Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAUNCHING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Corrosion Engineering: Challenges in a Spaceport Environment

The overarching theme of this internship at NASA's Kennedy Space Center (KSC) was corrosion engineering and control, a subset of materials engineering located under the NE-L4 branch. KSC, as a costal launch facility, is subjected to incredibly corrosive conditions in the form of high salt content from the nearby ocean, high temperatures and humidity, and frequent storms. As such, corrosion control is a vital part of operations here at KSC. To tackle these issues, this internship focused on three main projects; creating a corrosion control database, revamping KSC's Corrosion Lab website, and running corrosion studies in the lab and in the field.

MacWatters, Matthew↗

NASA KSC Intern Final Report - Virtual Reality in STEM Engagement

For this internship, I was a part of the multi-center NextGen STEM (Science, Technology, Engineering, and Mathematics) pilot. Specifically, I worked with the Developing Commercial Crew Program (CCP) Capabilities team that focuses on human spaceflight to the space station with NASA’s commercial partners. Composed of NASA employees and contractors (who are connected to KSC, JSC, and LaRC), they work to ensure that students will experience traditional classroom content and be immersed in emerging technologies in order to explore Commercial Crew missions and launch facilities. This group is in the process of creating educational products and resources to inspire the next generation to pursue STEM and to allow educators to have access to unique and enticing STEM activities. These products include: age-appropriate classroom lessons (including activity sheets and challenges) for kindergarten through twelfth grade; a CCP app and corresponding guide; learning experiences for students as well as educators; and virtual field trips and tours using NASA-created Virtual Reality (VR) videos and a custom VR app. My particular assignment was managing the VR equipment, developing an understanding of how to maximize the use of the equipment, creating documents that explain and convey the operations and procedures concerning the equipment (including lessons learned from equipment use), and training others to utilize the equipment effectively and correctly for conference events and group demonstrations. Over the course of this internship, I helped my team outline and learn essential procedures of operation for the VR equipment, solved technology problems that arose (due to the nature of creating unique products), and encouraged audiences at KSC and various conferences to consider using the CCP VR videos in their classrooms as an opportunity to engage and challenge the next generation to pursue STEM careers.

STEM↗

Concept of Operations and Checkout Testing for Green Propellant Loading System

Low toxicity propulsion, or Green Propulsion, is increasingly being considered for use on spacecraft following the successful demonstration during the Green Propellant Infusion Mission in 2020. One of these missions is JPL’s Lunar Flashlight (LF), a polar orbiting 12U CubeSat that uses lasers to investigate water ice deposits on the moon’s surface. For the past 3 years, Marshall Space Flight Center has developed the ASCENT propulsion system for LF, along with a green propellant loading system to service the spacecraft. The Propellant Loading System (PLS) is composed of 3 mobile carts designed to operate at a variety of launch facilities and handle the 2 primary green propellants, LMP-103S and ASCENT. In anticipation of LF propellant loading, the PLS was recently installed into an MSFC facility for checkout operations. In the winter of 2020, a simulant spacecraft was successfully loaded with water, pressurized to flight pressure, and drained back into the system. These checkouts drove the concept of operations for final spacecraft loading and informed minor modifications to the PLS for better operability. Additionally, a parallel effort was started to design the next generation of the PLS based on water flow lessons learned. With water flow testing complete, propellant checkouts and wet dress rehearsals with spacecraft pathfinder hardware are anticipated to begin in late Spring 2021.

Green Propulsion↗

The Influence of Chemical Descriptors on the Reactivity of Potential Hypergolic Fuels With Hydrogen Peroxide

The state-of-the-art for storable hypergolic bipropellant systems is monomethylhydrazine (MMH) and mixed oxides of nitrogen (MON). While MMH and MON provide fast and highly reliable hypergolic ignition with excellent propulsive performance, they suffer from safety concerns impacting their production, cost, and supply to various test and launch facilities. In contrast, identifying and demonstrating low-toxicity fuels hypergolic with rocket grade hydrogen peroxide (H2O2) has been challenging with long ignition delay (IDT) and low propulsive performance affecting their deployment in flight systems. This work describes a preliminary observational study to assess the effects of molecular descriptors suspected to predict the reactivity and hypergolicity of compounds within the same chemical class (i.e., thioamide). The approach centered on evaluating functional groups, electrostatic potential, number of carbons, dipole moment, and adiabatic ionization energy. Thiourea is hypergolic with 89.2 wt.% H2O2 (minimum IDT of 21.9 ms) and was selected as a core fuel to study the reactivity of derived fuels with different functionalities. Additionally, the chemical properties were calculated with the Gaussian16 suite. The results showed that group substitution and generally increased number of carbons on thiourea increases IDT. It was observed that a more positively charged sulfur atom in the thioamide does not increase the reactivity towards H2O2. The dipole moment analysis revealed an overall trend of decreasing IDT due to increasing dipole moment. Finally, a lower adiabatic ionization energy related to increased IDTs for most cases. Additional chemical classes comprising a wider range of functionalities and electrophilic attributes are being investigated in on-going work.

Propellant↗

[X-33 Launch and Landing Facilities]

Sverdrup is responsible for the design, construction and activation of the X-33 Flight Operations Center at Edwards Air Force Base and for providing assistance in activating the X-33 Landing Sites. The past year has seen the completion of the construction of the X-33 Flight Operations Center. Construction was completed in December of 1998, with systems checkout and testing continuing into early 1999. Integration of the site with LMCMS and other partner-supplied systems began in December and will continue through rollout of the X-33 vehicle. The construction of the X-33 Launch Complex has been performed within the Edwards AFB and Air Force Research Laboratory (AFRL) systems with no substantial interference to either parties. A high level of cooperation exists between Sverdrup, Edwards AFB, and the Air Force Research Laboratory in the areas of access, training, security, and operations. There have been no conflicts between programs that have not been accommodated. Development of the landing sites is progressing with many of the modifications necessary underway. GSE commitments are in place. The personnel training program developed by Sverdrup for persons entering the launch site construction areas, was modified by Lockheed for use in training and access control to the Center during flight operations to maximize safety and minimize intrusion upon the environment. Close cooperation between Sverdrup, the construction workers, and the environmental biologist permitted construction to proceed in a timely fashion without harm to the wildlife, in particular, the Desert Tortoise. Although the entire X-33 site encompasses approximately 50 acres including a new access road, only the areas directly impacted by the construction were cleared to minimize the impact on the environment. A total of about 30 acres was actually disturbed.

Source record↗

The Wallops Flight Facility Model for an Integrated Federal/Commercial Launch Range

Historically, the federal government has been the predominant purchaser of space launches in the United States. The government met its needs through purchase of hardware and services. It also provided the infrastructure necessary to conduct launch operations through federal launch ranges, both military and NASA. Under this model, the government had the complete ownership, responsibility, liability, and expense for launch activities. As the commercial space sector grew, there emerged a corresponding growth in demand for launch range services. However, the expense and complexity of activities has thus far deterred a rapid rise in the establishment of purely commercial launch sites. In this context, purely commercial is defined as "without benefit of capabilities provided by the federal government." Consistent with the Commercial Space Launch Act, in recent years NASA and the Air Force have supported commercial launches from government launch ranges on a cost-reimbursable, non-interference basis. In this mode the commercial launch service providers contract with the government to provide services including use of facilities, tracking and data services, and range safety. As the commercial market projections began to show significant opportunities for economic development, several states established spaceports to provide the services necessary to meet these projected commercial needs. In 1997, NASA agreed to the establishment of the Virginia Space Flight Center (VSFC) at the Wallops Flight Facility. Under this arrangement, NASA agreed to allow Virginia Commercial Space Flight Authority (VCSFA) to construct facilities on NASA property and agreed to provide services in accordance with the Space Act of 1958 and the Commercial Space Launch Act of 1984 (as amended) to support VSFC launch customers. The relationship between NASA and VCSFA, however, has evolved beyond a customer supplier relationship. A partnership relationship has emerged which pairs the strengths of the established NASA test range and the state-sponsored, commercial launch facility provider, in an attempt to satisfy the needs for flexible, low-cost access to space. Furthermore, the future of the NASA/Wallops Test Range is closely linked with the success of VCSFA in promoting commercial launches from Wallops. This paper will describe the changing paradigm of the federal launch range and the unique aspects of the NASA/Wallops Facility relationship with VCSFA. Discussion will include institutional cost-sharing, business development and marketing, joint educational programs, and strategic planning.

Underwood, Bruce E.↗

Temporal Variability of Upper-level Winds at the Eastern Range, Western Range and Wallops Flight Facility

Space launch vehicles incorporate upper-level wind profiles to determine wind effects on the vehicle and for a commit to launch decision. These assessments incorporate wind profiles measured hours prior to launch and may not represent the actual wind the vehicle will fly through. Uncertainty in the upper-level winds over the time period between the assessment and launch can be mitigated by a statistical analysis of wind change over time periods of interest using historical data from the launch range. Five sets of temporal wind pairs at various times (.75, 1.5, 2, 3 and 4-hrs) at the Eastern Range, Western Range and Wallops Flight Facility were developed for use in upper-level wind assessments. Database development procedures as well as statistical analysis of temporal wind variability at each launch range will be presented.

Decker, Ryan K.↗

Temporal Variability of Upper-level Winds at the Eastern Range, Western Range and Wallops Flight Facility

Space launch vehicles incorporate upper-level wind profiles to determine wind effects on the vehicle and for a commit to launch decision. These assessments incorporate wind profiles measured hours prior to launch and may not represent the actual wind the vehicle will fly through. Uncertainty in the upper-level winds over the time period between the assessment and launch can be mitigated by a statistical analysis of wind change over time periods of interest using historical data from the launch range. Five sets of temporal wind pairs at various times (.75, 1.5, 2, 3 and 4-hrs) at the Eastern Range, Western Range and Wallops Flight Facility were developed for use in upper-level wind assessments. Database development procedures as well as statistical analysis of temporal wind variability at each launch range will be presented.

Decker, Ryan↗

Advanced launch system Component Test Facility

Upgrading of existing test facilities required for development of liquid fuel rocket engines for advanced launch systems is discussed. The Component Test Facility (CTF) for testing generators and turbopumps assemblies of the future engine is presented with emphasis on design criteria, design, test frequency, test duration, safety, and operational issues of the cryogenic propellant and high-pressure gas systems. Attention is also given to methods of controlling propellant temperatures and flows to the test components; pressurization of propellants accomplished with high-pressure hydrogen and nitrogen gases; and use of high-pressure pumps and vaporizers, which convert liquid nitrogen and hydrogen to gases at pressures up to 15,000 psig.

Pitalo, Gerald A.↗

Launching the Future... Constellation Program at KSC

With the Constellation Program, NASA is entering a new age of space exploration that will take us back to the Moon, to Mars, and beyond, and NASA is developing the new technology and vehicles to take us there. At the forefront are the Orion spacecraft and the Ares I launch vehicle. As NASA's gateway to space, Kennedy Space Center (KSC) will process and launch the new vehicles. This will require new systems and extensive changes to existing infrastructure. KSC is designing a new mobile launcher, a new launch control system, and new ground support equipment; modifying the Vehicle Assembly Building, one of the launch pads, and other facilities; and launching the Ares I-X flight test. It is an exciting and challenging time to be an engineer at KSC.

Denson, Erik C.↗

Temporal Variability of Upper-level Winds at the Eastern Range, Western Range and Wallops Flight Facility

Space launch vehicle commit-to-launch decisions include an assessment of the upper-level (UL) atmospheric wind environment to assess the vehicle's controllability and structural integrity during ascent. These assessments occur at predetermined times during the launch countdown based on measured wind data obtained prior to the assessment. However, the pre-launch measured winds may not represent the wind environment during the vehicle ascent. Uncertainty in the UL winds over the time period between the assessment and launch can be mitigated by a statistical analysis of wind change over time periods of interest using historical data from the launch range. Without historical data, theoretical wind models must be used, which can result in inaccurate wind placards that misrepresent launch availability. Using an overconservative model could result in overly restrictive vehicle wind placards, thus potentially reducing launch availability. Conversely, using an under-conservative model could result in launching into winds that might damage or destroy the vehicle. A large sample of measured wind profiles best characterizes the wind change environment. These historical databases consist of a certain number of wind pairs, where two wind profile measurements spaced by the time period of interest define a pair.

Decker, Ryan K.↗

Space flight operations

Space flight operations - launch site, deep space instrumentation facility, operations complex, launch site, communications facility, and checkout facility

SPACE FLIGHT↗