fission products to Actinide-Only Burnup Credit to produce Full Burnup Credit are quite substantial. ENERCON estimates the cost to be $50M to $100M with a schedule of five or more years. The PIRT analysis highlights another option for fission product burnup credit, which is the application of computer-based uncertainty analyses (S/U - Sensitivity/Uncertainty methodologies), confirmed by the limited experimental data that is already available. S/U analyses essentially transform cross section uncertainty information contained in the cross section libraries into a reactivity bias and uncertainty. Recent work by ORNL and EPRI has shown that a methodology to support Full Burnup Credit is possible using a combination of traditional RCA and LCE validation plus S/U validation for fission product isotopics and cross sections. Further, the most recent cross section data (ENDF/B-VII) can be incorporated into the burnup credit codes at a reasonable cost compared to the acquisition of equivalent experimental data. ENERCON concludes that even with the costs of code data library updating, the use of S/U analysis methodologies could be accomplished on a shorter schedule and a lower cost than the gathering of sufficient experimental data. ENERCON estimates of the costs of an updated S/U computer code and data suite are $5M to $10M with a schedule of two to three years. Recent ORNL analyses using the S/U analysis method show that the bias and uncertainty values for fission product cross sections are smaller than previously expected. This result is confirmed by a similar EPRI approach using different data and computer codes. ENERCON also found that some issues regarding the implementation of burnup credit appear to have been successfully resolved especially the axial burnup profile issue and the depletion parameter issue. These issues were resolved through data gathering activities at the Yucca Mountain Project and ORNL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: LMP Lessons Learned, Best Practices, and Frequently Asked Questions

This report captures lessons learned, best practices, and frequently asked questions with responses gleaned from the experiences of early adopters of the LMP RIPB process. Interviews were conducted in late 2019 with five non-LWR design organizations to gather their feedback on the application of the LMP RIPB process under real production conditions. The overall feedback from the reactor developers is that the LMP RIPB process can be successfully implemented with material benefits to the designer. As with any new processes, numerous challenges and questions were relayed by the designers. These challenges have been translated into lessons learned and best practices. Those two sections address both technical and organizational aspects of implementing the LMP RIPB process. Questions that were asked by multiple designers were turned into “frequently asked questions” and responses were provided by the LMP team.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors (Final Project Report)

Advanced (i.e., non-light-water) reactor technologies offer developers new opportunities to enhance the reliability, efficiency, and safety of nuclear power reactors through changes in fundamental design and operation. A variety of advanced design concepts are being developed that generally trend toward increased reliance on innovative, inherent, and passive safety features. Many of these features are substantially different from components now found in large light water reactors (LWRs) that dominate the commercial operating fleet. Similarly, non-light water reactor (non-LWR) suppliers are also pursuing market niches quite different from the regional baseload power generation sites typically associated with large LWR facilities.

42 ENGINEERING↗

A platform for effective requirements management and collaboration in nuclear compliance and licensing

Buoyed by its promise as a cost effective and low-carbon-footprint source of electricity, the nuclear industry is in the midst of a world-wide renaissance. However, significant challenges, including responding to increased safety and regulatory mandates, making a smooth transition to next-generation reactor technology, and dealing with the adoption of digital instrumentation and control (I and C) systems that rely heavily on software must be effectively addressed to ensure the momentum continues. New technology solutions, such as those developed by IBM's Rational business unit, coupled with well codified processes, policies and best practices leveraged across the nuclear ecosystem's participants have been shown to aid in overcoming these obstacles. This paper will highlight some of the compliance and collaboration challenges facing the extended nuclear ecosystem, describe a potential solution that can aid in addressing the challenges, and present several examples of where the solution has been implemented in the nuclear space. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design change management in regulation of nuclear fleets: World nuclear association's working groups on Cooperation in Reactor Design Evaluation and Licensing (CORDEL)

The 60 year life of a reactor means that a plant will undergo change during its life. To ensure continuing safety, changes must be made with a full understanding of the design intent. With this aim, regulators require that each operating organisation should have a formally designated entity responsible for complete design knowledge in regard to plant safety. INSAG-19 calls such an entity 'Design Authority'. This requirement is difficult to achieve, especially as the number of countries and utilities operating plants increases. Some of these operating organisations will be new, and some will be small. For Gen III plants sold on a turnkey basis, it is even more challenging for the operating company to develop and retain the full knowledge needed for this role. CORDEL's Task Force entitled 'Design Change Management' is investigating options for effective design change management with the aim to support design standardization throughout a fleet's lifetime by means of enhanced international cooperation within industry and regulators. This paper starts with considering the causes of design change and identifies reasons for the increased beneficial involvement of the plant's original vendor in the design change process. A key central theme running through the paper is the definition of responsibilities for design change. Various existing mechanisms of vendor-operator interfaces over design change and how they are managed in different organisational and regulatory environments around the world are considered, with the functionality of Owners Groups and Design Authority being central. The roles played in the design change process by vendors, utilities, regulators, owners' groups and other organisations such as WANO are considered The aerospace industry approach to Design Authority has been assessed to consider what lessons might be learned. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Regulatory inspection of the provision of disposability assessment and waste packaging advice in the UK to provide confidence that higher activity waste stored on licensed sites will be suitable for safe handling, transport and disposal - 15088

Radioactive Waste Management Limited (RWM), the developer and future operator of a geological disposal facility (GDF) in the United Kingdom, operates a disposability assessment process to minimise the risk that current conditioning and packaging of higher activity wastes (HAW) will result in packages incompatible with geological disposal in the future. Specialists in nuclear and environmental safety from the Office for Nuclear Regulation (ONR) and the Environment Agency (EA) in 2013/14 completed an inspection of the RWM's process of disposability assessment. The inspection gave the regulators confidence that RWM has in place a systematic process to provide an important means of reducing risks associated with waste packaging in advance of an operational GDF and that the process of disposability assessment is providing the necessary information for licensees to assure future HAW disposal to the GDF. This work forms part of our continuing programme to review RWM's work related to geological disposal of higher activity radioactive waste (HAW). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of an AREVA Mobile Evaporator Design Used Successfully at NRC Licensed U.S. Commercial Nuclear Sites to Support Hanford Site Operations - 18134

The U.S. Department of Energy (DOE), Office of River Protection (ORP), manages the River Protection Project at the Hanford site in the South Eastern corner of Washington State in the Pacific Northwest of the United States. The mission of the River Protection Project is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. The Site Tank Operations Contractor (Washington River Protection Solutions (WRPS)) via its site operations teams creates additional space in the Double Shell Tanks (DSTs) using the site's only remaining operational evaporator - 242-A. The current 242-A Evaporator has long been identified as a potential single point of failure that in the event of a major breakdown, could significantly impact retrieval operations at the Hanford Site. Areva has experience both on the Hanford site as an integrated subcontractor to the mission and in the design, procurement and construction of a mobile forced circulation evaporator unit designed to be used on Nuclear Regulatory Commission commercial nuclear utility sites. The mobile unit has been used at the following nuclear power plants: SONGS, Salem, Davis Besse, Waterford and Palo Verde. It was designed to take spent Water-EDTA based chemical cleaning solvent and evaporate water off to reduce the volume of waste required to go through downstream processes. It was further designed to fit inside ISO shipping containers. A multi-step approach will be used to: 1. review lessons learned from the previous DOE study for deploying a mobile evaporator on the Hanford sit, 2. evaluate the proposed waste streams and the required throughput and waste arising, sizing the evaporator appropriately, 3. develop a concept design requirements document for the use of a customized evaporator to meet the Hanford need 4. Design, and build a mobile evaporator and 5. Test, install and commission at a site to be agreed with WRPS/DOE. With an overall budget for the approach described of around $35 m, an operational evaporator could be delivered to site in 18-24 months from the approval of a detailed design package. Potential befits include the elimination of the 242-A evaporator as a single point failure, the creation of additional DST tank space and the elimination of the need to stage waste at the 242-A evaporator by moving the mobile unit to a location where is could be deployed at or close to the tank such as in 200W. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗