Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Deep RL for Fast Long-Horizon Operations Scheduling on NASA's Carruthers Geocorona Observatory Mission

Spacecraft operations scheduling is a highly constrained, long-horizon combinatorial optimization problem that traditionally relies on heuristics, constraint programming, or manual planning. We present a scalable deep reinforcement learning framework developed and deployed for NASA’s Carruthers Geocorona Observatory mission. Our framework introduces a macro-action abstraction known as activity blocks coupled with dynamic action-masking to navigate the intractably large search space and strictly enforce complex power, thermal, and instrument constraints. The resulting architecture generates globally feasible schedules with overwhelming probability, establishes operational trust, and executes a full training cycle in under six hours, circumventing the need for policy robustness by enabling rapid, on-demand retraining. Further, resulting schedules outperform baseline heuristics in scheduled science quality. The deep reinforcement learning framework was deployed as the default operational scheduler for the Carruthers Geocorona Observatory mission from the outset of the mission, demonstrating that deep reinforcement learning can be trusted for real spacecraft operations under complex, evolving constraints.

Geocorona↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

Kidd, Luanne↗

RL-HEMS: Reinforcement Learning Based Home Energy Management System for HVAC Energy Optimization

Heating, ventilation, and air conditioning (HVAC) is one of the major energy consumers in the residential sector. It is important to be able to monitor and control the energy consumed to provide utility services such as load shaping while satisfying the comfort and economic constraints of the homeowner. The objective of this work is to create the optimal schedule for HVAC operation to reduce the cost while satisfying the home-owner and equipment’s constraints using a model-free Reinforcement Learning (RL)-based optimization. The specific goal is to find the right balance between reducing energy cost, consumption, and customer comfort level. Our research effort addresses this optimization problem using multiple components: the development of initial learning test-bed and implementation of RL techniques on a real home. This will enable the rapid evaluation of the RL techniques and provide an early baseline to train before implementation on site. The RL algorithm is designed to learn the energy use patterns and generate the optimized schedule for HVAC within an acceptable time-interval to satisfy the homeowner’s comfort and minimize the energy usage. Our preliminary results are promising and we have observed a 17% reduction in the total cost and a 15% reduction in the power utilization using our RL-based HVAC model—RL-HEMS.

Kotevska, Olivera↗

SMC 2021 : Analyzing Resource Utilization and User Behavior on Titan Supercomputer

Resource utilization statistics of submitted jobs on a supercomputer can help us understand how users from various scientific domains use HPC platforms and better design a job scheduler. We explore to generate insight regarding workload distribution and usage pattern domains from job scheduler trace, GPU failure information, and project-specific information collected from Titan supercomputer. Furthermore, we want to know how the scheduler performance varies over time and how the users' scheduling behavior changes following a system failure. These observations have the potential to provide valuable insight, which is helpful to prepare for system failures. These practices will help us develop and apply novel machine learning algorithms in understanding system behavior, requirement, and better scheduling of HPC systems. There are two datasets, RUR and GPU. RUR: This dataset is the job scheduler traces collected from the Titan supercomputerfrom 01/01/2015 to 07/31/2019 (2015.csv - 2019.csv). These were collected usingResource Utilization Report (RUR), a Cray-developed resource-usage data collectionand reporting system. It contains the usage information of its critical resources (CPU,Memory, GPU, and I/O) of each running job on Titan during that period [2]. ProjectAreas: Every job is associated with a project ID. TheProjectAreas.csvdatasetprovides a mapping of the project ID to its domain science. GPU: There have been some hardware-related issues in the GPUs in Titan that caused some GPUs to fail, sometimes irrecoverably during some job runs. This dataset provides information regarding these failures during the execution of the submitted jobs. GPUs on Titan are uniquely identified by a serial number (SN), and they are installed in a location. A GPU can be installed in a location, then removed from that location following a failure, and then re-installed in a different location after fixing the problem. If the failure can't be recovered, the GPU might be removed entirely from Titan. There are two prominent types of failures that resulted in the removal of GPUs from Titan: Double Bit Error (DBE) and Out of the Bus (OTB). The dataset (gc_full.csv) has the following fields: 1. SN : Serial number of a GPU 2. location : The location where it is installed 3. insert : The time when it was inserted into that location 4. remove : The time when it was removed from that location 5. duration : Amount of time the GPU spent in this location 6. out : If the device was taken out entirely w/o a re-installment into a new location. 7. event : If the GPU was taken out entirely, the reason for its removal. To learn more about this dataset, please refer to the git repositoryhttps://github.com/olcf/TitanGPULifeand the related publication [1]. References [1] George Ostrouchov, Don Maxwell, Rizwan A Ashraf, Christian Engelmann, MallikarjunShankar, and James H Rogers. Gpu lifetimes on titan supercomputer: Survival analysisand reliability. InSC20: International Conference for High Performance Computing,Networking, Storage and Analysis, pages 1-14. IEEE, 2020. [2] Feiyi Wang, Sarp Oral, Satyabrata Sen, and Neena Imam. Learning from five-yearresource-utilization data of titan system. In2019 IEEE International Conference onCluster Computing (CLUSTER), pages 1-6. IEEE, 2019.

42 ENGINEERING↗

SMC 2021 Data Challenge: Analyzing Resource Utilization and User Behavior on Titan Supercomputer

Resource utilization statistics of submitted jobs on a supercomputer can help us understand how users from various scientific domains use HPC platforms and better design a job scheduler. We explore to generate insight regarding workload distribution and usage pattern domains from job scheduler trace, GPU failure information, and project-specific information collected from Titan supercomputer. Furthermore, we want to know how the scheduler performance varies over time and how the users' scheduling behavior changes following a system failure. These observations have the potential to provide valuable insight, which is helpful to prepare for system failures. These practices will help us develop and apply novel machine learning algorithms in understanding system behavior, requirement, and better scheduling of HPC systems. There are two datasets, RUR and GPU: RUR dataset is the job scheduler traces collected from the Titan supercomputer from 01/01/2015 to 07/31/2019 (2015.csv - 2019.csv). These were collected using resource Utilization Report (RUR), a Cray-developed resource-usage data collection and reporting system. It contains the usage information of its critical resources (CPU, Memory, GPU, and I/O) of each running job on Titan during that period (https://ieeexplore.ieee.org/abstract/document/8891001). It includes ProjectAreas as additional information, every job is associated with a project ID. TheProjectAreas.csv dataset provides a mapping of the project ID to its domain science. GPU dataset has information regarding GPU failure on Titan. There have been some hardware-related issues in the GPUs in Titan that caused some GPUs to fail, sometimes irrecoverably during some job runs. This dataset provides information regarding these failures during the execution of the submitted jobs. GPUs on Titan are uniquely identified by a serial number (SN), and they are installed in a location. A GPU can be installed in a location, then removed from that location following a failure, and then re-installed in a different location after fixing the problem. If the failure can't be recovered, the GPU might be removed entirely from Titan. There are two prominent types of failures that resulted in the removal of GPUs from Titan: Double Bit Error (DBE) and Out of the Bus (OTB). The dataset (gc_full.csv) has seven attributes, we provided a short description of these attributes in the ReadMe file. To learn more about this dataset, please refer to the git repository https://github.com/olcf/TitanGPULife and the related publication (https://ieeexplore.ieee.org/abstract/document/9355319).

42 ENGINEERING↗

Tuning the Legacy Survey of Space and Time (LSST) Observing Strategy for Solar System Science

Abstract The Vera C. Rubin Observatory is expected to start the Legacy Survey of Space and Time (LSST) in early to mid-2025. This multiband wide-field synoptic survey will transform our view of the solar system, with the discovery and monitoring of over five million small bodies. The final survey strategy chosen for LSST has direct implications on the discoverability and characterization of solar system minor planets and passing interstellar objects. Creating an inventory of the solar system is one of the four main LSST science drivers. The LSST observing cadence is a complex optimization problem that must balance the priorities and needs of all the key LSST science areas. To design the best LSST survey strategy, a series of operation simulations using the Rubin Observatory scheduler have been generated to explore the various options for tuning observing parameters and prioritizations. We explore the impact of the various simulated LSST observing strategies on studying the solar system’s small body reservoirs. We examine what are the best observing scenarios and review what are the important considerations for maximizing LSST solar system science. In general, most of the LSST cadence simulations produce ±5% or less variations in our chosen key metrics, but a subset of the simulations significantly hinder science returns with much larger losses in the discovery and light-curve metrics.

79 ASTRONOMY AND ASTROPHYSICS↗

A cycle timer for testing electric vehicles

A cycle timer was developed to assist the driver of an electric vehicle in more accurately following and repeating SAE driving schedules. These schedules require operating an electric vehicle in a selected stop-and-go driving cycle and repeating this cycle pattern until the vehicle ceases to meet the requirements of the cycle. The heart of the system is a programmable read-only memory (PROM) that has the required test profiles permanently recorded on plug-in cards, one card for each different driving schedule. The PROM generates a direct current analog signal that drives a speedometer displayed on one scale of a dual movement meter. The second scale of the dual movement meter displays the actual speed of the vehicle as recorded by the fifth wheel. The vehicle operator controls vehicle speed to match the desired profile speed. The PROM controls the recycle start time as well as the buzzer activation. The cycle programmer is powered by the test vehicle's 12-volt accessory battery, through a 5-volt regulator and a 12-volt dc-to-dc converter.

Soltis, R. F.↗

California's geothermal resource potential

According to a U.S. Geological Survey estimate, recoverable hydrothermal energy in California may amount to 19,000 MW of electric power for a 30-year period. At present, a geothermal installation in the Geysers region of the state provides 502 MWe of capacity; an additional 1500 MWe of electric generating capacity is scheduled to be in operation in geothermal fields by 1985. In addition to hydrothermal energy sources, hot-igneous and conduction-dominated resources are under investigation for possible development. Land-use conflicts, environmental concerns and lack of risk capital may limit this development.

Leibowitz, L. P.↗

Forecasting of loading on the Deep Space Network for proposed future NASA mission sets

The paper describes a computer program, DSNLOAD, which provides the Deep Space Network (DSN) loading information given a proposed future NASA mission set. The DSNLOAD model includes required pre- and post-calibration periods, and station 'overhead' such as maintenance or 'down' time. The analysis is presented which transforms station view period data for the mission set into loading matrices used to assess loading requirement. Assessment of future loading on the DSN for a set of NASA missions by estimating the tracking situation and presenting the DSN loading data, and a flowchart for selecting a possible future mission, determining a heliocentric orbit for the mission, generating view period schedules, and converting these schedules into basic loading data for each mission for each station are given. The tracking schedule model which considers the tracking schedule to be represented by passes of maximum required length and centered within the view period of available tracking time for each mission is described, and, finally, an example of typical loading study is provided.

Webb, W. A.↗

Mission operations computing systems evolution

As part of its preparation for the operational Shuttle era, the Goddard Space Flight Center (GSFC) is currently replacing most of the mission operations computing complexes that have supported near-earth space missions since the late 1960's. Major associated systems include the Metric Data Facility (MDF) which preprocesses, stores, and forwards all near-earth satellite tracking data; the Orbit Computation System (OCS) which determines related production orbit and attitude information; the Flight Dynamics System (FDS) which formulates spacecraft attitude and orbit maneuvers; and the Command Management System (CMS) which handles mission planning, scheduling, and command generation and integration. Management issues and experiences for the resultant replacement process are driven by a wide range of possible future mission requirements, flight-critical system aspects, complex internal system interfaces, extensive existing applications software, and phasing to optimize systems evolution.

Kurzhals, P. R.↗

Design of automated system for management of arrival traffic

The design of an automated air traffic control system based on a hierarchy of advisory tools for controllers is described. Compatibility of the tools with the human controller, a key objective of the design, is achieved by a judicious selection of tasks to be automated and careful attention to the design of the controller system interface. The design comprises three interconnected subsystems referred to as the Traffic Management Advisor, the Descent Advisor, and the Final Approach Spacing Tool. Each of these subsystems provides a collection of tools for specific controller positions and tasks. The design of two of these tools, the Descent Advisor, which provides automation tools for managing descent traffic, and the Traffic Management Advisor, which generates optimum landing schedules is focused on. The algorithms, automation modes, and graphical interfaces incorporated in the design are described.

Erzberger, Heinz↗

The STIS MAMA status: Current detector performance

The STIS (Space Telescope Imaging Spectrograph) is a second generation Hubble instrument scheduled to fly in 1997. Through a variety of modes, the instrument will provide spectral resolutions from R approximately 50 in the objective spectroscopy mode to 100,000 in the high resolution echelle mode in the wavelength region from 115 to 1000 nm. In the UV the instrument employs two MAMA (Multimode Anode Microchannel plate Arrays) 1024 by 1024 pixel detectors, which provide high DQE (Detective Quantum Efficiency), and good dynamic range and resolution. The current progress and performance of these detectors are reported, illustrating that the technology is mature and that the performance is very close to flight requirements.

Danks, A. C.↗

2 kWe Solar Dynamic Ground Test Demonstration Project: Executive Summary - Volume 1

The Solar Dynamic Ground Test Demonstration (SDGTD) successfully demonstrated a solar-powered closed Brayton cycle system in a relevant space thermal environment. In addition to meeting technical requirements the project was completed 4 months ahead of schedule and under budget. The following conclusions can be supported: 1. The component technology for solar dynamic closed Brayton cycle technology has clearly been demonstrated. 2. The thermal, optical, control, and electrical integration aspects of systems integration have also been successfully demonstrated. Physical integration aspects were not attempted as these tend to be driven primarily by mission-specific requirements. 3. System efficiency of greater than 15 percent (all losses fully accounted for) was demonstrated using equipment and designs which were not optimized. Some preexisting hardware was used to minimize cost and schedule. 4. Power generation of 2 kWe. 5. A NASA/industry team was developed that successfully worked together to accomplish project goals. The material presented in this report will show that the technology necessary to design and fabricate solar dynamic electrical power systems for space has been successfully developed and demonstrated. The data will further show that achieved results compare well with pretest predictions. The next step in the development of solar dynamic space power will be a flight test.

Alexander, Dennis↗

Autonomous Satellite Command and Control through the World Wide Web: Phase 3

NASA's New Millenium Program (NMP) has identified a variety of revolutionary technologies that will support orders of magnitude improvements in the capabilities of spacecraft missions. This program's Autonomy team has focused on science and engineering automation technologies. In doing so, it has established a clear development roadmap specifying the experiments and demonstrations required to mature these technologies. The primary developmental thrusts of this roadmap are in the areas of remote agents, PI/operator interface, planning/scheduling fault management, and smart execution architectures. Phases 1 and 2 of the ASSET Project (previously known as the WebSat project) have focused on establishing World Wide Web-based commanding and telemetry services as an advanced means of interfacing a spacecraft system with the PI and operators. Current automated capabilities include Web-based command submission, limited contact scheduling, command list generation and transfer to the ground station, spacecraft support for demonstrations experiments, data transfer from the ground station back to the ASSET system, data archiving, and Web-based telemetry distribution. Phase 2 was finished in December 1996. During January-December 1997 work was commenced on Phase 3 of the ASSET Project. Phase 3 is the subject of this report. This phase permitted SSDL and its project partners to expand the ASSET system in a variety of ways. These added capabilities included the advancement of ground station capabilities, the adaptation of spacecraft on-board software, and the expansion of capabilities of the ASSET management algorithms. Specific goals of Phase 3 were: (1) Extend Web-based goal-level commanding for both the payload PI and the spacecraft engineer; (2) Support prioritized handling of multiple PIs as well as associated payload experimenters; (3) Expand the number and types of experiments supported by the ASSET system and its associated spacecraft; (4) Implement more advanced resource management, modeling and fault management capabilities that integrate the space and ground segments of the space system hardware; (5) Implement a beacon monitoring test; (6) Implement an experimental blackboard controller for space system management; (7) Further define typical ground station developments required for Internet-based remote control and for full system automation of the PI-to-spacecraft link. Each of those goals is examined in the next section. Significant sections of this report were also published as a conference paper.

Cantwell, Brian↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into usehl knowledge that equips the team to design and develop superior products for customers and stakeholders. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates these resources to create an engineering business environment that promotes mission success.

Kidd, Luanne↗

Operations Concepts for Deep-Space Missions: Challenges and Opportunities

Historically, manned spacecraft missions have relied heavily on real-time communication links between crewmembers and ground control for generating crew activity schedules and working time-critical off-nominal situations. On crewed missions beyond the Earth-Moon system, speed-of-light limitations will render this ground-centered concept of operations obsolete. A new, more distributed concept of operations will have to be developed in which the crew takes on more responsibility for real-time anomaly diagnosis and resolution, activity planning and replanning, and flight operations. I will discuss the innovative information technologies, human-machine interfaces, and simulation capabilities that must be developed in order to develop, test, and validate deep-space mission operations

McCann, Robert S.↗

Benefits Assessment for Tactical Runway Configuration Management Tool

The Tactical Runway Configuration Management (TRCM) software tool was developed to provide air traffic flow managers and supervisors with recommendations for airport configuration changes and runway usage. The objective for this study is to conduct a benefits assessment at Memphis (MEM), Dallas Fort-Worth (DFW) and New York's John F. Kennedy (JFK) airports using the TRCM tool. Results from simulations using the TRCM-generated runway configuration schedule are compared with results using historical schedules. For the 12 days of data used in this analysis, the transit time (arrival fix to spot on airport movement area for arrivals, or spot to departure fix for departures) for MEM departures is greater (7%) than for arrivals (3%); for JFK, there is a benefit for arrivals (9%) but not for departures (-2%); for DFW, arrivals show a slight benefit (1%), but this is offset by departures (-2%). Departure queue length benefits show fewer aircraft in queue for JFK (29%) and MEM (11%), but not for DFW (-13%). Fuel savings for surface operations at MEM are seen for both arrivals and departures. At JFK there are fuel savings for arrivals, but these are offset by increased fuel use for departures. In this study, no surface fuel benefits resulted for DFW. Results suggest that the TRCM algorithm requires modifications for complex surface traffic operations that can cause taxi delays. For all three airports, the average number of changes in flow direction (runway configuration) recommended by TRCM was many times greater than the historical data; TRCM would need to be adapted to a particular airport's needs, to limit the number of changes to acceptable levels. The results from this analysis indicate the TRCM tool can provide benefits at some high-capacity airports. The magnitude of these benefits depends on many airport-specific factors and would require adaptation of the TRCM tool; a detailed assessment is needed prior to determining suitability for a particular airport.

Oseguera-Lohr, Rosa↗

Avionics Configuration Assessment for Flightdeck Interval Management: A Comparison of Avionics and Notification Methods

Flightdeck Interval Management is one of the NextGen operational concepts that FAA is sponsoring to realize requisite National Airspace System (NAS) efficiencies. Interval Management will reduce variability in temporal deviations at a position, and thereby reduce buffers typically applied by controllers - resulting in higher arrival rates, and more efficient operations. Ground software generates a strategic schedule of aircraft pairs. Air Traffic Control (ATC) provides an IM clearance with the IM spacing objective (i.e., the TTF, and at which point to achieve the appropriate spacing from this aircraft) to the IM aircraft. Pilots must dial FIM speeds into the speed window on the Mode Control Panel in a timely manner, and attend to deviations between actual speed and the instantaneous FIM profile speed. Here, the crew is assumed to be operating the aircraft with autothrottles on, with autopilot engaged, and the autoflight system in Vertical Navigation (VNAV) and Lateral Navigation (LNAV); and is responsible for safely flying the aircraft while maintaining situation awareness of their ability to follow FIM speed commands and to achieve the FIM spacing goal. The objective of this study is to examine whether three Notification Methods and four Avionics Conditions affect pilots' performance, ratings on constructs associated with performance (workload, situation awareness), or opinions on acceptability. Three Notification Methods (alternate visual and aural alerts that notified pilots to the onset of a speed target, conformance deviation from the required speed profile, and reminded them if they failed to enter the speed within 10 seconds) were examined. These Notification Methods were: VVV (visuals for all three events), VAV (visuals for all three events, plus an aural for speed conformance deviations), and AAA (visual indications and the same aural to indicate all three of these events). Avionics Conditions were defined by the instrumentation (and location) used to present IM information to crews: (1) Integrated (IM information is embedded in extant PFD (Primary Flight Display), ND (Navigation Display), EICAS (Engine Indicating and Crew Alerting System) displays); (2) EFB_Aft (IM information is only supplied in an EFB and mounted in location similar to that for MITRE's UPS work); (3) EFB_Fore (IM information is only supplied in an EFB which is mounted more forward, under the side window), and (4) EFB_Aft plus use of an AGD (the same IM information is supplied in an EFB and on an AGD, both mounted in locations similar to that in MITRE's UPS work ). Twelve commercial pilot crews flew descent scenarios (VNAV Speed with the mode control panel (MCP) speed window open until flaps extended, then VNAV Path) in a commercial transport flight simulator with realistic visual scene and communications. The results of this study serve three practical aims: (1) contribute to the down-select of avionics configuration for future assessment of the ASTAR spacing algorithm at NASA; (2) provide information useful to the FAA Human Factors Division (ANG-C1)'s mission to identify issues pertinent to flight certification of, and flight standards; (3) identify methodological considerations in support of future FIM human-in-the-loop (HITL) investigations.

Latorella, Kara A.↗