Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LABORATORY SYSTEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

UNREVIEWED DISPOSAL QUESTION EVALUATION: Disposal of the Princeton Plasma Physics Laboratory Torus Cleanup System Molecular Sieve Dryer Bed at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the Princeton Plasma Physics Laboratory (PPPL) Torus Cleanup System Molecular Sieve Dryer Bed (MSDB), PERM000000043, Revision 0 (Perma-Fix [PERM] 2021), is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the PPPL Torus Cleanup System MSDB meets all performance objectives of DOE Manual DOE M 435.1-1, Radioactive Waste Management Manual, Chapter IV, Section P (DOE 1999). The PPPL Torus Cleanup System MSDB waste stream is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sandia National Laboratories, California Environmental Management System program manual

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sandia National Laboratories, California Environmental Management System Program Manual.

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sandia National Laboratories, California Environmental Management System Program Manual

Sandia National Laboratories, California (SNL/CA) has maintained environmental functions to assist with regulatory compliance for more than 30 years. During 2005, these existing functions were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009 and 2012. SNL/CA’s EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA’s EMS Program benefits from two corporate functional programs (Facilities Energy & Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

Larsen, Barbara L.↗

Handling Large and Complex Data in a Photovoltaic Research Institution Using a Custom Laboratory Information Management System

Twenty-five years ago the desktop computer started becoming ubiquitous in the scientific lab. Researchers were delighted with its ability to both control instrumentation and acquire data on a single system, but they were not completely satisfied. There were often gaps in knowledge that they thought might be gained if they just had more data and they could get the data faster. Computer technology has evolved in keeping with Moore’s Law meeting those desires; however those improvements have of late become both a boon and bane for researchers. Computers are now capable of producing high speed data streams containing terabytes of information; capabilities that evolved faster than envisioned last century. Software to handle large scientific data sets has not kept up. How much information might be lost through accidental mismanagement or how many discoveries are missed through data overload are now vital questions. An important new task in most scientific disciplines involves developing methods to address those issues and to create the software that can handle large data sets with an eye towards scalability. This software must create archived, indexed, and searchable data from heterogeneous instrumentation for the implementation of a strong data-driven materials development strategy. At the National Center for Photovoltaics in the National Renewable Energy Laboratory, we began development a few years ago on a Laboratory Information Management System (LIMS) designed to handle lab-wide scientific data acquisition, management, processing and mining needs for physics and materials science data, and with a specific focus towards future scalability for new equipment or research focuses. We will present the decisions, processes, and problems we went through while building our LIMS system for materials research, its current operational state and our steps for future development.

14 SOLAR ENERGY↗

Comparison of parameter sensitivities between a laboratory and field scale model of uranium transport in a dual domain, distributed-rate reactive system

A laboratory-derived conceptual and numerical model for U(VI) transport at the Hanford 300A site, Washington, USA, was applied to a range of field-scale scenarios of different complexity to systematically evaluate model parameter sensitivities. The model, originally developed from column experiment data, included distributed-rate surface complexation kinetics of U(VI), aqueous speciation, and physical non-equilibrium transport processes. A rigorous parameter sensitivity analysis was carried out with respect to different state variables: concentrations, mass fluxes, total mass and spatial moments of dissolved U(VI) for laboratory systems, and various simulation scenarios that represented the field-scale characteristics at the Hanford 300A site. The field-scenarios accounted for transient groundwater flow and variable geochemical conditions driven by frequent water level changes of the nearby Columbia River. Simulations indicated that the transient conditions significantly affected U(VI) plume migration at the site. The parameter sensitivities were largely similar between the laboratory and field scale systems. Where differences existed, they were shown to result from differing degrees of U(VI) adsorption disequilibrium caused by hydraulic or hydrogeochemical conditions. Adorption disequilibrium was found to differ (i) between short duration peak flow events at the field scale and much longer flow events in the laboratory, (ii) for changing groundwater chemical compositions due to river water intrusion, and (iii) for different sampling locations at the field scale. Parameter sensitivities were also found to vary with respect to the different investigated state variables. An approach is demonstrated that elucidates the most important parameters of a laboratory-scale model that must constrained in both the laboratory and field for meaningful field application.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Laboratory-Scale Microgrid System for Control of Power Distribution in Local Energy Networks - Part I: Theory and Design

One of the promising solutions to achieve sustainable energy systems in future smart cities is to deploy microgrids in local energy networks. Due to the decentralized nature of microgrids, large-scale utilization of these resources will increase the reliability of the energy systems as well as facilitating the integration of renewable energy resources to enable more environmentally-friendly energy network. This chapter presents development of a highly reconfigurable, laboratory-scale microgrid testbed. The proposed microgrid system integrates several distributed generation (DG) units representing photovoltaic panel, wind turbine, battery energy storage and etc. The schematic of the proposed system can be customized to investigate numerous grid architectures and control scenarios. In this study, the loads and energy resource allocation are realized by assessment of the loads and resources priority. Therefore, a hierarchical procedure will take place to allocate the power to different buses in microgrid. In the next chapter, we describe the test-bed implementation of the designed microgrid.

design↗

Development of radially movable multichannel Reynolds stress probe system for a cylindrical laboratory plasma

A new radially movable multichannel azimuthal probe system has been developed for measuring azimuthal and radial profiles of electrostatic Reynolds stress (RS) per mass density of microscale fluctuations for a cylindrical laboratory plasma. The system is composed of 16 probe units arranged azimuthally. Each probe unit has six electrodes to simultaneously measure azimuthal and radial electric fields for obtaining RS. The advantage of the system is that each probe unit is radially movable to measure azimuthal RS profiles at arbitrary radial locations as well as two-dimensional structures of fluctuations. The first result from temporal observation of fluctuation azimuthal profile presents that a low-frequency fluctuation (1-2 kHz) synchronizes oscillating Reynolds stress. In addition, radial scanning of the probe system simultaneously demonstrates two-dimensional patterns of mode structure and nonlinear forces with frequency f= 1.5 kHz and azimuthal mode number m= 1.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A comparative analysis of numerical approaches for the description of gas flow in clay-based repository systems: From a laboratory to a large-scale gas injection test

There is nowadays a consensus among many countries that geological disposal is a favourable solution for the long-term management. Although different host formations and different barrier systems are under consideration around the world, clay-based materials form an important component for waste isolation in most national programmes. Hence, a good comprehension of the effect of gas flow on the hydro-mechanical behaviour of clay-based soils is essential, both at laboratory and field scale. Task B under the international cooperative project DECOVALEX-2023 has recently shown that, after some enhancement, models can be employed to reproduce laboratory scale tests, even with different sample geometries 37 . However, further work is required to understand whether they can be applied to simulate a large-scale experiment. Up-scaling of models for the advective transport of gas through clay-based low permeable material presents a number of problems related to the difficulty in obtaining consistent hydrogeological parameters and constitutive relationships at both laboratory and field scale. Based on a unique dataset from a large-scale gas injection test (Lasgit) performed at the Äspö Hard Rock Laboratory (Sweden), Task B within DECOVALEX-2023 has explored the refinement of these numerical strategies applied to the simulation of gas flow. Work performed within the task reveals that codes do not need to be substantially modified from the laboratory models to reproduce full-scale tests: indeed, model parameters calibrated and validated at laboratory scale have been applied to predict field scale gas flow at Lasgit, including peak gas pressure and injected cumulative gas volume. By means of (1) the introduction of interfaces between blocks to reflect the experimental configuration and the (2) adjustment of some parameters (e.g., higher permeability), the updated models are able to represent most of the key features observed in the experimental data, even at a large scale.

Tamayo-Mas, E↗

Development of a laser system of the laboratory AVLIS complex for producing isotopes and radionuclides

The use of atomic vapour laser isotope separation (AVLIS) for solving a number of urgent problems (formation of {sup 177}Lu radionuclides for medical applications, {sup 63}Ni radionuclides for betavoltaic power supplies and {sup 150}Nd isotope for searching for neutrinoless double β decay and neutrino mass) is considered. An efficient three-step scheme of photoionisation of neodymium atoms through the 50474-cm{sup −1} autoionising state with radiation wavelengths of the corresponding stages of λ{sub 1} = 6289.7 Å, λ{sub 2} = 5609.4 Å and λ{sub 3} = 5972.1 Å is developed. The average saturation intensity of the autoionising transition is ∼6 W cm{sup −2}, a value consistent with the characteristics of the previously developed photoionisation schemes for lutetium and nickel. A compact laser system for the technological AVLIS complex, designed to produce radionuclides and isotopes under laboratory conditions, is developed based on the experimental results. (laser applications and other topics in quantum electronics)

07 ISOTOPE AND RADIATION SOURCES↗

Sandia National Laboratories, California sewer system management plan.

A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Site Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan. Elements of this Plan are under development in accordance with the SWRCB's schedule.

54 ENVIRONMENTAL SCIENCES↗

FUSRAP Case Study - Benefits and Lessons Learned from Implementation of a Modern Data Solution at Maywood - 18399

This paper focuses on data production and management practices dating back to 1999 that continue to evolve to support the project today. In 2000, the FUSRAP Maywood Project began using a software environmental data management system and laboratory information management system, developed by a single database administrator (DA) and authored in Microsoft Access{sup TM} (MS Access). The original databases included basic functionality including sample number assignment and label generation, tracking of LIMS gamma spec QC and assignment of basic qualifiers and basic database queries. The DA continued over the next fifteen years to refine the EDMS/LIMS by integrating project-specific data evaluation guidance document processes and Quality Assurance/Quality Control (QA/QC) charting and excursion warning tools. With the retirement of the original DA, the U.S. Army Corps of Engineers (USACE)-Cabrera Team procured and implemented a commercial-leaning solution using modern database tools and an established EDMS vendor. For the database transition process, the project team established and configured the new EDMS/LIMS with basic architecture and accessibility; evaluated existing workflows; established/revised LIMS and EDMS-related documentation (manuals and procedures); and conducted dry runs and validation testing. The overall team coordinated closely to facilitate a seamless transition from initial assessment and authoring, to data migration, and finally to resumption of normal ongoing operations. Key features of the new EDMS Subcontractor's software included lookup tables, an import wizard, data checking options and unique indexes. Since the database systems became operational, the technical staff gathered useful feedback from end users (e.g., lab staff, field engineers, task managers, and the third-party data validator) to refine the EDMS/LIMS operation. This feedback triggered improvements in the performance of onsite laboratory qualification forms, promoted consistency in sample ID numbers between the database sample planning screens and field chain-of-custodies, corrected bugs in the LIMS Duplicate Evaluation Report, eliminated data import issues such as blank, inconsistent or missing data from key fields. One of the advantages of the commercial database solution was that it allowed the project to cut cost over time due to the lower cost of database maintenance provided by the commercial database vendor versus the cost of an on-staff DA. Cost savings are estimated at $40,000 per year. There were also indirect cost savings resulting from implementation of the new database since it allowed better integration of the LIMS and EDMS. While there will always be challenges associated with long term records/data management for any old remediation site, the Maywood Team's approach to an upgraded EDMS/LIMS implementation serves as one element of the overall effort to enhance the integrity and reproducibility of critical data that supports the remediation program while at the same time, more effectively using available resources. These lessons-learned will enhance implementation of cost-effective solutions for similar environmental remediation sites. (authors)

97 MATHEMATICS AND COMPUTING↗

Laboratory-Scale Microgrid System for Control of Power Distribution in Local Energy Networks - Part II: Implementation and Case Study

In this chapter, we provide the detailed implementation of the proposed microgrid framework in part I. As a case study, a droop-based load sharing algorithm with the capability of controlling the active and reactive power have been implemented. Several load sharing scenarios have been studied to verify the capability of the suggested prototype in performance evaluation and verification of different control strategies in microgrid systems. The performed experiments confirm the capacity of the proposed structure in microgrid research and development (R&D), as well as education.

design↗