Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Draft Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Draft Technical Impracticability Evaluation for Iodine-129 in Groundwater at Hanford: 200-UP-1 Operable Unit

Target restoration cleanup levels for contaminated groundwater are established by applicable or relevant and appropriate requirements (ARARs) determined by federal and state drinking water quality standards. When these standards cannot be met within a reasonable timeframe due to limitations of available remediation technologies or other factors, the U.S. Environmental Protection Agency (EPA) may evaluate the technical impracticability (TI) of attaining the required groundwater cleanup levels, and establish alternative, protective remedial strategies. This report provides information relevant to consideration of a TI waiver on the current federal 1 pCi/L drinking water standard (DWS) for iodine-129 in the 200-UP-1 Groundwater Operable Unit (OU) of the Hanford Site if ongoing evaluations of treatment options do not identify a feasible treatment technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Five-Year NRHP Re-Evaluation of Historic Buildings Assessment

The Lawrence Livermore National Laboratory (LLNL) 'Draft Programmatic Agreement among the Department of Energy and the California State Historic Preservation Officer Regarding Operation of Lawrence Livermore National Laboratory' requires a review and re-evaluation of the eligibility of laboratory properties for the National Register of Historic Places (NRHP) every five years. The original evaluation was published in 2005; this report serves as the first five-year re-evaluation. This re-evaluation includes consideration of changes within LLNL to management, to mission, and to the built environment. it also determines the status of those buildings, objects, and districts that were recommended as NRHP-eligible in the 2005 report. Buildings that were omitted from the earlier building list, those that have reached 50 years of age since the original assessment, and new buildings are also addressed in the re-evaluation.

99 GENERAL AND MISCELLANEOUS↗

SAM Software Quality Assurance Plan Implementation and NQA-1 Assessment

The System Analysis Module (SAM) is an advanced and modern system analysis tool being developed at Argonne National Laboratory under the U.S. DOE Office of Nuclear Energy’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program. As a modern-day software, SAM development included efforts to follow best practices in software development. These best practices include version control using git, independent reviews of development activities, and detailed descriptions of developments and bug fixes using the GitLab issue and merge request system. In Fiscal Year 2023 (FY23), the SAM development team set out to formalize a Software Quality Assurance (SQA) program that allowed industry partners to credit the informal steps being taken by the SAM development team to ensure the quality of the software. As part of formalizing an SQA program, a SQA Plan (SQAP) was developed, implemented, and assessed. The SAM SQAP targets compliance with NQA-1-2008/2009 Addenda. The SQAP builds on the MOOSE SQAP and the Argonne SSQAPP while accounting for the needs of the multi-organization SAM development team. Modifications to the SAM repository structure, including a new testing system, updated test cases, and the development of an internal website, facilitate the implementation of the SAM SQAP. The initial assessment of the SAM SQAP indicated that the SAM SQAP was adequately and effectively implemented and additional work was required to improve the compliance of the SAM SQAP with NQA-1 2008/2009 Addenda. Several improvements to the SQAP have already been drafted to address these assessments and future work is planned to further improve the SAM SQAP in support of end-user needs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Guidelines for lighting of plants in controlled environments

These guidelines for lighting of plants, established by the organizing committee, provided a focus for the discussions at the workshop. The guidelines served as a basis for discussion amongst the workshop attendees and led to a number of recommendations that were recorded by the session chairpersons. The organizing committee indicated they would incorporate the recommendations and suggestions into a revised set of guidelines for additional discussion. It was understood that these guidelines will not be standards and will require upgrading and modifications as lamps and equipment become available and as new insights are obtained on plants' response to light. Revised draft guidelines are included as Tables 1 and 2 that have been developed by the organizing committee following the suggestions obtained at the workshop. The guidelines for growth chambers are in Table 1 and guideines for greenhouses are given in Table 2. These have been distributed to the participants who indicated a willingness to review proposals that were developed. It is hoped that these proposals will lead to the development of guidelines that will have general acceptance by plant scientists.

Dietzer, Gerald↗

Tank Tests of a Powered Model of a Compression Plane, NACA Model 171A-2

The compression plane is intended for operation on or close to the surface of the water, and has a hull with a concave bottom which forms the upper surface of a tunnel into which air is forced under pressure to support part of the load. The results of the tests made in Langley tank no. 1 include values of the horizontal forces, trimming moment, and static pressure in the tunnel for a wide range of loads and speeds and two power conditions, and are presented in the form of curves against speed with load as a parameter. The results are scaled up to 10 times the model size for three conditions at which the model is self-propelled at a steady speed. Lift is obtained from the static pressure of air in the tunnel. In general, the ratio of the gross load to the total resistance increases with increase in load and decrease in speed. This ratio varies between l-7 and 5.7 at high speeds and has a maximum value of 7. The total resistance is nearly the same for both power conditions except at low speeds and heavy loads. No abrupt change in forces on the hull or flow around the hull occurs in. the region of zero draft. The centers of pressure are generally far aft. At the most efficient trim (1.2'), considerable bow-up moment would be required for practicable operation. There is no abrupt transition from the air-borne to the water- borne condition.

Mottard, Elmo J.↗

Potential Impacts of Accelerated Climate Change (4th Annual Report)

Pacific Northwest National Laboratory (PNNL) has completed the fourth year draft Annual Letter Report that summarizes i) NRC needs for climate and hydrologic information, ii) recent research into climate and hydrologic changes that may affect nuclear power plants; iii) recent reports by federal agencies, as well as national and international organizations tasked with climate change research and developing policy with respect to climate change and mitigation; and iv) trends and advances in accommodating required climate change estimates in site specific evaluations. The Northeast U.S., a region defined by the Forth National Climate Assessment is the focus of this report. The NRC COR will review and provide comments on this draft within four weeks.

54 ENVIRONMENTAL SCIENCES↗

Draft Electric Rule 21 Test Protocols for Advanced Inverter Functions

Disclaimer: The following document includes draft certification protocols and should not be viewed as a consensus-based performance standard. Distributed energy resources (DERs), such as photovoltaic (PV) systems, when deployed in a large scale, are capable of significantly influencing the operation of bulk and local power systems. Looking to the future, European and American stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. One of the jurisdictions considering modifications to the DER interconnection requirements is California. To determine what changes could improve electric grid reliability and allow greater penetrations of renewable energy, the California Public Utilities Commission (CPUC) and the California Energy Commission (CEC), in conjunction with consultant Frances Cleveland, convened the Smart Inverter Working Group (SIWG) in January 2013. The SIWG--composed of state agencies, utility engineers, national laboratories, manufacturers, trade associations, and advocacy groups--provided the CPUC a set of recommendations in early 2014 1 . The recommendations included specific advanced DER functions and interoperability requirements, along with a proposed timeline, for California to add new capabilities to grid-interconnected DER. On August 18, 2014 the three California Investor-Owned Utilities (IOUs)--Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE) and San Diego Gas & Electric Company (SDG&E)--drafted a Advice Letter filing to the CPUC setting forth revisions to Electric Tariff Rule 21 to conform to the seven recommendations made by the Working Group 2 . After a comment period, the CPUC issued an update to the IOU recommendations 3 . At the time of this publication, there was no final legal ruling on the CPUC Rulemaking (R.) 11-09-011 ("Order Instituting Rulemaking on the Commission's Own Motion to improve distribution level interconnection rules and regulations for certain classes of electric generators and electric storage resources"). In the U.S., Nationally Recognized Test Laboratories (NRTLs) independently verify products to safety and functional standards. PV inverters are certified to Underwriters Laboratories (UL) Standard 1741 4 . However, new advanced inverter functions described in the SIWG and IOU proposals are not included in this standard, so there is a critical need to develop test protocols for these functions in preparation of a positive ruling by the CPUC. Through a California Solar Initiative Grant, Sandia National Laboratories (Sandia or SNL), Underwriters Laboratories (UL), Electric Power Research Institute, Inc. (EPRI), Xanthus Consulting, SunSpec Alliance, Loggerware, and utility and PV inverter manufacturers have collaborated to draft this certification protocol for the Rule 21 SIWG Phase 1 advanced inverter functions. This report also includes test procedures for Phase 2 and Phase 3 functions that will be demonstrated later in the CSI4 project. This collaborative effort was performed in close junction with the UL 1741 Standards Technical Panel (STP) working group. This document represents a snapshot of the draft testing protocols at the time of publication and not a consensus certification protocol for advanced inverters. 1 California Public Utilities Commission, "Recommendations for Updating the Technical Requirements for Inverters in Distributed Energy Resources, Smart Inverter Working Group Recommendations," Filed 7 Feb 2014. 2 J.J. Newlander, R.G. Litteneker, S.W. Walter, M. Dwyer, Joint motion of Pacific Gas and Electric Company (U 39 E), Southern California Edison Company (U 338 E) and San Diego Gas & Electric Company (U 902 E) regarding implementation of smart inverter functionalities, Rulemaking 11-09-011 Advice Letter, 18 July, 2014. 3 J.T. Sullivan, CPUC Rulemaking 11-09-011 Agenda ID #13460, 13 Nov, 2014. 4 Underwriters Laboratories Std. 1741 Ed. 2, "Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources," 2010.

42 ENGINEERING↗

High-Burnup BWR LOCA Burst Analysis Using High-Fidelity Multiphysics Simulations

The US nuclear industry is looking to improve on the operating economics of the current fleet of light-water reactors (LWRs). One way of achieving this is by operating fuel to higher burnup. In pressurized water reactors (PWRs), relaxing the current burnup limit will allow for cycle length extensions and power uprates; in boiling water reactors (BWRs) it may allow for improved fuel utilization and reduced feed assemblies, as well as more efficient power uprates and increased capacity factors that will support the Administration’s Executive Order to facilitate 5 GW of power uprates at existing nuclear facilities. However, one of the key limitations to operating fuel to higher burnup is the risk of fuel fragmentation, relocation, and dispersal (FFRD). Recognizing the high interest in extending burnup limits, the US Nuclear Regulatory Commission (NRC) has issued Draft Regulatory Guide DG-1434, which defines an approach that would be acceptable to the NRC for addressing FFRD risk. The approach defined will require better understanding of the phenomena leading to FFRD as well as best-estimate simulation methods to understand FFRD risk in high-burnup cores. The Nuclear Energy Advanced Modeling and Simulation program is supporting the FFRD industry challenge problem through development of state-of-the-art, high-fidelity modeling and simulation LWR analysis capabilities; namely, the BISON fuel performance code and the VERA core simulator software. These tools, along with the US NRC TRACE system analysis code, have been utilized for analysis of FFRD risk in both PWR and BWR cores in recent years. The work documented in this report addresses the lack of high-fidelity research for BWRs and builds on a previous activity where the framework has been applied to Cycles 16 through 18 of Limerick Unit 1, a BWR/4, with introduction of 8 high-burnup lead use assemblies (HBLUAs) that were representative of the 8 HBLUAs loaded into Limerick Unit 2 in 2021. VERA was used in this previous activity to model rod-by-rod depletion in these cycles, and its solution was used to initialize a TRACE simulation of a large-break loss-of-coolant accident (LBLOCA) at the end of Cycle 18. In the work documented in this report, the TRACE model was improved by refining the core mesh and utilizing a new feature that allows for capturing the full 3D VERA power distribution in the model. This allows for a more detailed solution for setting BISON boundary conditions. Furthermore, the solutions from VERA and TRACE were used to set up and perform BISON simulations of about 1,000 rods sampled from the core, including all burnup levels. Utilizing two cladding burst models, it was shown that no fuel rods were predicted to burst during the postulated LBLOCA transient. Additionally, a sensitivity study was performed by artificially increasing linear heat rate during the postulated LBLOCA to identify parameters that correlate with rod burst susceptibility. Burnup, fission gas release, and hoop strain were all found to be positively correlated with rod burst susceptibility. Small-break loss-of-coolant accident (SBLOCA) analyses were also performed; these analyses predicted cladding temperature increases that were bounded by the LBLOCA cladding temperatures for all small break sizes studied for this plant. However, future refinements to the plant response assumptions during the SBLOCA could impact the predicted cladding response. Finally, a benchmark study was performed between CTF and TRACE for LOCA conditions to better qualify CTF for BWR LOCA modeling.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Wyoming CarbonSAFE Phase III: Site Characterization and Permitting Commercial-Scale Carbon Storage Complex Feasibility Study at Dry Fork Station, Wyoming

This report presents the findings of the technical and non-technical site characterization and permitting activities (“Phase III”) conducted under the Wyoming CarbonSAFE: Accelerating CCUS Commercialization and Deployment at Dry Fork Power Station (DFS) and the Wyoming Integrated Test Center project (“Wyoming CarbonSAFE”). Wyoming CarbonSAFE is part of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) Carbon Storage Assurance Facility Enterprise (“CarbonSAFE”) Initiative. The results of Phase III demonstrate that the Wyoming CarbonSAFE project - referred to as the Northern Powder River Basin Carbon Sequestration Hub (NPRB-CSH) - meets the technical, regulatory, and commercial feasibility requirements necessary to advance toward commercial development and construction. The activities completed under this project Phase make the NPRB-CSH one of the region’s most commercially ready carbon storage sites. Completion of this Phase included the finalization of all site surface and subsurface characterization activities, completion and testing of two Class VI standard wells, 10 draft Class VI permits-to construct to address the future needs of a storage complex, finalized NEPA assessments, transportation and capture FEED studies, and a full commercialization strategy with economic modeling, operation and site closure strategies. The NPRB-CSH meets all requirements to progress to a CarbonSAFE Phase IV program or advance to full commercial operations under the development of a business partner.

01 COAL, LIGNITE, AND PEAT↗

FORCE Integration with DRAFT and IDAES

Integrated energy systems (IES) combine, in mutually beneficial ways, power from variable renewable energy sources and nuclear power plants (NPP) to produce multiple commodities and improve economic viability under uncertain market conditions. Technical and economic analysis of IES requires modeling of complex processes with software models having enough fidelity to capture real-world dynamics while still being capable of running using reasonable computing resources. The open-source Framework for Optimization of Resources and Economics (FORCE) tool suite, developed at Idaho National Laboratory (INL), has enabled comprehensive modeling and simulation of IES. The capabilities within FORCE include grid portfolio optimization through the Holistic Energy Resource Optimization Network (HERON) and the transient process model analysis library HYBRID, among others. Recent developments for the FORCE toolset have centered on strengthening the flexibility and modularity to link with external models and other available software to enhance IES simulations. Adding versatility to the FORCE toolset improves capability resulting in better techno-economic simulation of nuclear and IES components (both in potential higher fidelity and accuracy to expected performance after deployment). It also helps leverage existing work in the IES field and improve efficiency in national code development. This report focuses on two such endeavors: integration of the Dynamic Reliability Analysis Framework Tool (DRAFT) and the Design Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems (DISPATCHES) software packages into FORCE.

97 MATHEMATICS AND COMPUTING↗

CodeScribe Agent

SF-26-086 CodeScribe introduces a structured, multi-stage pipeline that combines deterministic program analysis with LLM-powered translation to enable incremental, testable Fortran-to-C++ migration. First, `code-scribe index` traverses the project directory tree and produces `scribe.yaml` metadata files recording all modules, subroutines, and functions at each level, giving the LLM accurate structural context instead of a hallucinated codebase model. Second, `code-scribe draft` performs the deterministic portion of translation — converting Fortran types to C++ equivalents, replacing `use` statements with `#include` and `using namespace` directives, and detecting constructs requiring special handling — while embedding`scribe-prompt` annotations that guide the LLM through non-trivial cases such as statement-function-to-lambda conversions and `extern "C"` wrapper generation. Third, `code-scribe translate` applies project-specific TOML-based few-shot prompt templates and submits the composed prompt to a pluggable LLM backend (OpenAI, Anthropic, Argonne ARGO, any OpenAI-compatible endpoint, or local Hugging Face checkpoints), producing a C++ source file, a header, and a Fortran-C++ interface file for each translated routine so the codebase compiles and runs correctly throughout the migration. Beyond translation, CodeScribe includes a tool-using coding agent (`code-scribe agent`) with read, bash, edit, and write capabilities, and a bounded loop mode (`code-scribe loop`) that runs repeated stateless agent sessions over a task file with restricted tool access — enabling sustained, auditable software development workflows for broader scientific computing tasks.

Dhruv, Akash [Argonne National Laboratory (ANL), A↗

High-quality draft genome sequence of Gracilimonas tropica CL-CB462 T (DSM 19535 T ), isolated from a Synechococcus culture

Gracilimonas tropica Choi et al. 2009 is a member of order Sphingobacteriales, class Sphingobacteriia. Three species of the genus Gracilimonas have been isolated from marine seawater or a salt mine and showed extremely halotolerant and mesophilic features, although close relatives are extremely halophilic or thermophilic. The type strain of the type species of Gracilimonas, G. tropica DSM19535 T , was isolated from a Synechococcus culture which was established from the tropical sea-surface water of the Pacific Ocean. The genome of the strain DSM19535 T was sequenced through the Genomic Encyclopedia of Type Strains, Phase I: the one thousand microbial genomes project. Here, we describe the genomic features of the strain. The 3,831,242 bp long draft genome consists of 48 contigs with 3373 protein-coding and 53 RNA genes. Finally, the strain seems to adapt to phosphate limitation and requires amino acids from external environment. In addition, genomic analyses and pasteurization experiment suggested that G. tropica DSM19535 T did not form spore.

59 BASIC BIOLOGICAL SCIENCES↗

Research and Development of Natural Draft Ultra-Low Emissions Burners for Gas Appliances

Combustion systems used in residential and commercial cooking appliances must be robust and easy to use while meeting air quality standards. Current air quality standards for cooking appliances are far greater than other stationary combustion equipment. By developing an advanced low emission combustion system for cooking appliances, the air quality impacts from these devices can be reduced. This project adapted the Lawrence Berkeley National Laboratory (LBNL) Ring-Stabilizer Burner combustion technology for residential and commercial natural gas fired cooking appliances (such as ovens, ranges, and cooktops). LBNL originally developed the Ring-Stabilizer Burner for a NASA funded microgravity experiment. This natural draft combustion technology reduces NOx emissions significantly below current SCAQMD emissions standards without post combustion treatment. Additionally, the Ring-Stabilizer Burner technology does not require the assistance of a blower to achieve an ultra-low emission lean premix flame. The research team evaluated the Ring-Stabilizer Burner and fabricated the most promising designs based on their emissions and turndown.

42 ENGINEERING↗

SpaceCube 2.0: An Advanced Hybrid Onboard Data Processor

The SpaceCube 2.0 is a compact, high performance, low-power onboard processing system that takes advantage of cutting-edge hybrid (CPU/FPGA/DSP) processing elements. The SpaceCube 2.0 design concept includes two commercial Virtex-5 field-programmable gate array (FPGA) parts protected by gradiation hardened by software" technology, and possesses exceptional size, weight, and power characteristics [5x5x7 in., 3.5 lb (approximately equal to 12.7 x 12.7 x 17.8 cm, 1.6 kg) 5-25 W, depending on the application fs required clock rate]. The two Virtex-5 FPGA parts are implemented in a unique back-toback configuration to maximize data transfer and computing performance. Draft computing power specifications for the SpaceCube 2.0 unit include four PowerPC 440s (1100 DMIPS each), 500+ DSP48Es (2x580 GMACS), 100+ LVDS high-speed serial I/Os (1.25 Gbps each), and 2x190 GFLOPS single-precision (65 GFLOPS double-precision) floating point performance. The SpaceCube 2.0 includes PROM memory for CPU boot, health and safety, and basic command and telemetry functionality; RAM memory for program execution; and FLASH/EEPROM memory to store algorithms and application code for the CPU, FPGA, and DSP processing elements. Program execution can be reconfigured in real time and algorithms can be updated, modified, and/or replaced at any point during the mission. Gigabit Ethernet, Spacewire, SATA and highspeed LVDS serial/parallel I/O channels are available for instrument/sensor data ingest, and mission-unique instrument interfaces can be accommodated using a compact PCI (cPCI) expansion card interface. The SpaceCube 2.0 can be utilized in NASA Earth Science, Helio/Astrophysics and Exploration missions, and Department of Defense satellites for onboard data processing. It can also be used in commercial communication and mapping satellites.

Lin, Michael↗

ASME Code Activities

U.S. Nuclear Regulatory Commission (NRC) is currently assessing ASME Section III, Division 5 (2017 Edition) and accompanying Code Cases for endorsement Draft Regulatory Guide (DG-1380) and draft NUREG (2245) on the endorsement of Division 5 were issued and public comment phase completed DG-1380 places conditions in the areas of general requirements, mechanical design, metallic materials allowable stresses, and graphite materials/design of Division 5 DG-1380 is a revision to Regulatory Guide 1.87, Revision 1, 1975 (which endorsed the 159X series of ASME Code Cases, with conditions) NRC staff is currently reviewing the low-temperature and elevated temperature Alloy 617 code cases for endorsement Results of the review will be incorporated into DG-1380 and changes will be announced publicly The formal endorsement of Section III, Division 5 and accompanying code cases, with conditions, will be made through Regulatory Guide 1.87, Revision 2

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An algorithmic approach to predicting mechanical draft cooling tower fan speeds from infrasound signals

Mechanical draft cooling towers (MDCTs) serve a critical heat management role in a variety of industries. For nuclear reactors in particular, the consistent, predictable operation of MDCTs is required to avoid damage to infrastructure and reduce the potential for catastrophic failure. Accurate, reliable measurement of MDCT fan speed is therefore an important maintenance and safety requirement. To that end, we have developed an algorithm for automatically predicting the rotational speeds of multiple, simultaneously operating fan rotors using contactless, infrasound measurements. The algorithm is based on identifying the blade passing frequencies (BPFs), their harmonics, as well as the motor frequencies (MFs) for each fan in operation. Using the algorithm, these frequencies can be automatically identified in the acoustic waveform’s short-time Fourier transform spectrogram. Attribution is aided by a set of filters that rely on the unique spectral and temporal characteristics of fan operation, as well as the intrinsic frequency ratios of the BPF harmonics and the BPF/MF signals. The algorithm was tested against infrasound data acquired from infrasound sensors deployed at two research reactors: the Advanced Test Reactor (ATR) located at Idaho National Laboratory (INL) and the High Flux Isotope Reactor (HFIR) located at Oak Ridge National Laboratory (ORNL). After manually identifying the MDCT gearbox ratio, the algorithm was able to quickly yield fan speeds at both reactors in good agreement with ground truth. Ultimately, this work demonstrates the ease by which MDCT fans may be monitored in order to optimize operational conditions and avoid infrastructure damage.

42 ENGINEERING↗

Mercury Continuous Emmission Monitor Calibration

Mercury continuous emissions monitoring systems (CEMs) are being implemented in over 800 coal-fired power plant stacks throughput the U.S. Western Research Institute (WRI) is working closely with the Electric Power Research Institute (EPRI), the National Institute of Standards and Technology (NIST), and the Environmental Protection Agency (EPA) to facilitate the development of the experimental criteria for a NIST traceability protocol for dynamic elemental mercury vapor calibrators/generators. These devices are used to calibrate mercury CEMs at power plant sites. The Clean Air Mercury Rule (CAMR) which was published in the Federal Register on May 18, 2005 and vacated by a Federal appeals court in early 2008 required that calibration be performed with NIST-traceable standards. Despite the vacature, mercury emissions regulations in the future will require NIST traceable calibration standards, and EPA does not want to interrupt the effort towards developing NIST traceability protocols. The traceability procedures will be defined by EPA. An initial draft traceability protocol was issued by EPA in May 2007 for comment. In August 2007, EPA issued a conceptual interim traceability protocol for elemental mercury calibrators. The protocol is based on the actual analysis of the output of each calibration unit at several concentration levels ranging initially from about 2-40 {micro}g/m{sup 3} elemental mercury, and in the future down to 0.2 {micro}g/m{sup 3}, and this analysis will be directly traceable to analyses by NIST. The EPA traceability protocol document is divided into two separate sections. The first deals with the qualification of calibrator models by the vendors for use in mercury CEM calibration. The second describes the procedure that the vendors must use to certify the calibrators that meet the qualification specifications. The NIST traceable certification is performance based, traceable to analysis using isotope dilution inductively coupled plasma/mass spectrometry (ID/ICP/MS) performed by NIST in Gaithersburg, MD. The outputs of mercury calibrators are compared to one another using a nesting procedure which allows direct comparison of one calibrator with another at specific concentrations and eliminates analyzer variability effects. The qualification portion of the EPA interim traceability protocol requires the vendors to define calibrator performance as affected by variables such as pressure, temperature, line voltage, and shipping. In 2007 WRI developed and conducted a series of simplified qualification experiments to determine actual calibrator performance related to the variables defined in the qualification portion of the interim protocol.

01 COAL, LIGNITE, AND PEAT↗

Summer Final Report

The summer of 2012 has been filled with many memorable events and activities. As an intern, I had responsibilities that had to be fulfilled. My tour of duty was completed as an administrative student trainee in the Information Technology and Communications Services Business Office (IT-A). In accordance with the Business Objectives and Agreement of the Business Office and my performance plan, I was to provide business office support, improve business, project management, and technical work processes. With this being stated, I supported a project called "The Big Move Project" (TBMP), which will take course over the next several years. The Big Move Project is the planning of the Information Technology (IT) Directorate's relocation to various buildings in the course of upcoming years, when designs and the building of Central Campus have been completed. Working directly with my supervisor and the project manager, I was responsible for gathering both administrative and operational area requirements for the Information Technology (IT) Directorate, along with its outsourced support and contractors, such as IMCS, NICS, and ACES. My first action was to create rubrics that will serve as a guideline for the information that should be given by each branch of IT. After receiving that information via a few KAITS actions, I was able to start the consolidation process, and begin working on a presentation. A SharePoint was created shortly after for others to view the progression of the project, which I managed. During the consolidation ofthis information, I would occasionally present to the IT Deputy Director and IT Chiefs. The draft of this presentation was shown to employees of Center Operations (T A) and stakeholders-IT Chief Officers and contractor managers-in the relocation of IT to make them aware of what requirements must be met that will enable IT to be accommodated appropriately in the design of Central Campus Phase 11-the time in which IT and its contractors are scheduled to be relocated. Besides supporting TBMP, I also supported the Section 508 Policy Compliance Coordinator, R. Liang. Section 508 is a policy that requires employers to implement accessibility assurance of information and technology to disabled communities. On Thursday, July 19, 2012, I was able to go to Camp Boggy Creek-a camp for disabled children-for an education outreach, in collaboration with the Education Office. We shared with them information about how astronauts live and work in space, they were able to ride hovercrafts, build paper rockets, and then launch them outside. Although this outreach was quite fun with the kids at the camp, this was a learning opportunity to gain some insight to those with cognitive and physical disabilities, the problems they typically face, and in tum, how to accommodate those with disabilities in the work environment. In the process of implementing accessibility and Section 508 compliance, I attended various teleconferences, did field runs to supply closed-caption call phones to employees with limited hearing, and helped with the development of the charter ofthe Section 508 Compliance Working Group.

Makidi, Nitou↗