Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ground Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

The corrections for significant wave height and attitude effects in the TOPEX radar altimeter

The routine ground processing of data from the NASA radar altimeter of TOPEX/POSEIDON includes instrument corrections for the effects of significant wave height and attitude angle changes on the altimeter's estimates of range, backscattered power, and significant wave height. This paper describes how these instrument corrections were generated and how they are applied. Detailed waveform fitting to telemetered waveform samples is use to assess the effectiveness of the corrections. There are several altimeter hardware-caused small waveform departures from the model waveforms and these departures, designated waveform 'features', are described in detailed. A consequence of the waveform features, and their positioning relationship to range rate, is that range data for ground tracks moving toward the equator may differ systematically by about a centimeter compared to range data for ground tracks moving away from the equator. The results and discussion are limited to side A of the redundant altimeter, as only side A has been operated on orbit.

Hayne, G. S.↗

Large Payload Transportation and Test Considerations

Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure - roads, bridges, airframes, and buildings - necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider how large spacecraft are designed, and where they are manufactured, tested, or launched, could result in unforeseen cost to modify/develop infrastructure, or incur additional risk due to increased handling or elimination of key verifications. During test and verification planning for the Altair project, a number of transportation and test issues related to the large payload diameter were identified. Although the entire Constellation Program - including Altair - was canceled in the 2011 NASA budget, issues identified by the Altair project serve as important lessons learned for future payloads that may be developed to support national "heavy lift" strategies. A feasibility study performed by the Constellation Ground Operations (CxGO) project found that neither the Altair Ascent nor Descent Stage would fit inside available transportation aircraft. Ground transportation of a payload this large over extended distances is generally not permitted by most states, so overland transportation alone would not have been an option. Limited ground transportation to the nearest waterway may be permitted, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing (which includes hypergolic fuels, pyrotechnic devices, and high pressure gasses).

Rucker, Michelle A.↗

Applications of triggered lightning to space vehicle operations

Kennedy Space Center (KSC) and the USAF Eastern Space Missile Center (ESMC) covering an area of 25 x 40 km are frequently called America's Spaceport. This title is earned through the integration, by labor and management, of many skills in a wide variety of engineering fields to solve many technical problems that occur during the launch processing of space vehicles. Weather is one of these problems, and although less frequent in time and duration when compared to engineering type problems, has caused costly and life threatening situations. This sensitivity to weather, especially lightning, was recognized in the very early pioneer days of space operations. The need to protect the many v\facilities, space flight hardware, and personnel from electrified clouds capable of producing lightning was a critical element in improving launch operations. A KSC lightning committee was formed and directed to improve lightning protection, detection, and measuring systems and required that all theoretical studies be confirmed by KSC field data. Over the years, there have been several lightning incidents involving flight vehicles during ground processing as well as launch. Subsequent investigations revealed the need to improve these systems as well as the knowledge of the electrical atmosphere and its effects on operations in regard to cost and safety. Presented here is how, KSC Atmospheric Science Field Laboratory (AFSL), in particular Rocket Triggered Lightning, is being used to solve these problems.

Jafferis, William↗

Development of Computational Environmental Microbiome Workflows for the Laboratory and the International Space Station

Identification of microorganisms in the spaceflight environment is critical for crew health risk assessment on the International Space Station (ISS). Since 2017, nanopore sequencing technology has been used to support thein situ identification of microbial species during spaceflight. Beginning in 2018, a culture-independent, swab-to-sequencer method was implemented onboard the ISS to provide a more thorough insight of the ISS microbiome. Eliminating microbial culture enables identification of difficult-to-culture organisms, reduces risks associated with potentially pathogenic cultures, and could significantly reduce the time from sample-to-answer. However, this molecular-based approach generates large metagenomic datasets that require substantial computational resources for analysis. To process nanopore-generated sequencing data, the JSC Microbiology Laboratory established a bioinformatics workflow on Amazon EC2 under the security guidance of the NASA Science Managed Cloud Environment (SMCE).This resource allows for the development, testing, and accessing of computational tools for processing large and complex datasets. The work described here will address the downlinking of data from the ISS, the automated pipeline developed to identify targeted bacterial and fungal organisms, and the time from sampling onboard to microbial identification. The pipelines have been enhanced to address high and low biomass samples using optimization based on sample source (air, water, or surface) and type of collection (filter, colony, or swab).The resulting microbiome data can be assessed beyond microbial identifications to gain understanding toward population changes over time, potential selective environmental pressures, and evaluating correlations with a wide range of additional data sets. Metagenome analysis pipelines in development could allow for simultaneous identification of microbial species, gene function, and gene pathways present in the environment. Beyond the ground processing, the developed analysis pipeline is currently deployed onboard the ISS to allow for near real-time assessments of the ISS microbiome. This study serves as a critical foundation for exploration missions, where rapid microbiome analyses will be required.

G. Marie Sharp↗

Center Planning and Development Student Engineer

This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.

engineering↗

Microgravity Passive Phase Separator

A new invention disclosure discusses a structure and process for separating gas from liquids in microgravity. The Microgravity Passive Phase Separator consists of two concentric, pleated, woven stainless- steel screens (25-micrometer nominal pore) with an axial inlet, and an annular outlet between both screens (see figure). Water enters at one end of the center screen at high velocity, eventually passing through the inner screen and out through the annular exit. As gas is introduced into the flow stream, the drag force exerted on the bubble pushes it downstream until flow stagnation or until it reaches an equilibrium point between the surface tension holding bubble to the screen and the drag force. Gas bubbles of a given size will form a front that is moved further down the length of the inner screen with increasing velocity. As more bubbles are added, the front location will remain fixed, but additional bubbles will move to the end of the unit, eventually coming to rest in the large cavity between the unit housing and the outer screen (storage area). Owing to the small size of the pores and the hydrophilic nature of the screen material, gas does not pass through the screen and is retained within the unit for emptying during ground processing. If debris is picked up on the screen, the area closest to the inlet will become clogged, so high-velocity flow will persist farther down the length of the center screen, pushing the bubble front further from the inlet of the inner screen. It is desired to keep the velocity high enough so that, for any bubble size, an area of clean screen exists between the bubbles and the debris. The primary benefits of this innovation are the lack of any need for additional power, strip gas, or location for venting the separated gas. As the unit contains no membrane, the transport fluid will not be lost due to evaporation in the process of gas separation. Separation is performed with relatively low pressure drop based on the large surface area of the separating screen. Additionally, there are no moving parts, and there are no failure modes that involve fluid loss. A patent application has been filed.

Paragano, Matthew↗

Center Planning and Development Student Engineer at KSC

This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.

Engineer↗

A Comparison of Wind Speed Data from Mechanical and Ultrasonic Anemometers

This study compared the performance of mechanical and ultrasonic anemometers at the Eastern Range (ER; Kennedy Space Center and Cape Canaveral Air Force Station on Florida's Atlantic coast) and the Western Range (WR; Vandenberg Air Force Base on California's Pacific coast). Launch Weather Officers, forecasters, and Range Safety analysts need to understand the performance of wind sensors at the ER and WR for weather warnings, watches, advisories, special ground processing operations, launch pad exposure forecasts, user Launch Commit Criteria (LCC) forecasts and evaluations, and toxic dispersion support. The current ER and WR weather tower wind instruments are being changed from the current propeller-and-vane (ER) and cup-and-vane (WR) sensors to ultrasonic sensors through the Range Standardization and Automation (RSA) program. The differences between mechanical and ultrasonic techniques have been found to cause differences in the statistics of peak wind speed in previous studies. The 45th Weather Squadron (45 WS) and the 30th Weather Squadron (30 WS) requested the Applied Meteorology Unit (AMU) to compare data between RSA and current sensors to determine if there are significant differences. Approximately 3 weeks of Legacy and RSA wind data from each range were used in the study, archived during May and June 2005. The ER data spanned the full diurnal cycle, while the WR data was confined to 1000-1600 local time. The sample of 1-minute data from numerous levels on 5 different towers on each range totaled more than 500,000 minutes of data (482,979 minutes of data after quality control). The 10 towers were instrumented at several levels, ranging from 12 ft to 492 ft above ground level. The RSA sensors were collocated at the same vertical levels as the present sensors and typically within 15 ft horizontally of each another. Data from a total of 53 RSA ultrasonic sensors, collocated with present sensors were compared. The 1-minute average wind speed/direction and the 1-second peak wind speed/direction were compared.

Short, D.↗

Short Circuiting the Controller – Missteps in Maintenance and Inspection of Process and Wiring in STS-93

The primary objective of the Space Transportation System mission 93 (STS-93) was to deploy the Chandra X-Ray Observatory. Chandra, the world's most powerful X-Ray telescope, allowed scientists from around the world to study some of the most distant and dynamic objects in the universe. Stripped of nearly 7,000 pounds of its own gear to make room for the payload, the orbiter assigned to this mission was Space Shuttle Columbia. Prior to STS-93, Columbia had flown 25 flights and was NASA's oldest and heaviest orbiter. On July 23, 1999, after two prior launch scrubs, Eileen Collins and her crew of four launched from Kennedy Space Center. About five seconds after launch, Mission Control at Johnson Space Center detected a voltage drop on one of Columbia's electrical buses. As a result of this power fluctuation, a primary and back-up Main Engine controller dropped offline. Given design redundancy, the two remaining controllers supported all three engines. If there had been any other AC bus issues, one engine of the three on the Orbiter would have shut down. The redundant set of digital computer units in each engine controller saved Columbia and her crew from a very risky contingency abort. Post-flight inspection revealed soot on a screw head and a hole in an adjacent Kapton insulated wire. The single strand of polyimide wire was located nearly half-way down the payload bay. The Shuttle Independent Assessment Team (SIAT) reported that the wire had rubbed and chaffed against a burred screw head. The burr was later determined to be the result of overtightening of the screw by a technician during a maintenance refurbishment. Alone, the burr may not have been problematic, but later, during another ground processing event, possibly years after, someone inadvertently stepped on the wiring harness. With the pressure and motion of unintended contact, some of the Kapton insulation rubbed off against the burred screw head. The SIAT suspected the wire damage was pre-existing and was caused 4 or 5 years prior to the flight. Finally, the intense vibrations during the launch sequence allowed contact between the exposed conductor and exposed metal area on the burred screw head, resulting in the arcing and shorting of the wire. Due to the quick turnaround times of Space Shuttle Orbiters, wiring issues caused from multiple maintenance events were often overlooked. Additionally, failing to incorporate thorough and early inclusion of human systems integration (HSI) applications as a crucial part of the decision process can result in these types of misshaps. In order to reduce human error associated with integrated manufacturing, maintenance, refurbishment and flight preparations, wire inspection criteria should be refined and standardized, visual inspection processes should be quantified, and technicians should be certified by specially trained instructors. This case, among many others, unveils why human error management and development of safety metrics is a vital piece in the development of complex systems, and why it should be supported aggressively and implemented program wide.

Human Systems Integration↗

An Analysis of Peak Wind Speed Data from Collocated Mechanical and Ultrasonic Anemometers

This study compared peak wind speeds reported by mechanical and ultrasonic anemometers at Cape Canaveral Air Force Station and Kennedy Space Center (CCAFS/KSC) on the east central coast of Florida and Vandenberg Air Force Base (VAFB) on the central coast of California. Launch Weather Officers, forecasters, and Range Safety analysts need to understand the performance of wind sensors at CCAFS/KSC and VAFB for weather warnings, watches, advisories, special ground processing operations, launch pad exposure forecasts, user Launch Commit Criteria (LCC) forecasts and evaluations, and toxic dispersion support. The legacy CCAFS/KSC and VAFB weather tower wind instruments are being changed from propeller-and-vane (CCAFS/KSC) and cup-and-vane (VAFB) sensors to ultrasonic sensors under the Range Standardization and Automation (RSA) program. Mechanical and ultrasonic wind measuring techniques are known to cause differences in the statistics of peak wind speed as shown in previous studies. The 45th Weather Squadron (45 WS) and the 30th Weather Squadron (30 WS) requested the Applied Meteorology Unit (AMU) to compare data between the RSA ultrasonic and legacy mechanical sensors to determine if there are significant differences. Note that the instruments were sited outdoors under naturally varying conditions and that this comparison was not designed to verify either technology. Approximately 3 weeks of mechanical and ultrasonic wind data from each range from May and June 2005 were used in this study. The CCAFS/KSC data spanned the full diurnal cycle, while the VAFB data were confined to 1000-1600 local time. The sample of 1-minute data from numerous levels on five different towers on each range totaled more than 500,000 minutes of data (482,979 minutes of data after quality control). The ten towers were instrumented at several levels, ranging from 12 ft to 492 ft above ground level. The ultrasonic sensors were collocated at the same vertical levels as the mechanical sensors and typically within 15 ft horizontally of each another. Data from a total of 53 RSA ultrasonic sensors, collocated with mechanical sensors were compared. The 1- minute average wind speed/direction and the 1-second peak wind speed/direction were compared.

Short, David A.↗

Repurposing Drilling Control Diagnostics for Subsurface Edge Detection and Boundary Advisement During Planetary Drilling

Informed decision-making during lunar drilling and sampling missions will require data monitoring tools and specialized ground data systems. Accurate and updated situational awareness, with ongoing data monitoring, is critical for timely responses by to incoming science data. Traverse plans and scheduled activities may need to be flexibly changed in order to react to unexpected data or situations. Unlike (for example) Mars missions, the relative lightspeed closeness of the Moon allows for near-real-time ground processing of incoming mission and instrument data. An Apollo-class lunar regolith drill will in a sense “travel” a meter or two vertically at a given subsurface characterization site. As the drill penetrates into lunar regolith, it is likely to encounter a range of material densities, orientations, fracture toughness, and (perhaps) ice percentages. Lunar drill telemetry can provide science teams with a valuable first look into the subsurface structure, the regolith bulk properties, and constituents at each drilled site. Real-time AI-based recognition and reaction to downhole situations has been developed for automated deeper drilling on Mars and beyond. We can leverage the same knowledge bases and pattern-matching as areal-time interpreter of the subsurface, a situational awareness tool during drilling operations. We recently (Sept. 2019) demonstrated this AI drilling monitoring and analysis capability, in control of in-situ drilling and sampling operations, mounted on a KREX-2 rover in Chile’s Atacama Desert. Terrestrial automated drilling log analyses in oil exploration have used similar machine learning techniques in classifying and identifying features in drilling logs –but these typically are designed assuming a drilling fluid influencing downhole measurements and data (permeability, resistivity). Drilling models and existing AI software designed to detect and respond to drilling faults and hard materials can be repurposed, for near-real-time (ground-based) interpretation of drilling telemetry –a potentially valuable advisory tool for strata boundaries and changes in drilling parameters. On the Moon, this approach could be used to study the structure and to some extent the composition of lunar regolith vs. borehole depth, based on recognizable variations in fracture hardness, drilling energy and penetration rates while actively drilling. Since the early 2000s, a series of increasingly-capable real-time drilling telemetry interpretation and characterization software tools have been developed. These subsurface models and software tools have monitored the real-time drilling data received, and automatically identified changes in drill behavior (e.g., encountering a harder target layer, bit inclusions, drill choking due to infall downhole, and others) correlating these with subsurface structures and features. We discuss the mappings between drill borehole parameters, faults or events detected, and modeled changes in rock layer boundaries, in examples drawn from field testing at analog sites in an Arctic impact crater, Rio Tinto, and Chile’s Atacama Desert. These demonstrate how subsurface structural boundaries led to fault detections and responses by the software.

drilling advisor↗

Investigation of solidification in zero-gravity environment; M553 sphere forming experiment. Phase C: Evaluation of Skylab specimens

Results on specimen evaluation and discussion of solidification behavior in each case are reported in the following order: (1) specimen SL-1.6, (2) specimen SL-2.8, (3) specimen SL-2.4, (4) specimen SL-1.10 and (5) specimen SL-1.11. Comparison is made with ground-processed specimens of similar composition, whenever pertinent and meaningful. Among the nondestructive evaluation methods the measurement of sphericity was conducted by micrometric and shadowgraphic techniques. The intricate shape of specimens in some cases appeared difficult to define. In measuring the density, liquid penetration inside cavities that outcrop on the surface was avoided by sealing off these cavities. Among the destructive evaluation methods the use of the Quantimet 720 required particular attention, because of the small difference in contrast between second phases and micropores. With regard to microporosity microvoids in the core of some specimens were so fine that X-ray microradiography had to be used.

Kattamis, T. Z.↗

The Global Rescue Alarm Net (GRAN) experiment

The OMEGA Position Location Experiment (OPLE) was performed in 1967 by the Goddard Space Flight Center in order to demonstrate a position location and data collection system. OMEGA navigation signals were received at a remote site and retransmitted via a synchronous satellite to a ground processing center where data collecting and position determination were performed. Recent technological advances have made it possible to develop an Advanced OPLE System towards a global search and rescue application. This application generated some new problem areas such as the OMEGA lane ambiguity, random access, location accuracy, real-time processing, and size and weight of the Search and Rescue Communications (SARCOM). This experiment demonstrates the feasibility of instantaneous alarm and position location by using a relatively inexpensive, battery operated, three-pound package.

Morakis, J. C.↗

Tug fleet and ground operations schedules and controls. Volume 3: Program cost estimates

Cost data for the tug DDT&E and operations phases are presented. Option 6 is the recommended option selected from seven options considered and was used as the basis for ground processing estimates. Option 6 provides for processing the tug in a factory clean environment in the low bay area of VAB with subsequent cleaning to visibly clean. The basis and results of the trade study to select Option 6 processing plan is included. Cost estimating methodology, a work breakdown structure, and a dictionary of WBS definitions is also provided.

Source record↗

GOAL - A test engineer oriented language

The development of a test engineer oriented language has been under way at the Kennedy Space Center for several years. The result of this effort is the Ground Operations Aerospace Language, GOAL, a self-documenting, high-order language suitable for coding automatic test, checkout and launch procedures. GOAL is a highly readable, writable, retainable language that is easily learned by nonprogramming oriented engineers. It is sufficiently powerful for use at all levels of Space Shuttle ground processing, from line replaceable unit checkout to integrated launch day operations. This paper will relate the language development, and describe GOAL and its applications.

Mitchell, T. R.↗

Spacelab user implementation assessment study. (Software requirements analysis). Volume 2: Technical report

The engineering analyses and evaluation studies conducted for the Software Requirements Analysis are discussed. Included are the development of the study data base, synthesis of implementation approaches for software required by both mandatory onboard computer services and command/control functions, and identification and implementation of software for ground processing activities.

Source record↗

Tug ground operations - An approach to early identification of operational impacts

An approach to early identification of operational requirements is discussed together with an assessment of the impact of these requirements on the development and acquisition phase of a program. The approach is applied to the Space Tug program. Some of the more salient results of the Tug Fleet and Ground Operations Schedules and Controls study performed under a NASA/Marshall Space Flight Center contract are provided. Ground-processing requirements and flows are presented, including a summary of facility requirements, timelines, activities and options/contingency-provision recommendations. Programmatic recommendations resulting from the study are presented in areas of payload integration, activation requirements, fleet utilization, fleet sizing, costs, and WTR delta requirement for the Tug.

Best, J. L.↗