Opportunities for space station assembly operations during crew absence

Prior to Permanently Manned Capability (to be achieved approximately 21 months after the First Element Launch), the Space Station will be manned for less than 10 percent of its total staytime on orbit. The most intensive and critical Station assembly operations will occur during these early flights. Some robotic resources may be available to perform assembly operations while the Station crew is absent; however, the use of robotic devices for assembly operations during unmanned phases has not yet been adopted by the Space Station program. This paper studies the relevant aspects of teleoperated and autonomous assembly activities, and presents candidate assembly operations that could be performed during crew absence. From this analysis, the potential benefits of remote control of robotic resources can be weighed against any associated increase in cost and complexity that would accompany implementation of this capability.

Parrish, Joseph C.↗

Synthetic Data Generation for 3D Mesh Prediction and Spatial Reasoning During Multi-Agent Robotic Missions

In-space assembly operations require accurate reasoning over the pose, location, and structural organization of both the autonomous agents and assembly materials. In a full six-degree-of-freedom space, an accurate understanding of the full three-dimensional structure of the object of interest greatly enriches information for pose estimation and collision planning. Current methods of predicting pose estimation require a priori understanding of the shape of the object. Additionally, visual information in the space environment is impacted by variations in contrast and illumination. Using synthetic data allows us to rapidly generate large datasets with in varying environments and lighting conditions.This work details the generation of synthetic data used to explore the use of a region-based convolutional neural networks to detect objects of interest and predict a voxel-based three-dimensional mesh in order to understand their full three-dimensional shape. This mesh provides useful spatial information during in-space assembly operations without requiring either the complexity of maintaining models over the progress of building an object or observations from multiple angles. The generated meshes are then compared to that of ground truth in order to measure its performance.

synthetic data↗

Synthetic Data Generation for 3D Mesh Prediction and Spatial Reasoning During Multi-Agent Robotic Missions

In-space assembly operations require accurate reasoning over the pose, location, and structural organization of both the autonomous agents and assembly materials. In a full six-degree-of-freedom space, an accurate understanding of the full three-dimensional structure of the object of interest greatly enriches information for pose estimation and collision planning. Current methods of predicting pose estimation require a priori understanding of the shape of the object. Additionally, visual information in the space environment is impacted by variations in contrast and illumination. Using synthetic data allows us to rapidly generate large datasets with in varying environments and lighting conditions. This work details the generation of synthetic data used to explore the use of a region-based convolutional neural networks to detect objects of interest and predict a voxel-based three-dimensional mesh in order to understand their full three-dimensional shape. This mesh provides useful spatial information during in-space assembly operations without requiring either the complexity of maintaining models over the progress of building an object or observations from multiple angles. The generated meshes are then compared to that of ground truth in order to measure its performance.

James Ecker↗

A smart end-effector for assembly of space truss structures

A unique facility, the Automated Structures Research Laboratory, is being used to investigate robotic assembly of truss structures. A special-purpose end-effector is used to assemble structural elements into an eight meter diameter structure. To expand the capabilities of the facility to include construction of structures with curved surfaces from straight structural elements of different lengths, a new end-effector has been designed and fabricated. This end-effector contains an integrated microprocessor to monitor actuator operations through sensor feedback. This paper provides an overview of the automated assembly tasks required by this end-effector and a description of the new end-effector's hardware and control software.

Doggett, William R.↗

Reliability Investigation of Ball Grid Array Assemblies for Space Flight Applications

JPL, in a partnership with an industrial consortium, is currently engaged in the investigation of reliability and quality issues if ball grid array (BGA) packages as they may be applied to space flight electronics. Performing tests to determine the solder joint reliability of assemblies using BGAs under temperature cycling has proved to be a real challenge for test engineers.

Ball grid array printed wiring assemblies reliabil↗

Uncertainty in Servicing and Assembly Tasks for Space Robotic Manipulators

This presentation will discuss a subset of the sources of uncertainty that impact autonomous in-space servicing, assembly, and manufacturing missions. These include robotic manipulator modeling uncertainties in both kinematics and dynamics, perception error associated machine learning models for pose estimation, and sensor noise. Mitigation strategies will be discussed including the incorporation of capture envelopes in the design of robotic tools and selection of robot goal poses to minimize end-effector sensitivity in manipulators with redundant degrees of freedom.

robotics↗

Design, construction and utilization of a space station assembled from 5-meter erectable struts

Presented are the primary characteristics of the 5-meter erectable truss designated for the space station. The relatively large 5-meter truss dimension was chosen to provide a deep beam for high bending stiffness yet provide convenient mounting locations for space shuttle cargo bay size payloads which are 14.5 ft. (4.4 m) in diameter. Truss nodes and quick-attachment erectable joints are described which provide for evolutionary three-dimensional growth and for simple maintenance and repair. A mobile remote manipulator system is described which is provided to assist in station construction and maintenance. A discussion is also presented of the construction of the space station and the associated EVA time.

Mikulas, M. M., Jr.↗

Photovoltaic module on-orbit assembly for Space Station Freedom

One of the elements of the Space Station Freedom power system is the Photovoltaic (PV) module. These modules will be assembled on-orbit during the assembly phase of the program. These modules will be assembled either from the shuttle orbiter or from the Mobile Servicing Center (MSC). The different types of assembly operations that will be used to assemble PV Modules are described.

Sours, Thomas↗

Photovoltaic module on-orbit assembly for Space Station Freedom

One of the elements of the Space Station Freedom power system is the photovoltaic (PV) module. These modules will be assembled on-orbit during the assembly phase of the program. These modules will be assembled either from the Shuttle Orbiter or from the Mobile Servicing Center (MSC). The different types of assembly operations that will be used to assemble PV modules are described.

Sours, T.↗

Development of a truss joint for robotic assembly of space structures

This report presents the results of a detailed study of mechanical fasteners which were designed to facilitate robotic assembly of structures. Design requirements for robotic structural assembly were developed, taking into account structural properties and overall system design, and four candidate fasteners were designed to meet them. These fasteners were built and evaluated in the laboratory, and the Hammer-Head joint was chosen as superior overall. It had a high reliability of fastening under misalignments of 2.54 mm (0.1 in) and 3 deg, the highest end fixity (2.18), the simplest end effector, an integral capture guide, good visual verification, and the lightest weight (782 g, 1.72 lb). The study found that a good design should incorporate chamfers sliding on chamfers, cylinders sliding on chamfers, and hard surface finishes on sliding surfaces. The study also comments on robot flexibility, sag, hysteresis, thermal expansion, and friction which were observed during the testing.

Parma, George F.↗

Design, construction, and utilization of a space station assembled from 5-meter erectable struts

The primary characteristics of the 5-meter erectable truss is presented, which was baselined for the Space Station. The relatively large 5-meter truss dimension was chosen to provide a deep beam for high bending stiffness yet provide convenient mounting locations for space shuttle cargo bay size payloads which are approx. 14.5 ft (4.4 m) in diameter. Truss nodes and quick attachment erectable joints are described which provide for evolutionary three dimensional growth and for simple maintenance and repair. A mobile remote manipulator system is described which is provided to assist in station construction and maintenance. A discussion is also presented of the construction of the Space Station and the associated extravehicular active (EVA) time.

Mikulas, Martin M., Jr.↗

MMIC-I: A Robotic Platform for Assembly Integration and Internal Locomotion through Mechanical Meta-Material Structures

In-space assembly is crucial to creating large-scale space structures and enabling long term space missions. Natural limitations in the size of transportation vehicles and ISRU production facilities necessitate an additive strategy with the size of the typical structural unit being essentially fixed and inversely proportional to the final assembly size. In prior robotic and space assembly examples, reversible mechanical integration of structural modules is typically achieved with actuated alignment and fastening mechanisms onboard every structural module. Additive assembly or manufacturing planning approaches often feature a “build front” that receives new materials or parts and progresses gradually across the target geometry. The system we describe here places much of the alignment and fastener actuation systems onboard a mobile robot that can operate at a build front while companion robots (Scaling Omni-directional Lattice Locomoting Explorer, SOLLE) provide part or material transportation. The design and evaluation of this Mobile Meta-Material Interior Co-Integrator (MMIC-I), an inchworm-style locomoting robotic assembler, is described here with an emphasis on ease of assembly and a low number of unique parts for a simple design. It is designed to assist in alignment of cuboctahedron structural unit cells with captive fasteners, defining the build front in operation. Adjacent structural unit cells are locked together with specified axial and rotational actuation of the fasteners. Hardware prototypes show that the robot is able to successfully locomote to any indexed location within a lattice structure and bolt together each set of fasteners on any interface.

Robotics↗

Space module assembly apparatus with docking alignment flexibility and restraint

A berthing mechanism especially for use in berthing and compliant air-tight securing between manned space vehicle and modules is disclosed. The interface is provided by a pair of annular rings, one of which is typically, mechanically attached to the vehicle and the other to the module to which it is to be docked and secured. One of the two rings is attached to a base by resilient bellows. The facing surface of one annular ring is joined to a base by a cable laced through alternating pulleys attached circumferentially so that the interface surface of that ring may be tilted to accommodate angular misalignment as the annular rings are brought into docking (berthing) contact. Interleaving guide flanges with chambered sides provide at least some rotational mialignmnet correction. A plurality of electromechanical actuator/attenuator units provide means for extending one annular ring toward the other in the final stages of docking, for absorbing the initial docking shock and for drawing the annular rings into tight interface contact. Locking hooks provide for securing the interfaces.

Willie D Whitaker↗

Retraction Assembly for Space Shuttle Extended Nose Landing Gear

As part of a project to encourage the use of shape memory alloy actuators for space actuators, this mechanism uses a nitinol ribbon to provide the necessary motion to help retract the proposed extended nose landing gear (ENLG) for the space shuttle. Initial proof-of-concept design of the ENLG did not include the ability to retract the gear automatically. One proposed actuator for this purpose was designed at Johnson Space Center and uses resistive heating to rotate the ribbon around a cylinder. This rotation then allows the assembly to pull down a wedge that is used to hold the landing gear strut in place, thus returning the landing gear to its previous height before extension. The presentation will follow the design of this assembly from working with the nitinol ribbon to providing mechanical connections and allowing minimal friction for motion of three wraps around a cylinder. Also to be presented is preliminary work on design of a shape memory alloy gripper, a design project to demonstrate uses of NiTi.

Files, Bradley S.↗

Swing-arm beam erector (SABER) concept for single astronaut assembly of space structure

Results are presented of tests conducted to evaluate a mobile work station/assembly fixture concept that would mechanically assist an astronaut in the on-orbit manual assembly of erectable truss-beams. The concept eliminates astronaut manual translation by use of a motorized work platform with foot restraints. The tests involved assembly of a tetrahedral truss-beam by a test subject in simulated zero gravity (neutral bouyancy in water). A three-bay truss-beam was assembled from 30 aluminum struts with quick-attachment structural joints. The results show that average on-orbit assembly rates of 2.1 struts per minute can be expected for struts of the size employed in these tests.

Watson, J. J.↗

A technology base for near-term space platforms

The paper briefly describes the ongoing Large Space Systems Technology (LSST) Program in platform technology. The program addresses technology issues associated with the near-term science and applications platform, and the more fundamental questions associated with the general class of large space-assembled structural systems. Elements of the technology program are described and preliminary results are discussed. Results to date indicate that potential new capabilities of the Space Shuttle will strongly influence spacecraft design, and that future spacecraft utilizing these new capabilities can provide important new performance capabilities and greater efficiency. The proposed science and applications platform appears to be the earliest envisioned space vehicle which will be of the space-assembled class.

Huckins, E. K., III↗