Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DSS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Magnetospheric Multiscale (MMS) Mission Attitude Ground System Design

This paper describes the attitude ground system (AGS) design to be used for support of the Magnetospheric MultiScale (MMS) mission. The AGS exists as one component of the mission operations control center. It has responsibility for validating the onboard attitude and accelerometer bias estimates, calibrating the attitude sensors and the spacecraft inertia tensor, and generating a definitive attitude history for use by the science teams. NASA's Goddard Space Flight Center (GSFC) in Greenbelt, Maryland is responsible for developing the MMS spacecraft, for the overall management of the MMS mission, and for mission operations. MMS is scheduled for launch in 2014 for a planned two-year mission. The MMS mission consists of four identical spacecraft flying in a tetrahedral formation in an eccentric Earth orbit. The relatively tight formation, ranging from 10 to 400 km, will provide coordinated observations giving insight into small-scale magnetic field reconnection processes. By varying the size of the tetrahedron and the orbital semi-major axis and eccentricity, and making use of the changing solar phase, this geometry allows for the study of both bow shock and magnetotail plasma physics, including acceleration, reconnection, and turbulence. The mission divides into two phases for science; these phases will have orbit dimensions of l.2xl2 Earth radii in the first phase and l.2x25 Earth radii in the second in order to study the dayside magnetopause and the nightside magnetotail, respectively. The orbital periods are roughly one day and three days for the two mission phases. Each of the four MMS spacecraft will be spin stabilized at 3 revolutions per minute (rpm), with the spin axis oriented near the ecliptic north pole but tipped approximately 2.5 deg towards the Sun line. The main body of each spacecraft will be an eight-sided platform with diameter of 3.4 m and height of 1.2 m. Several booms are attached to this central core: two axial booms of 14.9 m length, two radial magnetometer booms of 5 m length, and four radial -wire booms of 60 m length. Attitude and orbit control will use a set of axial and radial thrusters. A four-head star tracker and a slit-type digital Sun sensor (DSS) provide input for attitude determination. In addition, an accelerometer will be· used for closed-loop orbit maneuver control. The primary AGS product will be a daily definitive attitude history. Due to power limitations; the star tracker and accelerometer data will not be available at all times. However, tracker data from at least 10 percent of each orbit and continuous DSS data will be provided. An extended Kalman filter (EKF) will be used to estimate the three-axis attitude (i.e., spin axis orientation and spin phase) and rotation rate for all times when the tracker data is valid. For other times, the attitude is generated by assuming a constant angular momentum vector in the inertial frame. The DSS sun pulse will provide a timing signal to maintain an accurate spin phase. There will be times when the Sun is occulted and DSS data is not available. If this occurs at the start or end of a definitive attitude product, then the spin phase will be extrapolated using the mean rate determined by the EKF.

Sedlak, Joseph E.↗

An OSI Architecture for the Deep Space Network

The flexibility and robustness of a monitor and control system are a direct result of the underlying inter-processor communications architecture. A new architecture for monitor & control at the Deep Space Network Communications Complexes has been developed based on the Open System Interconnection (OSI) standards. The suitability of OSI standards for DSN M&C has been proven in the laboratory. The laboratory success has resulted in choosing an OSI-based architecture for DSS-13 M&C. DSS-13 is the DSN experimental station and is not part of the "operational" DSN; it's role is to provide an environment to test new communications concepts can be tested and conduct unique science experiments. Therefore, DSS-13 must be robust enough to support operational activities, while also being flexible enough to enable experimentation. This paper describes the M&C architecture developed for DSS-13 and the results from system and operational testing.

OSI↗

Use of the SPoRT Stoplight Product to Support NWS Decision Support Services

The National Weather Service Forecast Offices (NWSFOs) use many weather tools and observational datasets to provide support for critical decision-making by core partners such as public safety officials, emergency managers, and first responders. These core partners who need weather decision support services (DSS) for outdoor events require up-to-the-minute weather information to ensure the safety and protection of attendees and workers. Storms and lightning, potentially deadly, pose a significant threat during outdoor events and are among the weather phenomena frequently cited as a DSS requirement. According to the National Lightning Safety Council, from 2014 up to August 2024, lightning resulted in 222 fatalities in the U.S. For outdoor events with hundreds to thousands of attendees, having the right tools to detect and monitor lightning activity is of utmost importance to protect lives. Common guidelines for lightning safety include moving inside a substantial structure at the first sight of threatening skies or the first sound of thunder, and waiting 30 minutes after the last lightning flash or thunder before returning outside. Using this guidance as a framework, scientists at the NASA Short-term Prediction Research and Transition (SPoRT) center have developed the Geostationary Lightning Mapper (GLM) Stoplight tool. This experimental tool uses the GLM Flash Extent Density imagery to display the location and recency of lightning flashes. To simplify interpretation, these lightning pixels are color-coded in 10-minute bins, ranging from red (lightning detected 0 to 10 minutes ago) to yellow (10 to 20 minutes ago) to green (20 to 30 minutes ago). The Stoplight tool also allows users to place markers at the location of outdoor events with range rings around the location to help in assessing the location and relative age of lightning flashes near and upstream of the event. The goal is to help NWS forecasters provide core partners with the necessary information to make the best decisions possible. While the Stoplight tool is experimental, forecasters at NWSFO Raleigh, NC, have periodically used the Stoplight guidance to evaluate its utility within NWS DSS. This presentation will discuss how the Stoplight tool was successfully used for DSS for four outdoor events in central NC in 2023 and 2024. Future improvements to this tool, including the addition of AI applications and the merging of ground-based lightning data with GLM data, will be reviewed.

Gail Hartfield↗

Measurement of G-phase volume fraction and number density in duplex stainless steels using transmission electron microscopy

Duplex stainless steels (DSS) have a high toughness and strength due the presence of both austenitic and ferritic phases. These alloys have had limited use in power production applications due to thermal embrittlement caused by spinodal decomposition and development of G-phase precipitates in the ferrite. Lean grade DSS alloys (e.g., 2101, 2003) may offer improved thermal stability due to the reduction of Cr- and Ni-equivalent elements when compared to standard grade compositions (e.g., 2205, 2209). The abundance of the G-phase was measured in five duplex stainless steels, three wrought alloys (2101, 2003, 2205) and their matching filler metals (2101-w, 2209-w), after aging at 427 °C for 1000 h and 10,000 h. The G-phase volume fraction, number density, size, and precipitate spacing were found using quantitative analysis of transmission electron microscopy dark field images and the composition of G-phase precipitates on other clusters were characterized with atom probe tomography (APT). In the welded alloys, the G-phase was found to develop rapidly, relative to the wrought material. A positive correlation was found between the nickel equivalent composition of the alloy and the G-phase volume fraction. The alloys 2205, 2209, and 2101-w, which are higher in Cr and Ni, all showed significant G-phase precipitation, further strengthening the hypothesis that lean grade DSS alloys are more thermally stable against precipitation in the ferrite. Electron diffraction showed a secondary phase present in the 2101 wrought alloy at 10,000 h, but it was not crystallographically consistent with the G-phase; APT showed the presence of nanoclusters rich in both nickel and copper for this alloy. In conclusion, no secondary phases or clusters were found in 2003 after 10,000 h of aging, so it may be a candidate alloy for applications that require long-life times at high operating temperatures.

36 MATERIALS SCIENCE↗

Results for the October 2023 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2023 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The October 2023 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the Third Quarter Fiscal Year 2023 (3QFY2023) and the Fourth Quarter Fiscal Year 2023 (4QFY2023).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the April 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The April 2025 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2025 (1QFY2025) and the Second Quarter Fiscal Year 2025 (2QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TAR GETS that were established at the time the SWPF DSS sample was obtained. 1 The October 2025 Semiannual sample of the SWPF DSS is a composite from one month of SWPF processing during the Third Quarter Fiscal Year 2025 (3QFY2025) and two months of SWPF processing during the Fourth Quarter Fiscal Year 2025 (4QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrical Potential Investigation of Reversible Metastability and Irreversible Degradation of CdTe Solar Cells

In this paper, we report on the stability of CdTe devices with a structure of TCO/MZO/CdSeTe/CdTe/back-contact. The device showed reversible transitions between the light-soak state (LSS) with the best device efficiency and the dark-soak state (DSS) with an inferior efficiency. However, it showed an irreversible degradation state (DgS) driven by long-hour light soaking at an elevated temperature. We have investigated transitions between these three states from the perspective of the electric field by nm-resolution potential imaging across the devices using Kelvin probe force microscopy (KPFM). The results exhibit different anomalous electric field profiles. At the LSS, the electric field exhibits a main peak inside the CdSeTe layer instead of the MZO/CdSeTe heterointerface, illustrating a buried homojunction (BHJ) of the device. At the DSS, a large electric field peak at the MZO/CdSeTe interface was measured, which probably resulted in the inferior fill factor at the DSS. At the DgS, the electric field peak at the MZO/CdSeTe interface increased further and a third electric field was measured at the back contact of the device. Device modeling using COMSOL software, in alignment with both the electric field and device current-voltage curves, elucidates that a low n-doped CdSeTe in the region near the MZO/CdSeTe interface caused the BHJ in the LSS and a loss of MZO doping and/or increase of the conduction band offset spike due to long-term stress caused the increased electric field near the MZO/CdSeTe interface at the DgS.

CdTe solar cell↗

IN-SERVICE INSPECTION OF EXTENDED DRY STORAGE OF SPENT NUCLEAR FUEL, PART I: CRAWLER TECHNOLOGY DEVELOPMENT

This paper describes development and demonstration of remote crawling systems to support periodic examinations of interim dry storage system (DSS) canisters for spent nuclear fuel in the USA. Specifically, this work relates to robotic crawler developments for “canister” based DSS systems which form the majority population of DSSs, in the USA, for interim storage of spent nuclear fuel. Consideration of potential degradation of the welded stainless-steel canister in these systems is required for continued usage in the period of extended operation (PEO) beyond their initial licensed or certified terms. Challenges associated with performing the periodic examinations are associated with physical access to the canister surface which is constrained due to narrow annulus spaces between the canister and the overpack, tortuous entry pathways, and high temperatures and radiation doses that can be damaging to materials and electronics. Motivations for performing periodic examinations and developing robotic crawlers for performing those examinations remotely will be presented and several activities to demonstrate robotic crawlers for different DSS systems are summarized.

nondestructive examination (NDE), Dry Cask Storage↗

HFTS-2 Completions Design and State-of-the-Art Diagnostics Results

Various completion schemes were tested as part of the Hydraulic Fracture Test Site-2 (HFTS-2) project. The wells were instrumented with permanent fiber optic (FO) cable, and unique near-wellbore and far-field region surveys were acquired to evaluate spatial and temporal hydraulic fracture characteristics. The state-of-the-art diagnostics included substantial monitoring of both the well stimulation and longer-term production performance. The objective was to evaluate and improve stimulation distribution effectiveness (SDE) for different completion designs based on the diagnostics results. A hydraulic fracturing (HF) profile (i.e., proppant/fluid allocation among clusters) was obtained using near-wellbore Distributed Acoustic Sensing (DAS) data acquired during stimulation. Statistical analysis provided a quantitative assessment of SDE for the different completion designs. A novel workflow was developed to assess time-lapse fracture property changes at the cluster and stage levels based on Distributed Strain Sensing (DSS) data acquired during the production phase. These time-lapse fracture property changes were compared with the HF profile. Based on the statistical analysis, Rate Per Cluster (RPC) during proppant slurry placement appears to be a primary completion design variable, rather than the typical Rate Per Perf (RPP). If RPC was not maintained at a certain level, the likelihood of uneven distribution increased dramatically. The stage configurations that created low RPC while maintaining high RPP did not show improved SDE. The strain change results based on DSS data during the production phase indicated near-wellbore fracture property changes (e.g., aperture changes during well shut-in and flow periods) and aligned well with near-wellbore DAS signals acquired during stimulation. More importantly, fracture property changes based on DSS data acquired during two tests over a 7-month period show high consistency and good alignment with the near-wellbore HF profile. This workflow quantitatively evaluates SDE for different completion designs using diagnostic results and could help optimize completion strategy for future development projects. Here, the analysis and interpretation of results demonstrate the technical feasibility of using permanent fiber optic cable for stimulation and production monitoring and indic

58 GEOSCIENCES↗

HFTS-2 (Final Report)

This report delves into the research program, identified tasks, various studies, observations, results, and conclusions under the Hydraulic Fracturing Test Site (HFTS-2) project. This test site is located in Loving County close to the Texas, New Mexico border. The program targeted the Wolfcamp formation in Delaware Basin. The aim of the project was to improve our understanding of hydraulic fracturing processes to not only optimize unconventional resource development in US Basins but to minimize environmental footprint as well. Various new diagnostic technologies were demonstrated at this site, including distributed acoustic microseismic, high resolution strain using Rayleigh frequency band (DSS-RFS), and in-fill proppant logging tool. Significant conclusions from this study include: 1) lateral and vertical fracture growth mapping as well as proppant transport behavior, 2) Use of DSS-RFS as a diagnostic tool to understand cluster level behavior, 3) Validation of proppant log, both at core scale as well as in-fill well implementation, and 4) New modeling tools to map far-field strain response using distributed strain sensing data. Specifically, far-field fracture distribution is influenced by linear fracture corridors defined by the stress-state as well as clustering behavior influenced by spatio-temporal effects. Depletion impacts on new stimulation was demonstrated and technically quantified. Significant vertical fracture height growth was observed. However, our understanding is limited by available gauge data availability. Numerical strain modeling techniques have been developed and demonstrated to help understand observed strain response behavior. Finally, proppant log has been further validated as a useful tool to map propped zones within the SRV. It has also shown very strong correlation with observed drawdown behavior at this test site. This report will detail many of these studies as well as technical results and conclusions from said studies. These include general subsurface characterization work, completion designs as implemented, studies looking at fracture geometry, high resolution microseismic study including source mechanisms, advanced DSS-RFS studies including drainage characterization, core characterization results, proppant analysis (core and in-fill child well), geochemistry, etc.

02 PETROLEUM↗

An evaluation of prognostic factors, oncologic outcomes, and management for primary and recurrent squamous cell carcinoma of the vulva

Objective: To evaluate prognostic factors, outcomes, and management patterns of patients treated for squamous cell carcinoma of the vulva. Methods: One hundred sixty-four women were retrospectively identified with primary squamous cell carcinoma of the vulva treated at our institution between 1/1996–12/2018. Descriptive statistics were performed on patient, tumor, and treatment characteristics. The χ 2 tests and t-tests were used to compare categorical variables and continuous variables, respectively. Recurrence free survival (RFS), overall survival (OS), and disease-specific survival (DSS) were analyzed with Kaplan-Meier estimates, the log-rank test, and Cox proportional hazards. Results: Median follow-up was 52.5 months. Five-year RFS was 67.9%, 60.0%, 42.1%, and 20.0% for stage I–IV, respectively. Five-year DSS was 86.2%, 81.6%, 65.0%, and 42.9% for stage I–IV, respectively. On multivariate analysis, positive margins predicted overall RFS (hazard ratio [HR]=3.55; 95% confidence interval [CI]=1.18–10.73; p=0.025), while presence of lichen sclerosus on pathology (HR=2.78; 95% CI=1.30–5.91; p=0.008) predicted local RFS. OS was predicted by nodal involvement (HR=2.51; 95% CI=1.02–6.13; p=0.043) and positive margins (HR=5.19; 95% CI=2.03–13.26; p=0.001). Adjuvant radiotherapy significantly improved RFS (p=0.016) and DSS (p=0.012) in node-positive patients. Median survival after treatment of local, groin, and pelvic/distant recurrence was 52, 8, and 5 months, respectively. Conclusion: For primary treatment, more conservative surgical approaches can be considered with escalation of treatment in patients with concurrent precursor lesions, positive margins, and/or nodal involvement. Further studies are warranted to improve risk stratification in order to optimize treatment paradigms for vulvar cancer patients.

60 APPLIED LIFE SCIENCES↗

Tracking and data system support for the Mariner Mars 1971 mission. Prelaunch phase through first trajectory correction maneuver, volume 1

The DSN command system provided the capability to enter commands in a computer at the deep space stations for transmission to the spacecraft. The high-rate telemetry system operated at 16,200 bits/sec. This system will permit return to DSS 14 of full-resolution television pictures from the spacecraft tape recorder, plus the other science experiment data, during the two playback periods of each Goldstone pass planned for each corresponding orbit. Other features included 4800 bits/sec modem high-speed data lines from all deep space stations to Space Flight Operations Facility (SFOF) and the Goddard Space Flight Center, as well as 50,000 bits/sec wideband data lines from DSS 14 to the SFOF, thus providing the capability for data flow of two 16,200 bits/sec high-rate telemetry data streams in real time. The TDS performed prelaunch training and testing and provided support for the Mariner Mars 1971/Mission Operations System training and testing. The facilities of the ETR, DSS 71, and stations of the MSFN provided flight support coverage at launch and during the near-earth phase. The DSSs 12, 14, 41, and 51 of the DSN provided the deep space phase support from 30 May 1971 through 4 June 1971.

Laeser, R. P.↗

DSN research and technology support

The activities of the Venus Station (DSS 13) and the Microwave Test Facility (MTF) during the period April 19 through June 13, 1976, are discussed and progress noted. Continuing reliability testing and computer program refinement of the remote controlled, unattended automated pulsar observing station is noted, along with routine observations of 17 pulsars. Radar observations of a geostationary satellite are reported, along with the routine automatic testing of the stability of the DSS 13 maser-receiving system. Additional testing of thermal characteristics of semiflexible coaxial cables is reported, along with phase stabilization measurements thereon. Routine support of the planetary radio astronomy experiment, with 43.25 hours of observations of Jupiter and various radio calibration sources, is reported, along with 18.75 hours of differential VLBI observations in conjunction with Australia, DSS 43. Modifications of the clock synchronization winterization system are reported, along with a discussion of the activities of the DSN High-Power Transmitter Maintenance Facility.

Jackson, E. B.↗

DSN research and technology support

The ongoing activities at the Venus Station (DSS 13) and the Microwave Test Facility (MTF) discussed include: (1) equipment implementation for unattended operation at DSS 13; (2) salvaging of a 20-kW klystron, at a cost savings of several thousand dollars by the DSN High Power Transmitter Facility; (3) extensive tracking activities with the 26-m antenna including DSN Platform Parameters, Multistation Planetary Radar, Helios II Spectrum Broadening Analysis, VLBI Validation, Planetary Radio Astronomy, and Pulsar Rotation Constancy, for a total time of 219-1/4 observing hours; (4) clock synchronization transmissions from the DSS 13 master clock to the overseas 64-m antenna complexes and special implementation activities in support of PV-78; and (5) implementation of a hydrogen maser frequency standard and the pathfinder installation of a utility control system (UCS) and significant station modification and maintenance.

Jackson, E. B.↗

The 26-meter S-X Conversion Project

The 26-meter S-X conversion project provides for the conversion of an existing 26-meter S-band subnet to a 34-meter S- and X-band subnet. The subnet chosen for conversion consists of the following stations: DSS 12 near Barstow, DSS 44 in Australia, and DSS 62 in Spain. The main subsystems effected by this project are the antenna mechanical, antenna microwave, and receiver-exciter. In addition to these, there are many project-related electronic equipments that have been added to the existing station equipment. The major subsystems are essentially through the design stage with the antenna mechanical subsystem completed through detail design with procurement in process.

Lobb, V. B.↗

A high-speed computer link for moderate distances and noisy environments

To satisfy the need for a fully duplex high-speed computer data link for the antenna automation project at DSS 13, a very simple and inexpensive scheme was employed. The link requires two coaxial cables over which is sent a unipolar digital frequency modulated signal in which a logical 1 has twice the frequency of a logical 0. Optical isolators and filters reduce ground loop effects and increase noise immunity. Tests conducted in various environments and over different cable lengths at JPL, DSS 14 and DSS 13 have indicated that the link is highly effective.

Sievers, M. W.↗

Voyager mission support

Special events participated in by the Deep Space Stations (DSS) for the period of February through April 1980 are presented. The status of the DSS is reviewed for the same period, including system performance tests and operational verification tests. A list of software accepted for operation at the DSS is given.

Fanelli, N.↗