At least 181 records · Page 10

Safer Liquid Natural Gas

After the disaster of Staten Island in 1973 where 40 people were killed repairing a liquid natural gas storage tank, the New York Fire Commissioner requested NASA's help in drawing up a comprehensive plan to cover the design, construction, and operation of liquid natural gas facilities. Two programs are underway. The first transfers comprehensive risk management techniques and procedures which take the form of an instruction document that includes determining liquid-gas risks through engineering analysis and tests, controlling these risks by setting up redundant fail safe techniques, and establishing criteria calling for decisions that eliminate or accept certain risks. The second program prepares a liquid gas safety manual (the first of its kind).

Source record↗

Risk analysis and management

Present software development accomplishments are indicative of the emerging interest in and increasing efforts to provide risk assessment backbone tools in the manned spacecraft engineering community. There are indications that similar efforts are underway in the chemical processes industry and are probably being planned for other high risk ground base environments. It appears that complex flight systems intended for extended manned planetary exploration will drive this technology.

Smith, H. E.↗

X-57 Systems Engineering Lessons Learned

The X-57 Maxwell is an electric aircraft based on a 4-passenger, twin engine Tecnam P2006T General Aviation aircraft. The X-57 project originally envisioned a straightforward integration of commercial-off-the-shelf hardware components and software into a novel configuration to demonstrate the aerodynamic and performance benefits of Distributed Electric Propulsion (DEP). The project was initially started with a high-risk venture capitalist approach under NASA’s Convergent Aeronautics Solutions (CAS) project, which led to an initial philosophy of Project Management “light” (which was then interpreted as Systems Engineering (SE) “light”). As the project matured, it was forced to transition to one with increasing SE-rigor as the project scope changed, hardware and software deficiencies were found, and the team realized the magnitude of the technical and integration challenges. In hindsight, these technical challenges came in part from an overly optimistic technology readiness assessment (TRA) at the beginning of the project, which resulted in the project assuming that little to no subsystem development would be required. The project’s approach to systems engineering evolved throughout three separate informal phases of the project as it underwent two key transitions as a result of the team wrestling with the technical challenges and resultant changing project scope. This paper discusses the assumptions, approaches, and challenges encountered from a Systems Engineering standpoint in each of the three informal phases of the X-57 project. This paper also provides recommendations on how future projects can apply Systems Engineering best practices upfront along with a realistic TRA to aid projects that find themselves with similar challenges.

Systems Engineering↗

The Advanced Exploration Systems Water Recovery Project: Innovation on 2 Fronts

As NASA looks forward to sending humans farther away from Earth, we will have to develop a transportation architecture that is highly reliable and that can sustain life for long durations without the benefit of Earth s proximity for continuous resupply or even operational guidance. NASA has consistently been challenged with performing great feats of innovation, but particularly in this time of economic stress, we are challenged to go farther with less. The Advanced Exploration Systems (AES) projects were implemented to address both of these needs by not only developing innovative technologies, but by incorporating innovative management styles and processes that foster the needed technical innovation given a small amount of resources. This presentation explains how the AES Water Recovery Project is exhibiting innovation on both fronts; technical and process. The AES Water Recovery Project (WRP) is actively engineering innovative technologies in order to maximize the efficiency of water recovery. The development of reliable, energy-efficient, and low-mass spacecraft systems to provide environmental control and life support (ECLS) is critical to enable long-duration human missions outside of low-Earth orbit. Recycling of life support consumables is necessary to reduce resupply mass and provide for vehicle autonomy. To address this, the WRP is working on a rotary distiller that has shown enhanced performance over the state-of-the-art (SOA). Additionally, the WRP is looking at innovative ways to address issues present in the state-of-the-art (SOA) systems pertaining to toxicity and calcium scale buildup. As an AES project, the WRP has a more streamlined Skunk Works like approach to technology development intended to reduce overhead but achieve a more refined end product. The project has incorporated key partnerships between NASA centers as well as between NASA and industry. A minimal project management style has been implemented such that risks are managed and milestones tracked without overburdening the team with reporting demands that take them away from their work. A lean Systems Engineering (SE) approach has been implemented where project objectives are defined and vetted early without overprescribing the process or limiting the ability to innovate. Finally, we are working with existing flight hardware support organizations like operations, safety, materials and others to impact the system design at the breadboard level. This type of early input is a key to ensuring that the technologies are developed on the right track to becoming space flight worthy.

Sarguisingh, Miriam M.↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session Two

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. A comprehensive exploration of BESS cybersecurity supply chain risks, systematic vendor risk assessment through the BESS Procurement Guide, and practical application of the INL SCRM Chatbot for enhanced supply chain resilience. This is Session 2 of 3. (Full Version)

25 - ENERGY STORAGE↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session One

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. This is Session 1 of 3. (Full Version)

25 - ENERGY STORAGE↗

Management of Risks Associated with Application of Novel Materials in Novel Operating Environments in Novel Reactor Designs

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. These challenges are discussed in the paper, and a potentially applicable modeling approach based on cumulative damage rather than failure rates is briefly illustrated.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session One - Abridged

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. This is Session 1 of 3.

25 - ENERGY STORAGE↗

The Parable of the Boiled System Safety Professional: Drift to Failure

Recall from the Parable of the Boiled Frog, that tossing a frog into boiling water causes the frog to jump out and hop away while placing a frog in suitable temperature water and slowly bringing the water to a boil results in the frog boiling due to not being aware of the slowly increasing danger, theoretically, of course. System safety professionals must guard against allowing dangers to creep unnoticed into their projects and be ever alert to notice signs of impending problems. People have used various phrases related to the idea, most notably, latent conditions, James Reason in Managing the Risks of Organizational Accidents (1, pp 10-11), Drift to Failure, Sydney Dekker (2, pp 82-86) in Resilience Engineering: Chronicling the Emergence of Confused Consensus in Resilience Engineering: Concepts and Precepts, Hollnagel, Woods and Leveson, and normalization of deviance, Diane Vaughan in The Challenger Launch Decision: Risky Technology, Culture, and Deviance at NASA (3). Reason also said, If eternal vigilance is the price of liberty, then chronic unease is the price of safety (1, p 37). Our challenge as system safety professionals is to be aware of the emergence of signals that warn us of slowly eroding safety margins. This paper will discuss how system safety professionals might better perform in that regard.

Shivers, C. Herbert↗

GPM Timeline Inhibits For IT Processing

The Safety Inhibit Timeline Tool was created as one approach to capturing and understanding inhibits and controls from IT through launch. Global Precipitation Measurement (GPM) Mission, which launched from Japan in March 2014, was a joint mission under a partnership between the National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA). GPM was one of the first NASA Goddard in-house programs that extensively used software controls. Using this tool during the GPM buildup allowed a thorough review of inhibit and safety critical software design for hazardous subsystems such as the high gain antenna boom, solar array, and instrument deployments, transmitter turn-on, propulsion system release, and instrument radar turn-on. The GPM safety team developed a methodology to document software safety as part of the standard hazard report. As a result of this process, a new tool safety inhibit timeline was created for management of inhibits and their controls during spacecraft buildup and testing during IT at GSFC and at the launch range in Japan. The Safety Inhibit Timeline Tool was a pathfinder approach for reviewing software that controls the electrical inhibits. The Safety Inhibit Timeline Tool strengthens the Safety Analysts understanding of the removal of inhibits during the IT process with safety critical software. With this tool, the Safety Analyst can confirm proper safe configuration of a spacecraft during each IT test, track inhibit and software configuration changes, and assess software criticality. In addition to understanding inhibits and controls during IT, the tool allows the Safety Analyst to better communicate to engineers and management the changes in inhibit states with each phase of hardware and software testing and the impact of safety risks. Lessons learned from participating in the GPM campaign at NASA and JAXA will be discussed during this session.

Inhibits↗

Life Sciences Data Archives (LSDA) in the Post-Shuttle Era

Now, more than ever before, NASA is realizing the value and importance of their intellectual assets. Principles of knowledge management-the systematic use and reuse of information, experience, and expertise to achieve a specific goal-are being applied throughout the agency. LSDA is also applying these solutions, which rely on a combination of content and collaboration technologies, to enable research teams to create, capture, share, and harness knowledge to do the things they do well, even better. In the early days of spaceflight, space life sciences data were collected and stored in numerous databases, formats, media-types and geographical locations. These data were largely unknown/unavailable to the research community. The Biomedical Informatics and Health Care Systems Branch of the Space Life Sciences Directorate at JSC and the Data Archive Project at ARC, with funding from the Human Research Program through the Exploration Medical Capability Element, are fulfilling these requirements through the systematic population of the Life Sciences Data Archive. This project constitutes a formal system for the acquisition, archival and distribution of data for HRP-related experiments and investigations. The general goal of the archive is to acquire, preserve, and distribute these data and be responsive to inquiries for the science communities. Information about experiments and data, as well as non-attributable human data and data from other species' are available on our public Web site http://lsda.jsc.nasa.gov. The Web site also includes a repository for biospecimens, and a utilization process. NASA has undertaken an initiative to develop a Shuttle Data Archive repository. The Shuttle program is nearing its end in 2010 and it is critical that the medical and research data related to the Shuttle program be captured, retained, and usable for research, lessons learned, and future mission planning. Communities of practice are groups of people who share a concern or a passion for something they do, and learn how to do it better as they interact regularly. LSDA works with the HRP community of practice to ensure that we are preserving the relevant research and data they need in the LSDA repository. An evidence-based approach to risk management is required in space life sciences. Evidence changes over time. LSDA has a pilot project with Collexis, a new type of Web-based search engine. Collexis differentiates itself from full-text search engines by making use of thesauri for information retrieval. The high-quality search is based on semantics that have been defined in a life sciences ontology. Additionally, Collexis' matching technology is unique, allowing discovery of partially matching dicuments. Users do not have to construct a complicated (Boolean) search query, but can simply enter a free text search without the risk of getting "no results". Collexis may address these issues by virtue of its retrieval and discovery capabilities across multiple repositories.

Fitts, Mary A.↗

Modeling for Integrated Science Management and Resilient Systems Development

Many physiological, environmental, and operational risks exist for crewmembers during spaceflight. An understanding of these risks from an integrated perspective is required to provide effective and efficient mitigations during future exploration missions that typically have stringent limitations on resources available, such as mass, power, and crew time. The Human Research Program (HRP) is in the early stages of developing collaborative modeling approaches for the purposes of managing its science portfolio in an integrated manner to support cross-disciplinary risk mitigation strategies and to enable resilient human and engineered systems in the spaceflight environment. In this talk, we will share ideas being explored from fields such as network science, complexity theory, and system-of-systems modeling. Initial work on tools to support these explorations will be discussed briefly, along with ideas for future efforts.

Shelhamer, M.↗

Lessons Learned from NASA Goddard Space Flight Center’s Product Development Lead Training Schedule and Cost Development Workshop: Continuous Improvement

This presentation provides a status of the Goddard Space Flight Center (GSFC) effort to increase foundational knowledge of Product Development Leads (PDLs) in schedule and cost management including earned value management (EVM). In 2012, GSFC’s Engineering and Technology Directorate (ETD) implemented an in-house training program to prepare PDLs for managing the technical, cost, schedule, and risk aspects of spaceflight systems to meet their subsystem commitments. Developed in-house, the PDL training program provides an integrated approach to requirements development, risk, schedule and cost management, EVM, performance tracking, and other areas. The program has been held twice yearly since its inception with 531 participating and 451 completing the curriculum. In 2017, the program won the Robert H. Goddard award for Quality and Process Improvement. Program development and evolution were presented in the 2018 NASA Schedule and Cost Symposium. The presentation was so well received that this year we focus on one workshop within the program: Schedule and Cost Development, including EVM. We examine the on-going logic modeling process and how participant and stakeholder data influence workshop content and design, and how the disciplines of schedule and cost contribute to mission success. In this presentation we refresh you on how the approach integrates lecture, small group discussion, estimating, case study exercises, and problem solving. We update you on the data collected from participants and stakeholders, and we discuss how we use these data to measure training effectiveness. Specific topics include: • How the logic model is used as the backbone for continuous program improvement, • How feedback influences implementation and curriculum updates, • How data collection and analysis inform workshop content and development, including participant discoveries of EVM data, • How including the resource analyst and planner in the product development team supports project success.

Lessons Learned↗

Project Interface Requirements Process Including Shuttle Lessons Learned

Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

Bauch, Garland T.↗

Cyber Conservative Operations

In an era of increasingly sophisticated and pervasive cyber threats, robust cyber resilience strategies are more critical than ever. This paper introduces the concept of Cyber Conservative Operations, a proactive approach designed to assist critical infrastructure owners and operators in managing risk and maintaining resilience in the face of imminent, yet not occurring, cyber events. By leveraging the principles of Cyber-Informed Engineering (CIE) and the energy sector’s practice of conservative operations, Cyber Conservative Operations offer a framework for planning and executing coordinated active defense and resilience-oriented actions ahead of cyber events. This approach aims to minimize the consequences of digitally-enabled hazards and ensure swift recovery from anticipated cyber threats. Cyber Conservative Operations enhance the ability of owners and operators to execute pre-planned defense and resilience actions, thereby reducing the impact of digitally-enabled hazards. These operations are crucial for addressing impacts that cannot be precisely quantified or forecasted and for preparing organizations for rapid recovery from imminent digital threats. The paper begins with a discussion of conservative operations as applied to the bulk power system (BPS), a current mechanism allowing BPS entities to enact defensive operating plans to mitigate impending grid unreliability. Building on this model, we present a concept for implementing cyber conservative operations at asset owner facilities. The paper concludes with two case studies of cyber conservative operations drawn from high-profile cyber events, illustrating the practical application and benefits of this proactive approach.

42 - ENGINEERING↗

Risk Management at NASA and Its Applicability to the Oil and Gas Industry

NASA has a world-class capability for quantitatively assessing the risk of highly-complex, isolated engineering structures operated in extremely hostile environments. In particular, the International Space Station (ISS) represents a reasonable risk analog for High Pressure, High Temperature drilling and production operations on deepwater rigs. Through a long-term U.S. Government Interagency Agreement, BSEE has partnered with NASA to modify NASA's Probabilistic Risk Assessment (PRA) capabilities for application to deepwater drilling and production operations. The immediate focus of the activity will be to modify NASA PRA Procedure Guides and Methodology Documents to make them applicable to the Oil &Gas Industry. The next step will be for NASA to produce a PRA for a critical drilling system component, such as a Blowout Preventer (BOP). Subsequent activities will be for NASA and industry partners to jointly develop increasingly complex PRA's that analyze other critical drilling and production system components, including both hardware and human reliability. In the presentation, NASA will provide the objectives, schedule, and current status of its PRA activities for BSEE. Additionally, NASA has a Space Act Agreement with Anadarko Petroleum Corporation to develop a PRA for a generic 20K BOP. NASA will summarize some of the preliminary insights gained to date from that 20K BOP PRA as an example of the distinction between quantitative versus qualitative risk assessment.

PRA↗

Knowledge Capture and Management for Space Flight Systems

The incorporation of knowledge capture and knowledge management strategies early in the development phase of an exploration program is necessary for safe and successful missions of human and robotic exploration vehicles over the life of a program. Following the transition from the development to the flight phase, loss of underlying theory and rationale governing design and requirements occur through a number of mechanisms. This degrades the quality of engineering work resulting in increased life cycle costs and risk to mission success and safety of flight. Due to budget constraints, concerned personnel in legacy programs often have to improvise methods for knowledge capture and management using existing, but often sub-optimal, information technology and archival resources. Application of advanced information technology to perform knowledge capture and management would be most effective if program wide requirements are defined at the beginning of a program.

Goodman, John L.↗

Propulsion System Modeling and Simulation

The Aerospace Systems Design Laboratory at the School of Aerospace Engineering in Georgia Institute of Technology has developed a core competency that enables propulsion technology managers to make technology investment decisions substantiated by propulsion and airframe technology system studies. This method assists the designer/manager in selecting appropriate technology concepts while accounting for the presence of risk and uncertainty as well as interactions between disciplines. This capability is incorporated into a single design simulation system that is described in this paper. This propulsion system design environment is created with a commercially available software called iSIGHT, which is a generic computational framework, and with analysis programs for engine cycle, engine flowpath, mission, and economic analyses. iSIGHT is used to integrate these analysis tools within a single computer platform and facilitate information transfer amongst the various codes. The resulting modeling and simulation (M&S) environment in conjunction with the response surface method provides the designer/decision-maker an analytical means to examine the entire design space from either a subsystem and/or system perspective. The results of this paper will enable managers to analytically play what-if games to gain insight in to the benefits (and/or degradation) of changing engine cycle design parameters. Furthermore, the propulsion design space will be explored probabilistically to show the feasibility and viability of the propulsion system integrated with a vehicle.

Tai, Jimmy C. M.↗