Research Technology Laboratory (RTL) Disposition Program Final Status Survey Report

As part of the Battelle Facility Restoration Program (Smoter and Biebesheimer 2017), the Research Technology Laboratory (RTL) Complex was remediated through demolition and surveyed to show it meets the radiological release criteria for unrestricted use under the clearance process (DOE 2011). The restoration program has directed the implementation of the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) methodology (NRC 2011) to verify the suitability of the site to be released for unrestricted use under the clearance process in U.S. Department of Energy (DOE) Order 458.1 (Biebesheimer 2018a; DOE 2011). The use of MARSSIM is accepted by federal and state agencies, including DOE. This report documents how the MARSSIM process was used to assure any residual radioactivity is within acceptable levels and as low as reasonably achievable. Past land use for the RTL Complex property included agricultural, residential, and industrial activity. The historical site assessment (HSA) (Lindenmeier et al. 2015; Biebesheimer 2018b) identified use of radionuclides in past RTL Complex research and development activities from commissioning in 1966 until it was vacated in 2017. Based on the information provided in the HSA, the RTL Complex was delineated into six survey units. The 520 building footprint, tank vault and 530 building footprint, other building footprints, and pipeline survey units included excavated areas. The paved areas and open areas survey units were unexcavated areas. Survey units were all determined to be Class 3, with low probability of containing residual radioactivity, after demolition of the structures within the RTL Complex. The Research Technology Laboratory (RTL) Disposition Program: Final Status Survey Plan (Bunn et al. 2018) was designed and conducted to provide quantitative data regarding the residual radioactivity present in each survey unit. Authorized radiological release limits were developed and approved by the DOE Office of Science in December 2016 (DOE 2017). Fourteen random sample locations were identified within each survey unit. Forty-four specific judgmental sample locations were selected across the site based on information in the HSA. The number of sample locations within a survey unit ranged from 15 to 28, for a total of 127 random and judgmental sample locations identified across the RTL Complex. Sampling for the final status survey occurred over 12 days between November 11 and December 7, 2018. Laboratory results were independently validated by Analytical Quality Associates prior to evaluation. All of the over 880 residual radioactivity measurements were less than the release limits and action levels established through the RTL Disposition Program. A sum of fractions calculation for each survey unit resulted in values that were less than unity. Based on the results presented in this report, the restoration program recommends that the RTL Complex be released for unrestricted use.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Architectural Survey of the Area 25 Nuclear Rocket Development Station, Nevada National Security Site, Nye County, Nevada (Volume 1 of 3)

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO), and the U.S. Department of Energy Environmental Management Nevada Program (EM NV) plan to implement corrective action activities (under the Federal Facility Agreement and Consent Order, agreed to by the State of Nevada) and demolition of the Engine Maintenance, Assembly, and Disassembly (E-MAD) facility and the Test Cell C Historic District. These are major components of the unrecorded Nuclear Rocket Development Station (NRDS) Historic District, which is eligible for inclusion in the National Register of Historic Places (NRHP, National Register). The NRDS is in Area 25 of the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, in Nye County, Nevada. Demolition and removal of the buildings and accessories constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800.

54 ENVIRONMENTAL SCIENCES↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

ORNL Soils Remediation and Slabs Removal The Bridge from D&D to Redevelopment

The landscape of the Oak Ridge National Laboratory (ORNL) has dramatically changed over the past 2 years with demolition of aging facilities in the Central Campus. Removal of these infrastructure legacies was possible due to an influx of DOE-Environmental Management funding through the American Recovery and Reinvestment Act of 2009 (ARRA). Facility D&D traditionally removes everything down to the building slab, and the Soils and Sediments Program is responsible for slabs, below-grade footers, abandoned waste utilities, and soils contaminated above certain risk levels that must be removed before the site can be considered for redevelopment. , DOE-EM has used a combination of base and ARRA funding to facilitate the clean-up process in ORNL s 2000 Area. Demolition of 13 buildings in the area was funded by the ARRA. Characterization of the remaining slabs, underground pipelines and soils was funded by DOE-EM base funding. Additional ARRA funding was provided for the removal of the slabs, pipelines and contaminated soils. Removal work is in progress and consists of removing and disposing of approximately 10,000 cubic yards (CY) of concrete, 2,500 CY of debris, and 500 CY of contaminated soil. The completion of this work will allow the site to be available for redevelopment and site reuse efforts at ORNL.

Conger, M Malinda↗

Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM - 13120

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will have been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand in hand with its excellent project performance. Through calendar year 2012, UCOR's recordable injury rate was 0.33, and the company has worked close to 4 million hours without a lost work day injury. UCOR's safety record is one of the best in the DOE EM Complex. This performance was due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key approaches included: - Selected and deployed experienced staff in key leadership positions throughout the organization; - Approached 'Transition' as the 'true' beginning of the cleanup project - kicking off a number of project initiatives such as Partnering, PMB development, D and D Plan execution, etc. - Established a project baseline for performance measurement and obtained EVMS certification in record time; - Determined material differences and changed conditions that warranted contract change - then quickly addressed these changes with the DOE client; - Aligned the project and the contract within one year - also done in record time; - Implemented Safety Trained Supervisor and Safety Conscious Work Environment Programs, and kicked off the pursuit of certification under DOE's Voluntary Protection Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Central Plateau Cleanup at DOE's Hanford Site - 12504

The discussion of Hanford's Central Plateau includes significant work in and around the center of the Hanford Site - located about 7 miles from the Columbia River. The Central Plateau is the area to which operations will be shrunk in 2015 when River Corridor cleanup is complete. This work includes retrieval and disposal of buried waste from miles of trenches; the cleanup and closure of massive processing canyons; the clean-out and demolition to 'slab on grade' of the high-hazard Plutonium Finishing Plant; installation of key groundwater treatment facilities to contain and shrink plumes of contaminated groundwater; demolition of all other unneeded facilities; and the completion of decisions about remaining Central Plateau waste sites. A stated goal of EM has been to shrink the footprint of active cleanup to less than 10 square miles by 2020. By the end of FY2011, Hanford will have reduced the active footprint of cleanup by 64 percent exceeding the goal of 49 percent. By 2015, Hanford will reduce the active footprint of cleanup by more than 90 percent. The remaining footprint reduction will occur between 2015 and 2020. The Central Plateau is a 75-square-mile region near the center of the Hanford Site including the area designated in the Hanford Comprehensive Land Use Plan Environmental Impact Statement (DOE 1999) and Record of Decision (64 FR 61615) as the Industrial-Exclusive Area, a rectangular area of about 20 square miles in the center of the Central Plateau. The Industrial-Exclusive Area contains the 200 East and 200 West Areas that have been used primarily for Hanford's nuclear fuel processing and waste management and disposal activities. The Central Plateau also encompasses the 200 Area CERCLA National Priorities List site. The Central Plateau has a large physical inventory of chemical processing and support facilities, tank systems, liquid and solid waste disposal and storage facilities, utility systems, administrative facilities, and groundwater monitoring wells. As a companion to the Hanford Site Cleanup Completion Framework document, DOE issued its draft Central Plateau Cleanup Completion Strategy in September 2009 to provide an outline of DOE's vision for completion of cleanup activities across the Central Plateau. As major elements of the Hanford cleanup along the Columbia River Corridor near completion, DOE believed it appropriate to articulate the agency vision for the remainder of the cleanup mission. The Central Plateau Cleanup Completion Strategy and the Hanford Site Cleanup Completion Framework were provided to the regulatory community, the Tribal Nations, political leaders, the public, and Hanford stakeholders to promote dialogue on Hanford's future. The Central Plateau Cleanup Completion Strategy describes DOE's vision for completion of Central Plateau cleanup and outlines the decisions needed to achieve the vision. The Central Plateau strategy involves steps to: (1) contain and remediate contaminated groundwater, (2) implement a geographic cleanup approach that guides remedy selection from a plateau-wide perspective, (3) evaluate and deploy viable treatment methods for deep vadose contamination to provide long-term protection of the groundwater, and (4) conduct essential waste management operations in coordination with cleanup actions. The strategy will also help optimize Central Plateau readiness to use funding when it is available upon completion of River Corridor cleanup projects. One aspect of the Central Plateau strategy is to put in place the process to identify the final footprint for permanent waste management and containment of residual contamination within the 20-square-mile Industrial-Exclusive Area. The final footprint identified for permanent waste management and containment of residual contamination should be as small as practical and remain under federal ownership and control for as long as a potential hazard exists. Outside the final footprint, the remainder of the Central Plateau will be available for other uses consistent with the Hanford Comprehensive Land-Use Plan (DOE 1999), while maintained under federal ownership and control. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification of Pre-existing Containers According to the Acceptance Criteria of the Repository Konrad - 17204

As well as working in the field of waste management, Kerntechnische Entsorgung Karlsruhe GmbH (KBE) is, for historical reasons, one of Germany's three constructors of repository containers for the repository Konrad. The focus of this container production is merely on the side of requalification of the existing legacy containers, which are partly already loaded and grouted. To a smaller extend, KTE also produces new containers for its own use because the containers exactly match the waste properties present on the Karlsruhe site. There are three major container types in the process of requalification: - The Type-IV-Drum-Steel-Container FSC-IV-D was successfully licensed in 2014 and regularly produced thereafter. At the same time, the pre-existing containers of this type are re-qualified on the basis of this license by proof of the compliance with this license. - The Type-IV-Product-Container PSC-I-D is identical to the FSC-VI-D in terms of steel construction but also contains a liner of concrete for shielding and protection of the steel construction. This container is designed for large components and demolition waste. After a successful drop test, it is currently in the advanced process of licensing. - Type I cylindrical concrete containers are simple single drum shieldings which were produced in large numbers in the 1970's and 1980's. KTE owns 7,000 of those containers, thus making requalification and licensing cheaper than retreatment of the waste after demolition of the containers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium and Beryllium Decontamination and Decommissioning in a Developed Neighborhood - 17494

In September 2008, the United States Environmental Protection Agency (EPA), Region 1, issued an Administrative Order by Consent (AOC) that required the completion of a Non-Time-Critical Removal Action for the Nuclear Metals, Inc. Site (Site), which is located in Concord, Massachusetts. The AOC required decontamination and demolition of the site buildings and structures. The Site was originally used for radiological research and production, and included foundry equipment for melting metals, extrusion presses and metal working equipment, pickling and etching tanks, and electroplating equipment. In the 1970's, Nuclear Metals, Inc. developed a large scale depleted uranium manufacturing, operation, which included the manufacturing of penetrators, or bullets, from depleted uranium (DU) as a defense contractor for the U.S. Army. Later operations included production of beryllium alloy materials. The Site included a two-story, five-section interconnected building, a tank house, a hydrogen peroxide tank house, two gas cylinder storage huts, and four 'Butler' metal storage buildings, which had a combined footprint of approximately 17,000 square meters (185,000 square feet). The buildings were principally contaminated with DU and beryllium dust, along with asbestos, PCBs, lead and other constituents. The required removal action at the Site consisted of building stabilization activities to remove flammable materials, install temporary utilities and control dust to create a safe work environment within the buildings for site workers; removal of hazardous materials; demolition of all structures and equipment; and off-site disposal of waste materials. The Decontamination and Decommissioning (D and D) activities and highlights of some of the public involvement work required to complete building D and D work in a residential community are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Liquid Waste Cell Decommissioning at the West Valley Demonstration Project - 16454

CH2M HILL BWXT West Valley, LLC (CHBWV) began decontamination and deactivation activities in the Liquid Waste Cell in the Main Plant Process Building (MPPB) at the West Valley Demonstration Project (WVDP) in 2013. The work is being done under CHBWV's Phase 1 Facility Disposition Contract with the U.S. Department of Energy, and is a prerequisite for demolition of the 3,716 square meter (40,000 square foot) MPPB, which is planned to begin in 2018. At the start of deactivation activities, the Liquid Waste Cell contained nine large contaminated vessels and approximately 1,220 meters (4,000 linear feet) of piping. Due to high levels of contamination and high radiation dose rates, frequent or prolonged manned entries into the cell were undesirable. CHBWV's strategy for preparing the cell for building demolition was based on conducting dose reduction and contamination stabilization activities using remotely deployed long-reach tools where possible, supported by manned entries where situations warrant or conditions were favorable. This paper discusses the conditions, challenges, decontamination approach, specialized tooling and expected end result of the Liquid Waste Cell deactivation project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Cleanup at the Y-12 Nuclear Security Complex - 18304

The Y-12 National Security Complex (Y-12) is one of the nation's most important national security assets. The facility played a key role in producing the world's first atomic bomb during the Manhattan Project and since World War II has been a vital contributor to America's nuclear deterrent capability. Historically, mercury was used extensively in operations at Y-12 in connection with production of components for nuclear weapons. During peak usage - from 1950 to 1963 - approximately 11 million kilograms of mercury were used. Over the years, large quantities of mercury - as much as 330,000 kilograms -- were lost within buildings and to soil and surface water. Today, mercury is considered the greatest environmental risk on the Oak Ridge Reservation and mercury cleanup is a high priority for the Department of Energy's Oak Ridge Office of Environmental Management (OREM). Remediation of Y-12 and East Fork Poplar Creek (EFPC) to mitigate the mercury risk is based on a phased, adaptive management approach. The approach to address surface water includes treatment actions in the short term and research and technology development to evaluate longer-term solutions in the downstream environment. A number of formidable challenges must be addressed in order to assure safe, effective cleanup of mercury contamination at Y-12 and in EFPC. In the long term, understanding how mercury moves in the EFPC system is essential to the development of new technologies and remedial options and strategies for mercury contamination in the creek. OREM has developed and is currently executing a Mercury Technology Development Plan to address these long term needs. As a major component of the short term actions, UCOR has completed the design of the Outfall 200 Mercury Treatment Facility. Outfall 200 is the point at which the west end Y-12 storm drain system discharges to Upper East Fork Poplar Creek (UEFPC). Outfall 200 is consistently the largest single source of mercury to UEFPC. Construction and operation of this facility is critical to reduce mercury in UEFPC, and operation of this facility will be required before demolition of mercury contaminated facilities can begin. Once operational, the Mercury Treatment Facility will have a treatment capacity of 3,000 gallons per minute (gpm), a storm water capture rate of 40,000 gpm, and two million gallons of storm water storage capacity. The headworks with transfer pipeline is designed to capture flow from Outfall 200 and move it to the treatment facility. A contract for construction of the Outfall 200 Mercury Treatment Facility is expected to be awarded in 2018. Early site preparation began in 2017. The early site preparation scope includes utilities relocation, small structure demolition and creek bank secant wall installation. Initial operation of the Mercury Treatment Facility is planned for 2022. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3-D Radiological Data Acquisition, Visualization and Modeling - 20211

The U.S. Army Corps of Engineers (USACE) was tasked to investigate and remediate low activity radiological contamination from research and production of the nation's first nuclear weapons at the former DuPont Chambers Works Formerly Utilized Sites Remedial Action Program (FUSRAP) site (DuPont). The DuPont site had several buildings used for the Manhattan project that were demolished in the 1940's and 1950's apparently using heavy earthmoving equipment. Some of the contaminated rubble from the demolition appears to have been spread out by this equipment resulting in somewhat random scattering of radiologically contaminated soil and debris along with aqueous spills. Traditional investigative methods such as soil borings, test pits and 2-dimensional gamma walkovers were only partially successful in delineating the radiological contamination at the site. It was feared that even 'chasing' the contamination during remediation would miss contamination if the demolition resulted in discontinuous trails of radiologically contaminated soils. In evaluating the data generated over the interceding decades, the USACE determined that a better method to collect and process the remedial action radiological data was needed to enable the project team to optimize predictive planning and meet documentation expectations. The purpose of this paper is to provide an overview of the effort and progress to combine and organize radiological survey methods into a highly flexible sampling, modeling, and decision analysis approach that emphasizes the quality of decision-making during remediation. This innovative system blends multiple tools to develop a methodology that can extend MARRSIM [1] into the subsurface and provide tools that can be applied to other sites. (authors)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Session 077 - Panel: Wednesday US DOE Featured Site: Lexington, KY Office (Portsmouth and Paducah Sites) (R1.14)

This panel featured the DoE's Portsmouth Paducah Project Office (PPPO), which is responsible for the management and cleanup of at the Portsmouth, Ohio and Paducah, Kentucky former Gaseous Diffusion Plant sites. Portsmouth is primed for the first major skyline change at the site the upcoming demolition of the X-326 process building and initial operations of the Onsite Waste Disposal Facility. The Paducah site is working on the C-400 city block initiative allowing DOE to tackle the main source of groundwater contamination at the site, in conjunction with deactivation and demolition of the C-400 Cleaning Building. PPPO's DUF6 conversion plants have 7 lines in continuous operation at both sites providing the opportunity to ramp up cylinder processing. Panelists with presentations: DOE PPO Update (Robert Edwards, Joel Bradburne); Portsmouth/Paducah Project Office (PPPO) (Joel Bradburne, Robert Edwards); PADUCAH (Jennifer Woodard, Myrna Espinosa Redfield); Depleted Uranium Hexafluoride Conversion Project (Reinhard Knerr, Zack Smith); Paducah Deactivation and Remediation Project (Myrna Espinosa Redfield); Mid-America Conversion Services - Seven Lines One Project (Zack Smith)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Is there a Perfect D and D Plan - 20100

Problems with many Deactivation and Demolition (D and D) projects arise not necessarily from the technical difficulty of the actions required in a given facility, but rather from lack of integration of the stove piped planning efforts; engineering, operations, environmental, radiological, human resources, etc. This paper will cover Polestar Technical Service, Inc. (Polestar) systems engineering approach to D and D planning based on the company's experience over the past 27 years. This systematic, four-pronged approach to planning is applicable to any D and D project and addresses several diverse topics in a cohesive and integrated manner. The four areas to be discussed are project scope, requirements, facility end state, work force and base operations. This approach progresses a facility through the typical DOE life-cycle from operations, through deactivation, into surveillance and maintenance (S and M) and to eventual demolition and site remediation. To achieve a final end state the approach brings together the efforts associated with identifying and managing the right set of requirements, detailing the scope of work, establishing the baseline, redefining the work processes, aligning the workforce resources with the work processes, and maintaining the base operations activities as the project progresses through the various life-cycle stages. Getting these building blocks right provides a solid framework for executing any D and D project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BRE‐X Emissions Database for End‐of‐Life Scenarios of Selective Building Construction Materials to Enable Circular Economy in Construction

In the United States, construction and demolition debris predominately end up in landfills with minimal end‐of‐life Re‐X (recover, recycle, reuse, etc.) scenarios, resulting in large environmental impacts and lost opportunities for material recovery. Except for concrete and metals, which seem to have a few well‐defined end‐of‐life pathways, there seems to be a lack of well‐documented end‐of‐life scenarios for other construction materials, let alone their emissions data. Hence, there is a need for documented end‐of‐life Re‐X scenarios and end‐of‐life data of more building materials to motivate widespread use of Re‐X strategies in building design. This paper outlines the efforts of the National Renewable Energy Laboratory, Carbon Leadership Forum, Building Transparency, and Skidmore, Owings & Merrill to (a) create an open‐access BRE‐X (Building Re‐X) end‐of‐life emissions database consisting of greenhouse gas emissions data associated with various end‐of‐life scenarios for a select list of high‐impact building construction materials, and (b) integrate the BRE‐X end‐of‐life emissions database with CAD/BIM/LCA tools for evaluating various end‐of‐life scenarios. The paper also presents a few existing life cycle inventory databases that contain sparse amounts of end‐of‐life data for a few construction materials and their limitations in terms of scaling and data consolidation. Finally, a sample of how the collected data can be ingested into whole‐building LCA tools using open data formats and a public access link to the BRE‐X end‐of‐life emissions database is also included.

36 MATERIALS SCIENCE↗

Life cycle assessment of base-load heat sources for district heating system options

Purpose There has been an increased interest in utilizing renewable energy sources in district heating systems. District heating systems are centralized systems that provide heat for residential and commercial buildings in a community. While various renewable and conventional energy sources can be used in such systems, many stakeholders are interested in choosing the feasible option with the least environmental impacts. This paper evaluates and compares environmental burdens of alternative energy source options for the base load of a district heating center in Vancouver, British Columbia (BC) using the life cycle assessment method. The considered energy sources include natural gas, wood pellet, sewer heat, and ground heat. Methods The life cycle stages considered in the LCA model cover all stages from fuel production, fuel transmission/transportation, construction, operation, and finally demolition of the district heating system. The impact categories were analyzed based on the IMPACT 2002+ method. Results and discussion On a life-cycle basis, the global warming effect of renewable energy options were at least 200 kgeqCO2 less than that of the natural gas option per MWh of heat produced by the base load system. It was concluded that less than 25% of the upstream global warming impact associated with the wood pellet energy source option was due to transportation activities and about 50% of that was resulted from wood pellet production processes. In comparison with other energy options, the wood pellets option has higher impacts on respiratory of inorganics, terrestrial ecotoxicity, acidification, and nutrification categories. Among renewable options, the global warming impact of heat pump options in the studied case in Vancouver, BC, were lower than the wood pellet option due to BC's low carbon electricity generation profile. Ozone layer depletion and mineral extraction were the highest for the heat pump options due to extensive construction required for these options. Conclusions Natural gas utilization as the primary heat source for district heat production implies environmental complications beyond just the global warming impacts. Diffusing renewable energy sources for generating the base load district heat would reduce human toxicity, ecosystem quality degradation, global warming, and resource depletion compared to the case of natural gas. Reducing fossil fuel dependency in various stages of wood pellet production can remarkably reduce the upstream global warming impact of using wood pellets for district heat generation.

03 NATURAL GAS↗

Microscopic characterization of alkali-silica reaction (ASR) affected recycled concrete mixtures induced by reactive coarse and fine aggregates

Alkali-silica reaction (ASR) is one of the most detrimental distress mechanisms leading to early deterioration of concrete infrastructure, creating large amounts of construction and demolition waste which however can be transformed into recycled concrete aggregates (RCA). Yet, as ASR is an ongoing distress mechanism, its potential of reoccurrence in RCA could cause adverse effects. Investigation of the crack propagation of RCA concrete revealed that the distress features vary widely thus, indicating different distress mechanisms in all RCA concrete. Concrete made of slightly damaged RCA shows the lease number of cracks yet, wider cracks at high expansion levels. Additionally, the distress in slightly damaged RCA concrete made of reactive coarse aggregate and RCA concrete made of reactive sand, regardless of original damage extent, is governed by cracks propagating through the residual cement paste whereas cracks propagate through the new cement paste in severely damaged RCA made of reactive coarse aggregate.

36 MATERIALS SCIENCE↗

Use of wastes derived from earthquakes for the production of concrete masonry partition wall blocks

Highlights: > Solved the scientific and technological challenges impeding use of waste rubble derived from earthquake, by providing an alternative solution of recycling the waste in moulded concrete block products. > Significant requirements for optimum integration on the utilization of the waste aggregates in the production of concrete blocks are investigated. > A thorough understanding of the mechanical properties of concrete blocks made with waste derived from earthquake is reported. - Abstract: Utilization of construction and demolition (C and D) wastes as recycled aggregates in the production of concrete and concrete products have attracted much attention in recent years. However, the presence of large quantities of crushed clay brick in some the C and D waste streams (e.g. waste derived collapsed masonry buildings after an earthquake) renders the recycled aggregates unsuitable for high grade use. One possibility is to make use of the low grade recycled aggregates for concrete block production. In this paper, we report the results of a comprehensive study to assess the feasibility of using crushed clay brick as coarse and fine aggregates in concrete masonry block production. The effects of the content of crushed coarse and fine clay brick aggregates (CBA) on the mechanical properties of non-structural concrete block were quantified. From the experimental test results, it was observed that incorporating the crushed clay brick aggregates had a significant influence on the properties of blocks. The hardened density and drying shrinkage of the block specimens decreased with an increase in CBA content. The use of CBA increased the water absorption of block specimens. The results suggested that the amount of crushed clay brick to be used in concrete masonry blocks should be controlled at less than 25% (coarse aggregate) and within 50-75% for fine aggregates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methodology for quantification of waste generated in Spanish railway construction works

Highlights: Black-Right-Pointing-Pointer Two equations for C and D waste estimation in railway construction works are developed. Black-Right-Pointing-Pointer Mixed C and D waste is the most generated category during railway construction works. Black-Right-Pointing-Pointer Tunnel construction is essential to quantify the waste generated during the works. Black-Right-Pointing-Pointer There is a relationship between C and D waste generated and railway functional units. Black-Right-Pointing-Pointer The methodology proposed can be used to obtain new constants for other areas. - Abstract: In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C and D) waste. Specifically, in 2006, Spain generated roughly 47 million tons of C and D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C and D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C and D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects. Therefore, the aim of this research study is to improve C and D waste management in railway projects, by developing a model for C and D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C and D waste likely to be generated in railway construction projects, including the category of C and D waste generated for the entire project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗