Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Robotic Specialization in Autonomous Robotic Structural Assembly

Robotic in-space assembly of large space structures is a long-term NASA goal to reduce launch costs and enable larger scale missions. Recently, researchers have proposed using discrete lattice building blocks and co-designed robots to build high-performance, scalable primary structure for various on-orbit and surface applications. These robots would locomote on the lattice and work in teams to build and reconfigure building-blocks into functional structure. However, the most reliable and efficient robotic system architecture, characterized by the number of different robotic 'species' and the allocation of functionality between species, is an open question. To address this problem, we decompose the robotic building-block assembly task into functional primitives and, in simulation, study the performance of the the variety of possible resulting architectures. For a set consisting of five process types (move self, move block, move friend, align bock, fasten block), we describe a method of feature space exploration and ranking based on energy and reliability cost functions. The solution space is enumerated, filtered for unique solutions, and evaluated against energy and reliability cost functions for various simulated build sizes. We find that a 2 species system, dividing the five mentioned process types between one unit cell transport robot and one fastening robot, results in the lowest energy cost system, at some cost to reliability. This system enables fastening functionality to occupy the build front while reducing the need for that functional mass to travel back and forth from a feed station. Because the details of a robot design affect the weighting and final allocation of functionality, a sensitivity analysis was conducted to evaluate the effect of changing mass allocations on architecture performance. Future systems with additional functionalities such as repair, inspection, and others may use this process to analyze and determine alternative robot architectures.

Bernus, Borbala↗

Technology Candidates for Air-to-Air and Air-to-Ground Data Exchange

Technology Candidates for Air-to-Air and Air-to-Ground Data Exchange is a two-year research effort to visualize the U. S. aviation industry at a point 50 years in the future, and to define potential communication solutions to meet those future data exchange needs. The research team, led by XCELAR, was tasked with identifying future National Airspace System (NAS) scenarios, determining requirements and functions (including gaps), investigating technical and business issues for air, ground, & air-to-ground interactions, and reporting on the results. The project was conducted under technical direction from NASA and in collaboration with XCELAR's partner, National Institute of Aerospace, and NASA technical representatives. Parallel efforts were initiated to define the information exchange functional needs of the future NAS, and specific communication link technologies to potentially serve those needs. Those efforts converged with the mapping of each identified future NAS function to potential enabling communication solutions; those solutions were then compared with, and ranked relative to, each other on a technical basis in a structured analysis process. The technical solutions emerging from that process were then assessed from a business case perspective to determine their viability from a real-world adoption and deployment standpoint. The results of that analysis produced a proposed set of future solutions and most promising candidate technologies. Gap analyses were conducted at two points in the process, the first examining technical factors, and the second as part of the business case analysis. In each case, no gaps or unmet needs were identified in applying the solutions evaluated to the requirements identified. The future communication solutions identified in the research comprise both specific link technologies and two enabling technologies that apply to most or all specific links. As a result, the research resulted in a new analysis approach, viewing the underlying architecture of ground-air and air-air communications as a whole, rather than as simple "link to function" paired solutions. For the business case analysis, a number of "reference architectures" were developed for both the future technologies and the current systems, based on three typical configurations of current aircraft. Current and future costs were assigned, and various comparisons made between the current and future architectures. In general, it was assumed that if a future architecture offers lower cost than the current typical architecture, while delivering equivalent or better performance, it is likely that the future solution will gain industry acceptance. Conversely, future architectures presenting higher costs than their current counterparts must present a compelling benefit case in other areas or risk a lack of industry acceptance. The business case analysis consistently indicated lower costs for the proposed future architectures, and in most cases, significantly so. The proposed future solutions were found to offer significantly greater functionality, flexibility, and growth potential over time, at lower cost, than current systems. This was true for overall, fleet-wide equipage for domestic and oceanic air carriers, as well as for single, General Aviation (GA) aircraft. The overall research results indicate that all identified requirements can be met by the proposed solutions with significant capacity for future growth. Results also illustrate that the majority of the future communication needs can be met using currently allocated aviation RF spectrum, if used in more effective ways than it is today. A combination of such optimized aviation-specific links and commercial communication systems meets all identified needs for the 50-year future and beyond, with the caveat that a new, overall function will be needed to manage all information exchange, individual links, security, cost, and other factors. This function was labeled "Delivery Manager" (DM) within this research. DM employs a distributed client/server architecture, for both airborne and ground communications architectures. Final research results included identifying the most promising candidate technologies for the future system, conclusions and recommendations, and identifying areas where further research should be considered.

Communications↗

Bantam System Technology Project

This report focuses on determining a best value, low risk, low cost and highly reliable Data and Command System for support of the launch of low cost vehicles which are to carry small payloads into low earth orbit. The ground-based DCS is considered as a component of the overall ground and flight support system which includes the DCS, flight computer, mission planning system and simulator. Interfaces between the DCS and these other component systems are considered. Consideration is also given to the operational aspects of the mission and of the DCS selected. This project involved: defining requirements, defining an efficient operations concept, defining a DCS architecture which satisfies the requirements and concept, conducting a market survey of commercial and government off-the-shelf DCS candidate systems and rating the candidate systems against the requirements/concept. The primary conclusions are that several low cost, off-the-shelf DCS solutions exist and these can be employed to provide for very low cost operations and low recurring maintenance cost. The primary recommendation is that the DCS design/specification should be integrated within the ground and flight support system design as early as possible to ensure ease of interoperability and efficient allocation of automation functions among the component systems.

Moon, J. M.↗

On Proper Selection of Multihop Relays for Future Enhancement of AeroMACS Networks

As the Aeronautical Mobile Airport Communications System (AeroMACS) has evolved from a technology concept to a deployed communications network over major US airports, it is now time to contemplate whether the existing capacity of AeroMACS is sufficient to meet the demands set forth by all fixed and mobile applications over the airport surface given the AeroMACS constraints regarding bandwidth and transmit power. The underlying idea in this article is to present IEEE 802.16j-based WiMAX as a technology that can address future capacity enhancements and therefore is most feasible for AeroMACS applications. The principal argument in favor IEEE 802.16j technology is the flexible and cost effective extension of radio coverage that is afforded by relay fortified networks, with virtually no increase in the power requirements and virtually no rise in interference levels to co-allocated applications. The IEEE 802.16j-based multihop relay systems are briefly described. The focus is on key features of this technology, frame structure, and its architecture. Next, AeroMACS is described as a WiMAX-based wireless network. The two major relay modes supported by IEEE 802.16j amendment, i.e., transparent and non-transparent are described. The benefits of employing multihop relays are listed. Some key challenges related to incorporating relays into AeroMACS networks are discussed. The selection of relay type in a broadband wireless network affects a number of network parameters such as latency, signal overhead, PHY (Scalable Physical Layer) and MAC (Media Access Layer) layer protocols, consequently it can alter key network quantities of throughput and QoS (Quality of Service).

aircraft communications↗

Application of Core Theory to the Airline Industry

Competition in the airline industry has been fierce since the industry was deregulated in 1978. The proponents of deregulation believed that more competition would improve efficiency and reduce prices and bring overall benefits to the consumer. In this paper, a case is made based on core theory that under certain demand and cost conditions more competition can actually lead to harmful consequences for industries like the airline industry or cause an empty core problem. Practices like monopolies, cartels, price discrimination, which is considered inefficient allocation of resources in many other industries, can actually be beneficial in the case of the airline industry in bringing about an efficient equilibrium.

Raghavan, Sunder↗

Mars geoscience/climatology orbiter low cost mission operations

It will not be possible to support the multiple planetary missions of the magnitude and order of previous missions on the basis of foreseeable NASA funding. It is, therefore, necessary to seek innovative means for accomplishing the goals of planetary exploration with modestly allocated resources. In this connection, a Core Program set of planetary exploration missions has been recommended. Attention is given to a Mission Operations design overview which is based on the Mars Geoscience/Climatology Orbiter Phase-A study performed during spring of 1983.

Erickson, K. D.↗

Developing Ultra Reliable Life Support for the Moon and Mars

Recycling life support systems can achieve ultra reliability by using spares to replace failed components. The added mass for spares is approximately equal to the original system mass, provided the original system reliability is not very low. Acceptable reliability can be achieved for the space shuttle and space station by preventive maintenance and by replacing failed units, However, this maintenance and repair depends on a logistics supply chain that provides the needed spares. The Mars mission must take all the needed spares at launch. The Mars mission also must achieve ultra reliability, a very low failure rate per hour, since it requires years rather than weeks and cannot be cut short if a failure occurs. Also, the Mars mission has a much higher mass launch cost per kilogram than shuttle or station. Achieving ultra reliable space life support with acceptable mass will require a well-planned and extensive development effort. Analysis must define the reliability requirement and allocate it to subsystems and components. Technologies, components, and materials must be designed and selected for high reliability. Extensive testing is needed to ascertain very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The systems must be designed, produced, integrated, and tested without impairing system reliability. Maintenance and failed unit replacement should not introduce any additional probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass must start soon if it is to produce timely results for the moon and Mars.

Jones, Harry W.↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Simulation Of Research And Development Projects

Measures of preference for alternative project plans calculated. Simulation of Research and Development Projects (SIMRAND) program aids in optimal allocation of research and development resources needed to achieve project goals. Models system subsets or project tasks as various network paths to final goal. Each path described in terms of such task variables as cost per hour, cost per unit, and availability of resources. Uncertainty incorporated by treating task variables as probabilistic random variables. Written in Microsoft FORTRAN 77.

Miles, Ralph F.↗

Fast Near-Optimal Heterogeneous Task Allocation via Flow Decomposition

Multi-robot systems are uniquely well-suited to perform complex tasks such as patrolling and tracking, infor- mation gathering, and pick-up and delivery problems, offering significantly higher performance than single-robot systems. A fundamental building block in most multi-robot systems is dynamic task allocation: assigning robots to tasks (e.g., patrolling an area, or servicing a transportation request) as they appear based on the robots’ states to maximize reward. In many practical situations, the allocation must account for potentially heteroge- neous capabilities (e.g., availability of appropriate sensors or actuators) to ensure the feasibility of execution, and exploit predictive information concerning the likelihood of future tasks to promote a higher reward over a long time horizon. To this end, we present an efficient algorithm for predictive heterogeneous task- allocation achieving an approximation factor of at least 1/2 of the optimal reward. Our approach demonstrates that the problem can be decomposed into several homogeneous subproblems that can be solved efficiently using min-cost flow. Through simulation experiments, we show that our algorithm is faster by several orders of magnitude than a MILP-based approach.

Pavone, Marco↗

Ultra Reliable Closed Loop Life Support for Long Space Missions

Spacecraft human life support systems can achieve ultra reliability by providing sufficient spares to replace all failed components. The additional mass of spares for ultra reliability is approximately equal to the original system mass, provided that the original system reliability is not too low. Acceptable reliability can be achieved for the Space Shuttle and Space Station by preventive maintenance and by replacing failed units. However, on-demand maintenance and repair requires a logistics supply chain in place to provide the needed spares. In contrast, a Mars or other long space mission must take along all the needed spares, since resupply is not possible. Long missions must achieve ultra reliability, a very low failure rate per hour, since they will take years rather than weeks and cannot be cut short if a failure occurs. Also, distant missions have a much higher mass launch cost per kilogram than near-Earth missions. Achieving ultra reliable spacecraft life support systems with acceptable mass will require a well-planned and extensive development effort. Analysis must determine the reliability requirement and allocate it to subsystems and components. Ultra reliability requires reducing the intrinsic failure causes, providing spares to replace failed components and having "graceful" failure modes. Technologies, components, and materials must be selected and designed for high reliability. Long duration testing is needed to confirm very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The system must be designed, developed, integrated, and tested with system reliability in mind. Maintenance and reparability of failed units must not add to the probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass should start soon since it must be a long term effort.

Jones, Harry W.↗

Innovative Networking Concepts Tested on the Advanced Communications Technology Satellite

This paper describes a program of experiments conducted over the advanced communications technology satellite (ACTS) and the associated TI-VSAT (very small aperture terminal). The experiments were motivated by the commercial potential of low-cost receive only satellite terminals that can operate in a hybrid network environment, and by the desire to demonstrate frame relay technology over satellite networks. The first experiment tested highly adaptive methods of satellite bandwidth allocation in an integrated voice-data service environment. The second involved comparison of forward error correction (FEC) and automatic repeat request (ARQ) methods of error control for satellite communication with emphasis on the advantage that a hybrid architecture provides, especially in the case of multicasts. Finally, the third experiment demonstrated hybrid access to databases and compared the performance of internetworking protocols for interconnecting local area networks (LANs) via satellite. A custom unit termed frame relay access switch (FRACS) was developed by COMSAT Laboratories for these experiments; the preparation and conduct of these experiments involved a total of 20 people from the University of Maryland, the University of Colorado and COMSAT Laboratories, from late 1992 until 1995.

Friedman, Daniel↗

Planetary Balloon-Based Science Platform Evaluation and Program Implementation

This report describes a study evaluating the potential for a balloon-based optical telescope as a planetary science asset to achieve decadal class science. The study considered potential science achievable and science traceability relative to the most recent planetary science decadal survey, potential platform features, and demonstration flights in the evaluation process. Science Potential and Benefits: This study confirms the cost the-benefit value for planetary science purposes. Forty-four (44) important questions of the decadal survey are at least partially addressable through balloon based capabilities. Planetary science through balloon observations can provide significant science through observations in the 300 nm to 5 m range and at longer wavelengths as well. Additionally, balloon missions have demonstrated the ability to progress from concept to observation to publication much faster than a space mission increasing the speed of science return. Planetary science from a balloon-borne platform is a relatively low-cost approach to new science measurements. This is particularly relevant within a cost-constrained planetary science budget. Repeated flights further reduce the cost of the per unit science data. Such flights offer observing time at a very competitive cost. Another advantage for planetary scientists is that a dedicated asset could provide significant new viewing opportunities not possible from the ground and allow unprecedented access to observations that cannot be realized with the time allocation pressures faced by current observing assets. In addition, flight systems that have a relatively short life cycle and where hardware is generally recovered, are excellent opportunities to train early career scientists, engineers, and project managers. The fact that balloon-borne payloads, unlike space missions, are generally recovered offers an excellent tool to test and mature instruments and other space craft systems. Desired Gondola Features: Potential gondola characteristics are assessed in this study and a concept is recommended, the Gondola for High-Altitude Planetary Science (GHAPS). This first generation platform is designed around a 1 m or larger aperture, narrow-field telescope with pointing accuracies better than one arc-second. A classical Cassegrain, or variant like Ritchey-Chretien, telescope is recommended for the primary telescope. The gondola should be designed for multiple flights so it must be robust and readily processed at recovery. It must be light-weighted to the extent possible to allow for long-duration flights on super-pressure balloons. Demonstration Flights: Recent demonstration flights achieved several significant accomplishments that can feed forward to a GHAPS gondola project. Science results included the first ever Earth-based measurements for CO2 in a comet, first measurements for CO2 and H2O in an Oort cloud comet, and the first measurement of 1 Ceres at 2.73 m to refine the shape of the infrared water absorption feature. The performance of the Fine Steering Mirror (FSM) was also demonstrated. The BOPPS platform can continue to be leveraged on future flights even as GHAPS is being developed. The study affirms the planetary decadal recommendations, and shows that a number of Top Priority science questions can be achieved. A combination GHAPS and BOPPS would provide the best value for PSD for realizing that science.

Dankanich, John W.↗

Optimal Control Allocation for Distributed Electric Propulsion in a Series/Parallel Partial Hybrid Powertrain

The SUbsonic Single Aft eNgine (SUSAN) Electrofan is a NASA concept jet transport aircraft with a 2040 entry-into-service date. It utilizes electrified aircraft propulsion (EAP) to enable propulsive and aerodynamic benefits to reduce fuel usage, emissions, and cost. The powertrain consists of a single thrust producing, boundary layer-ingesting (BLI) turbofan gas turbine engine (GTE) with generators driving a series/parallel partial hybrid EAP system. The architecture includes 16 underwing contrarotating BLI fans, eight on each side, in a mailslot configuration. The 16 fans run on power extracted from the GTE through four 5 MW motor/generators connected to the Low-Pressure Spool, and a single 1 MW motor/generator on the High-Pressure Spool. The distributed fans can be used by the flight control to augment or replace the rudder function. At top of climb, the power extracted from the GTE for the fans is boosted by batteries. The design provides redundancy, and the capacity for boost means that the fans are designed to be able to provide additional thrust when necessary. These features can be leveraged in case of a fan or generator failure. This paper sets up the optimal control problem of setpoint determination for individual fans in the distributed propulsion system, accounting for electrical string efficiencies, saturations, and failures. The solution minimizes power consumption while maintaining thrust and torque on the airframe for maneuvering. Additionally, thrust that would have been lost due to temporary fan speed or power saturation is optimally redistributed to maintain overall desired thrust and torque on the aircraft. The power extraction range constraints derive from the gas turbine engine design and the small amount of variation allowed for the engine to maintain operability. The problem formulation allows the number and location of fan failures for which the thrust and torque can be maintained to be investigated, which has implications for certification. Simulations of a coordinated turn utilizing the distributed electric propulsion for yaw rate control under different failure scenarios demonstrate the robustness of the powertrain design to failures and help define its limitations.

Distributed Electric Propulsion↗

Space platform expendables resupply concept definition study. Volume 3: Work breakdown structure and work breakdown structure dictionary

The work breakdown structure (WBS) for the Space Platform Expendables Resupply Concept Definition Study is described. The WBS consists of a list of WBS elements, a dictionary of element definitions, and an element logic diagram. The list and logic diagram identify the interrelationships of the elements. The dictionary defines the types of work that may be represented by or be classified under each specific element. The Space Platform Expendable Resupply WBS was selected mainly to support the program planning, scheduling, and costing performed in the programmatics task (task 3). The WBS is neither a statement-of-work nor a work authorization document. Rather, it is a framework around which to define requirements, plan effort, assign responsibilities, allocate and control resources, and report progress, expenditures, technical performance, and schedule performance. The WBS element definitions are independent of make-or-buy decisions, organizational structure, and activity locations unless exceptions are specifically stated.

Source record↗

Developing a Strategic Plan for NASA JSC's Technology Investments

Human space exploration has always been heavily influenced by goals to achieve a specific mission on a specific schedule. This approach drove rapid technology development, the rapidity of which adds risks as well as provides a major driver for costs. The National Aeronautics and Space Administration (NASA) is now approaching the extension of human presence throughout the solar system by balancing a proactive yet less schedule-driven development of technology with opportunistic scheduling of missions as the needed technologies are realized. This approach should provide cost effective, low risk technology development that will enable efficient and effective manned spaceflight missions. As a first step, the NASA Human Spaceflight Architecture Team (HAT) has identified a suite of critical technologies needed to support future manned missions across a range of destinations, including in cislunar space, near earth asteroid visits, lunar exploration, Mars space, and Mars exploration. The challenge now is to develop a strategy and plan for technology development that efficiently enables these missions over a reasonable time period, without increasing technology development costs unnecessarily due to schedule pressure, and subsequently mitigating development and mission risks. NASA fs Johnson Space Center (JSC), as the nation's primary center for human exploration, is addressing this challenge through an innovative approach allocating Internal Research and Development funding to projects that have been prioritized using four focus criteria, with appropriate importance weighting. These four focus criteria are the Human Space Flight Technology Needs, JSC Core Technology Competencies, Commercialization Potential, and Partnership Potential. The inherent coupling in these focus criteria have been captured in a database and have provided an initial prioritization for allocation of technology development research funding. This paper will describe this process and this database, and the preliminary technology development prioritization results.

Stecklein, Jonette M.↗

Proposition to Optimize Fire Stations for Wildfires

The rising trend in wildfire occurrence and severity has put a strain on wildfire management organizations by spreading out limited resources to meet increasing demand. There has been extensive prior research and data collection to determine the areas of highest risk and to predict regional wildfire damages based on historical trends. Our group aims to utilize this data to best determine fire station placement, optimizing where resources are allocated to reduce the time and investment needed to effectively mitigate wildfires. Using existing research, we are able to calculate optimal fire station locations by utilizing a single-objective facility location problem algorithm incentivized for cost reduction. Further work would be needed to refine the algorithm to accommodate for more realistic factors including access to water and roadways as well as better accounting for the costs involved, but our work serves as a proof of concept and lays the foundation for future research. Implementation of this algorithm would allow public fire planning agencies (such as CAL FIRE and Forest Service) to shift resources to where they would be most effective.

Wildfires↗