Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “GRACE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

SuperCool Inflation: A Graceful Exit from Eternal Inflation at LHC Scales and Below

In SuperCool Inflation (SCI), a technically natural and thermal effect gives a graceful exit to old inflation. The Universe starts off hot and trapped in a false vacuum. The Universe supercools and inflates solving the horizon and flatness problems. The inflaton couples to a set of QCD like fermions. When the fermions' non-Abelian gauge group freezes, the Yukawa terms generate a tadpole for the inflaton, which removes the barrier. Inflation ends, and the Universe rapidly reheats. The thermal effect is technically natural in the same way that the QCD scale is technically natural. In fact, Witten used a similar mechanism to drive the Electro-Weak (EW) phase transition/ critically, no scalar field drives inflation, which allows SCI to avoid eternal inflation and the measure problem. SCI also works at scales, which can be probed in the lab, and could be connected to EW symmetry breaking. Finally, we introduce a light spectator field to generate density perturbations, which match the CMB. The light field does not affect the inflationary dynamics and can potentially generate non-Gaussianities and isocurvature perturbations observable with Planck.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineers (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sum Reduction with OpenMP Offload on NVIDIA Grace-Hopper System

We evaluate the performance of the baseline and optimized reductions in OpenMP on an NVIDIA Grace-Hopper system. We explore the impacts of the number of teams, the number of elements to sum per loop iteration, and simultaneous execution on the central-processing unit (CPU) and the GPU in the unified memory (UM) mode upon the reduction performance. The experimental results show that the optimized reductions are 6.120X to 20.906X faster than the baselines on the GPU, and their efficiency ranges from 89% to 95% of the theoretical GPU memory bandwidth. Depending on where an input array is allocated in the program when co-running the reduction on the CPU and GPU in the UM mode, the average speedup over the GPU-only execution is approximately 2.484 or 1.067, and the speedup of the optimized reductions over the baseline reductions ranges from 0.996 to 10.654 or from 0.998 to 6.729.

Jin, Zheming↗

Groundwater Volume Loss in Mexico City Constrained by InSAR and GRACE Observations and Mechanical Models

Abstract Groundwater withdrawal can cause localized and rapid poroelastic subsidence, spatially broad elastic uplift of low amplitude, and changes in the gravity field. Constraining groundwater loss in Mexico City, we analyze data from the Gravity Recovery and Climate Experiment and its follow‐on mission (GRACE/FO) and Synthetic Aperture Radar (SAR) Sentinel‐1A/B images between 2014 and 2021. GRACE/FO observations yield a groundwater loss of 0.85–3.87 km 3 /yr for a region of ∼300 × 600 km surrounding Mexico City. Using the high‐resolution interferometric SAR data set, we measure >35 cm/yr subsidence within the city and up to 2 cm/yr of uplift in nearby areas. Attributing the long‐term subsidence to poroelastic aquifer compaction and the long‐term uplift to elastic unloading, we apply respective models informed by local geology, yielding groundwater loss of 0.86–12.57 km 3 /yr. Our results suggest Mexico City aquifers have been depleting at faster rates since 2015, exacerbating the socioeconomic and health impacts of long‐term groundwater overdrafts.

58 GEOSCIENCES↗

GRACE: millimeters and microns in orbit

The Gravity Recovery and Climate Experiment launched March 17, 2002. The GPS data for this experiment are processed to contribute to the recover long wavelength gravity field; remove errors due to long term on-board oscillator drift; and align K/Ka-band measurments between the two spacecraft to 0.1 ns. This paper will concentrate on the use of GPS for these timing and calibration functions and will not address the recovery of the gravity field.

GRACE GPS K/Ka-band↗

Recent Mascon Solutions from GRACE

Mascon (mass concentration) solutions computed for entire land area of Earth with several variants from Jul. 2003 through Dec. 2005 Automated scripts developed, "pipeline" now in place. Solutions generally consistent with harmonics for large features but appear able to resolve and localize smaller features more cleanly. Greenland solutions generally consistent with areas of max ice mass loss in South, but mascons seem to clearly identify sub-regions of ice mass growth. May be amplified by mascon sensitivity and ground tracks. Irregular coverage, errors due to tides in Arctic or other leakage from nearby sources? Although mascons are technically 30+ years old, gravity/geodesy community has vastly more experience with harmonics and thus we are still learning the full advantages, limitations, and idiosyncrasies of mascons.

GRACE↗