Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Information Security Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Statistical Analysis of the Worker Engagement Survey Administered at the Worker Safety and Security Team Festival

The Worker Safety and Security Team (WSST) at Los Alamos National Laboratory holds an annual festival, WSST-fest, to engage workers and inform them about safety- and securityrelated matters. As part of the 2015 WSST-fest, workers were given the opportunity to participate in a survey assessing their engagement in their organizations and work environments. A total of 789 workers participated in the 23-question survey where they were also invited, optionally, to identify themselves, their organization, and to give open-ended feedback. The survey consisted of 23 positive statements (i.e. “My organization is a good place to work.”) with which the respondent could express a level of agreement. The text of these statements are provided in Table 1. The level of agreement corresponds to a 5-level Likert scale ranging from “Strongly Disagree” to “Strongly Agree.” In addition to assessing the overall positivity or negativity of the scores, the results were partitioned into several cohorts based on the response meta-data (self-identification, comments, etc.) to explore trends. Survey respondents were presented with the options to identify themselves, their organizations and to provide comments. These options suggested the following questions about the data set.

99 GENERAL AND MISCELLANEOUS↗

Consider the Consequences: A Powerful Approach for Reducing ICS Cyber Risk

Here, by identifying and analyzing threats, vulnerabilities, and impacts, asset owners can develop a risk profile for their industrial control systems (ICSs). This information is essential in developing, prioritizing, and implementing mitigations to reduce ICS cyber risk. To help bridge the gap between the cyber and physical domains, and gain a better understanding of cascading cyber/physical impacts, this paper will discuss the safety perspective of physical impacts, describe the ICS cyber kill chain model, explain the cyber/physical interface, review the “layers of protection analysis model” from a security perspective, discuss protection layers, and suggest a reference architecture for securing digital control devices.

99 GENERAL AND MISCELLANEOUS↗

A Systematic Comprehensive Computational Model for Stake Estimation in Mission Assurance: Applying Cyber Security Econometrics System (CSES) to Mission Assurance Analysis Protocol (MAAP)

In earlier works, we presented a computational infrastructure that allows an analyst to estimate the security of a system in terms of the loss that each stakeholder stands to sustain as a result of security breakdowns. In this paper, we discuss how this infrastructure can be used in the subject domain of mission assurance as defined as the full life-cycle engineering process to identify and mitigate design, production, test, and field support deficiencies of mission success. We address the opportunity to apply the Cyberspace Security Econometrics System (CSES) to Carnegie Mellon University and Software Engineering Institute s Mission Assurance Analysis Protocol (MAAP) in this context.

97 MATHEMATICS AND COMPUTING↗

Analysis of CSIRT/SOC Incidents and Continuous Monitoring of Threats

Security Operations Centers (SOC) contain a wealth of data which, if properly classified and tagged upfront, can yield a wealth of real-time information about your organizations IT Security posture, risks, and threats. These include answers to relevant and actionable questions such as: What are our biggest threats? Who is attacking us and what do they want? What controls are working or not working? How effective was the new technology we just implemented? What is our ROI?

Wang, John↗

Connecting Space to Village: Tethys Adoption Within SERVIR

The SERVIR program, a joint development initiative of National Aeronautics and Space Administration (NASA) and United States Agency for International Development (USAID), works in partnership with leading regional organizations world-wide to help developing countries use information provided by Earth observing satellites and geospatial technologies for managing climate risks and land use. SERVIR empowers decision-makers with tools, products, and services to act locally on critical issues related to four key areas: Food Security and Agriculture, Water and Water-related Disasters, Land Use/Land Cover and Ecosystems, Weather and Climate. SERVIR is improving awareness, increasing access to information, and supporting analysis to help people in West Africa, Eastern and Southern Africa, Hindu Kush-Himalaya (HKH), the Lower Mekong, South America and Mesoamerica. NASA funds an Applied Sciences Team (AST), composed of experts from universities and research institutions around the United States. Through AST, SERVIR adopted the Tethys platform introduced by Brigham Young University (BYU) for the implementation of tools to deliver scientific data to stakeholders in the Hindu Kush-Himalaya region. Several Tethys applications developed within SERVIR have raised interest amongst decision makers in the countries served by our regional hubs. They see these new apps as key vehicles to disseminate complex information related to weather models, hydrological models, and air quality monitoring, and as such the scope of our Tethys efforts continue to expand to other regions. As of July 2019, each one of the SERVIR hubs (with the exception of Amazonia, which has only recently started), have stood up Tethys portals and have at least one individual trained in the implementation and maintenance of a Tethys portal and in the creation of basic applications. HKH, with BYU's valuable support, has implemented very sophisticated applications that showcase the possibilities and the benefits that the Tethys platform brings.

Tethys↗

Quantifying Security Threats and Their Impact

In earlier works, we present a computational infrastructure that allows an analyst to estimate the security of a system in terms of the loss that each stakeholder stands to sustain as a result of security breakdowns. In this paper we illustrate this infrastructure by means of a sample example involving an e-commerce application.

97 MATHEMATICS AND COMPUTING↗

Risk assessment of wellbore leakage during underground hydrogen storage

The expansion of renewable energy sources would require large-scale energy storage options to overcome the intermittent nature of these sources. Underground hydrogen storage (UHS) in depleted hydrocarbon reservoirs offers a scalable and practical energy storage solution. These reservoirs are chosen for their availability and large capacity, but the unique properties of hydrogen raise concerns about potential leakage pathways, particularly through wellbores. In this study, we develop and apply, for the first time, reduced-order models (ROMs) specifically designed for efficient leakage risk prediction in UHS systems operating in depleted hydrocarbon reservoirs. Using 3,000 high-fidelity simulation scenarios, we examine the influence of 11 key parameters, including reservoir and aquifer depths, wellbore permeability and porosity, initial saturations of water, oil and gas fractions (hydrogen, light, intermediate, and heavy hydrocarbons), reservoir pressure multiplier, and the aquifer-to-reservoir volume ratio, to simulate leakage behavior over a 1,000-year timescale. We train ROMs using a two-step classification-regression approach, achieving R 2 values exceeding 99 % across all targets. These ROMs effectively capture the leakage evolution and identify critical controls of leakage, guiding the design of mitigation strategies. Results indicate that gas leakage occurs in about 27 % of scenarios as early as five years post-operation, reaching volumes of up to 106 ft3. Oil leakage is less frequent (~17 %) and typically begins decades later. Our findings also show that hydrogen often migrates first, owing to its smaller molecular size and higher buoyancy, followed by heavier hydrocarbons. Over time, these heavier components contribute significantly to the total leaked volume, reinforcing the need for targeted monitoring and remediation strategies. Our analysis highlights that deeper storage reservoirs, shallower aquifers, and low-permeability wellbores significantly reduce leakage risks. In conclusion, this work offers a robust framework for risk-informed UHS deployment, supporting energy security through reliable large-scale hydrogen storage while safeguarding environmental integrity.

08 HYDROGEN↗

The evolution of the Human Systems and Simulation Laboratory in nuclear power research

The events at Three Mile Island in the United States brought about fundamental changes in the ways that simulation would be used in nuclear operations. The need for research simulators was identified to scientifically study human-centered risk and make recommendations for process control system designs. This paper documents the human factors research conducted at the Human Systems and Simulation Laboratory (HSSL) since its inception in 2010 at Idaho National Laboratory. The facility’s primary purposes are to provide support to utilities for system upgrades and to validate modernized control room concepts. In the last decade, however, as nuclear industry needs have evolved, so too have the purposes of the HSSL. Thus, beyond control room modernization, human factors researchers have evaluated the security of nuclear infrastructure from cyber adversaries and evaluated human-in-the-loop simulations for joint operations with an integrated hydrogen generation plant. Lastly, our review presents research using human reliability analysis techniques with data collected from HSSL-based studies and concludes with potential future directions for the HSSL, including severe accident management and advanced control room technologies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Decision Engines for Software Analysis Using Satisfiability Modulo Theories Solvers

The area of software analysis, testing and verification is now undergoing a revolution thanks to the use of automated and scalable support for logical methods. A well-recognized premise is that at the core of software analysis engines is invariably a component using logical formulas for describing states and transformations between system states. The process of using this information for discovering and checking program properties (including such important properties as safety and security) amounts to automatic theorem proving. In particular, theorem provers that directly support common software constructs offer a compelling basis. Such provers are commonly called satisfiability modulo theories (SMT) solvers. Z3 is a state-of-the-art SMT solver. It is developed at Microsoft Research. It can be used to check the satisfiability of logical formulas over one or more theories such as arithmetic, bit-vectors, lists, records and arrays. The talk describes some of the technology behind modern SMT solvers, including the solver Z3. Z3 is currently mainly targeted at solving problems that arise in software analysis and verification. It has been applied to various contexts, such as systems for dynamic symbolic simulation (Pex, SAGE, Vigilante), for program verification and extended static checking (Spec#/Boggie, VCC, HAVOC), for software model checking (Yogi, SLAM), model-based design (FORMULA), security protocol code (F7), program run-time analysis and invariant generation (VS3). We will describe how it integrates support for a variety of theories that arise naturally in the context of the applications. There are several new promising avenues and the talk will touch on some of these and the challenges related to SMT solvers. Proceedings

Bjorner, Nikolaj↗

SoK: A Framework for and Analysis of Software Bill of Materials Tools

Modern software development has gradually become more complex, leveraging available open-source software and third party components. This practice has raised questions about the provenance, licensing, versioning and compliance of reused code and its dependencies. Furthermore, it is par ticularly important to review such code fragments and third party components for known-vulnerabilities before they are included in a software product. A Software Bill of Materials (SBoM) is a mechanism to achieve such an analysis, provid ing transparency and visibility into a software product to both the software developer and its respective consumer. An SBoM lists information and details about all the elements constituting a piece of software and can, therefore, be used to evaluate associated security risk. While the concept of SBoMs is growing in popularity, it is still fairly new to many organizations, causing them to potentially struggle with pro ducing and processing SBoMs and limiting their widespread adoption. In this work, we delve into the area of SBoMs and present the state-of-the-art SBoM tools, creating a framework for analysis and categorizing them based on a diverse set of features and functionalities. We are the first to provide a detailed analysis of 83 open-source SBoM tools along with a perspective on how a potential SBoM user can select a tool based on their specific requirements. Our work aims to help promote understanding of this domain, thereby encouraging and furthering its overall adoption. We additionally seek to pave a path for future work in this area by providing recommendations to tool developers and users, researchers, and standardizing organizations.

99 GENERAL AND MISCELLANEOUS↗

Cyber Attack Sequences Generation for Electric Power Grid

Security assessment of cyber-physical energy systems (CPESs) such as the electric power grid is a critical operation to maintain availability, reliability, and quality of service in the presence of persistent threats from malicious cyber actors. Existing security assessment approaches such as penetration testing and red teaming rely on subject matter expert experience and forensic cyber analysis of historical events to perform realistic, threat-informed assessments of CPES defense. CPESs have a large attack surface because of the heterogeneity and complexity of underlying topology, devices, measurements, and vulnerabilities. The aforementioned approaches lead to partial coverage of the attack surface with a large set of unknown but possible exploits. There is a need to automate the CPES attack surface discovery and contextualize it for relevant, highly probable, real-world attack scenarios. We propose a methodology and framework to facilitate the discovery of the CPES attack surface. We present a multilayer attack graph with ranked attack sequences to describe CPES failure scenarios. We present a work-in-progress framework that lists key components to automate the attack modeling and sequence generation. We demonstrate the published National Electric Sector Cybersecurity Organization Resource CPES failure scenario to highlight the trustworthiness of generated attack sequences.

Dutta, Ashutosh↗

Development and Demonstration of a Security Core Component

In recent years, the convergence of a number of trends has resulted in Cyber Security becoming a much greater concern for electric utilities. A short list of these trends includes: · Industrial Control Systems (ICSs) have evolved from depending on proprietary hardware and operating software toward using standard off-the-shelf hardware and operating software. This has meant that these ICSs can no longer depend on “security through obscurity. · Similarly, these same systems have evolved toward using standard communications protocols, further reducing their ability to rely upon obscurity. · The rise of the Internet and the accompanying demand for more data about virtually everything has resulted in formerly isolated ICSs becoming at least partially accessible via Internet-connected networks. · “Cyber crime” has become commonplace, whether it be for industrial espionage, reconnaissance for a possible cyber attack, theft, or because some individual or group “has something to prove.” Electric utility system operators are experts at running the power grid. The reality is, especially at small and mid-sized utilities, these SCADA operators will by default be “on the front line” if and when a cyber attack occurs against their systems. These people are not computer software, networking, or cyber security experts, so they are ill-equipped to deal with a cyber security incident. Cyber Security Manager (CSM) was conceived, designed, and built so that it can be configured to know what a utility’s SCADA/EMS/DMS system looks like under normal conditions. To do this, CSM monitors log messages from any device that uses the syslog standard. It can also monitor a variety of statistics from the computers that make up the SCADA/EMS/DMS: outputs from host-based security tools, intrusion detection systems, SCADA alarms, and real-time SCADA values – even results from a SIEM (Security Information and Event Management) system. When the system deviates from “normal,” CSM can alert the operator in language that they understand that an incident may be occurring, provide actionable intelligence, and informing them what actions to take. These alarms may be viewed on CSM’s built-in user interface, sent to a SCADA alarm list, or communicated via email, phone, pager, or SMS message. In recognition of the fact that “real world” training for cyber security events is impractical, CSM has a built-in Operator Training Simulator capability. This can be used stand alone to create simulated event scenarios for training purposes. It may also be used in conjunction with the recipient’s SCADA/EMS/DMS Operator Training Simulator. In addition to providing cyber security situational awareness for electric utility operators, CSM also provides tools for analysts and support personnel; in fact, the majority of user interface displays are designed for use in analyzing current and past security events. CSM keeps security-related information in long-term storage, as well as writing any decisions it makes to a (syslog) log for use forensic or other post-event analysis.

Turke, Andy↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

Deforestation, floodplain dynamics, and carbon biogeochemistry in the Amazon Basin

Three aspects of the physical geographic environment of the Amazon Basin are considered: (1) deforestation and reforestation, (2) floodplain dynamics, and (3) fluvial geomorphology. Three independent projects are coupled in this experiment to improve the in-place research and to ensure that the Shuttle Imaging Radar-B (SIR-B) experiment stands on a secure base of ongoing work. Major benefits to be obtained center on: (1) areal and locational information, (2) data from various depression angles, and (3) digital radar signatures. Analysis will be conducted for selected sites to define how well SIR-B data can be used for: (1) definition of extent and location of deforestation in a tropical moist forest, (2) definition and quantification of the nature of the vegetation and edaphic conditions on the (floodplain) of the Amazon River, and (3) quantification of the accuracy with which the geometry and channel shifting of the Amazon River may be mapped using SIR-B imagery in conjunction with other remote sensing data.

Bryan, M. L.↗

Pathways to IEC Standards for Heliostat Design Qualification and Site Acceptance in Central Receiver CSP Applications

This paper surveys the existing landscape of standards relevant to heliostats, identifies their gaps, and proposes a path forward to a comprehensive set of heliostat guidelines, technical specifications, and standards under the framework of International Electrotechnical Commission (IEC) TC 117. Gaps in existing guidelines and standards are surveyed using a three-tiered taxonomy: component-level, heliostat-level, and field-level. At each level, the gap analysis is followed by a proposal for a coordinated path forward on the development of standards. At the component level, advances in the understanding of wind loading should inform a technical specification for drives and structures. Reflectors require consolidation of measurement guidelines into existing standards documents. Communications & controls require technical standards to inform their selection and secure implementation. At the heliostat level, IEC 62817 (solar trackers) adequately characterizes drive systems, structures, and electronics, but requires adaptation to heliostats' use patterns, operating modes, and expected life cycles. IEC 62817 does not address heliostat beam quality and pointing accuracy, but the process for determining both is elaborated in the SolarPACES Guideline for Heliostat Performance Testing. This SolarPACES document requires two main modifications: adaptation to IEC language and inclusion of testing after heliostats which have undergone accelerated weathering and mechanical cycling (to understand performance degradation). At the field level, IEC 62862-4-2 addresses the function and control of heliostat fields but does not cover the statistically rigorous testing of heliostat groups, or field performance factors like security and soiling. The addition of documents under IEC-62862-4 is proposed to address this gap.

beam↗

Regional Resiliency Assessment Program Dependency Analysis Framework

The purpose of this report is to develop a common understanding and consistent analytic approach for evaluating critical infrastructure dependencies and interdependencies that will inform the programs of the U.S. Department of Homeland Security (DHS) Protective Security Coordination Division (PSCD). The framework outlined here prioritizes a need to tie together top-down and bottom-up analyses to produce a comprehensive “system of systems” view of dependencies and interdependencies that integrates the best available data. Examples of dependency and interdependency analyses from recent Regional Resiliency Assessment Program (RRAP) projects are included to illustrate practical applications of these concepts in support of infrastructure resilience.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

A Counter-IED Preparedness Methodology for Large Event Planning

Since 2009, Oak Ridge National Laboratory (ORNL) has been involved in a project sponsored by the Department of Homeland Security Science and Technology Directorate aimed at improving preparedness against Improvised Explosive Devices (IED) at large sporting events. Led by the University of Southern Mississippi (USM) as part of the Southeast Region Research Initiative, the project partners have been developing tools and methodologies for use by security personnel and first responders at sports stadiums. ORNL s contribution has been to develop an automated process to gather and organize disparate data that is usually part of an organization s security plan. The organized data informs a table-top exercise (TTX) conducted by USM using additional tools developed by them and their subcontractors. After participating in several pilot TTXs, patterns are beginning to emerge that would enable improvements to be formulated to increase the level of counter-IED preparedness. This paper focuses on the data collection and analysis process and shares insights gained to date.

99 GENERAL AND MISCELLANEOUS↗

Security Vulnerability Profiles of NASA Mission Software: Empirical Analysis of Security Related Bug Reports

NASA develops, runs, and maintains software systems for which security is of vital importance. Therefore, it is becoming an imperative to develop secure systems and extend the current software assurance capabilities to cover information assurance and cybersecurity concerns of NASA missions. The results presented in this report are based on the information provided in the issue tracking systems of one ground mission and one flight mission. The extracted data were used to create three datasets: Ground mission IVV issues, Flight mission IVV issues, and Flight mission Developers issues. In each dataset, we identified the software bugs that are security related and classified them in specific security classes. This information was then used to create the security vulnerability profiles (i.e., to determine how, why, where, and when the security vulnerabilities were introduced) and explore the existence of common trends. The main findings of our work include:- Code related security issues dominated both the Ground and Flight mission IVV security issues, with 95 and 92, respectively. Therefore, enforcing secure coding practices and verification and validation focused on coding errors would be cost effective ways to improve mission's security. (Flight mission Developers issues dataset did not contain data in the Issue Category.)- In both the Ground and Flight mission IVV issues datasets, the majority of security issues (i.e., 91 and 85, respectively) were introduced in the Implementation phase. In most cases, the phase in which the issues were found was the same as the phase in which they were introduced. The most security related issues of the Flight mission Developers issues dataset were found during Code Implementation, Build Integration, and Build Verification; the data on the phase in which these issues were introduced were not available for this dataset.- The location of security related issues, as the location of software issues in general, followed the Pareto principle. Specifically, for all three datasets, from 86 to 88 the security related issues were located in two to four subsystems.- The severity levels of most security issues were moderate, in all three datasets.- Out of 21 primary security classes, five dominated: Exception Management, Memory Access, Other, Risky Values, and Unused Entities. Together, these classes contributed from around 80 to 90 of all security issues in each dataset. This again proves the Pareto principle of uneven distribution of security issues, in this case across CWE classes, and supports the fact that addressing these dominant security classes provides the most cost efficient way to improve missions' security. The findings presented in this report uncovered the security vulnerability profiles and identified the common trends and dominant classes of security issues, which in turn can be used to select the most efficient secure design and coding best practices compiled by the part of the SARP project team associated with the NASA's Johnson Space Center. In addition, these findings provide valuable input to the NASA IVV initiative aimed at identification of the two 25 CWEs of ground and flight missions.

vulnerability↗