Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Strength and Cost Analysis of New Steel Sets as Roadway Support Project in Coal Mines

Roadway support in swelling soft rocks in coal mines has become a critical challenge in recent years. For deformation control in swelling soft rocks, high strength sets are preferred in sites. But high strength always means high costs. Therefore, higher strength sets with not too much cost will be more welcomed in situ. Based on this, three new sets, including a floor beam set, a roof + floor beams set, and a roof + floor beams + braces set, have been developed in the present research. Strength comparisons and costs comparisons have been conducted in this research. Results illustrate that compared with the original set, in the floor beam set, the relative strength of bottom corners reaches 2.964, while the relative cost reaches 1.294; compared with the original set, in the roof + floor beams set, the relative strength of the top arch reaches 2.345, while the relative strength of bottom corners reaches 2.964, and the relative cost reaches 1.568; and compared with the original set, in the roof + floor beams + braces set, the relative strength of the top arch reaches 2.635, and the relative strength of bottom corners reaches 5.905, but the relative cost reaches 1.930. Floor beam set and roof + floor beams set illustrate higher strength and not too higher costs than the original set. Although the roof + floor beams + braces set exhibit much higher strength, they also demonstrate much higher costs than the original set. These new sets can be chosen according to different geological conditions in situ.

Li, Qinghai (ORCID:0000000264575001)↗

Full-scale testing, production and cost analysis data for the advanced composite stabilizer for Boeing 737 aircraft. Volume 1: Technical summary

The full scale ground test, ground vibration test, and flight tests conducted to demonstrate a composite structure stabilizer for the Boeing 737 aircraft and obtain FAA certification are described. Detail tools, assembly tools, and overall production are discussed. Cost analyses aspects covered include production costs, composite material usage factors, and cost comparisons.

Aniversario, R. B.↗

Life Cycle Assessment and Cost Analysis of a Process-Based Sorbent-Based Direct Air Capture with Temperature-Vacuum Swing Adsorption Model

This presentation discusses different aspects of LCA and TEA of sorbent-based case study updates and methodologies utilized for carbon dioxide removal technologies. The combined TEA and LCA approach adopted herein provides insight into trade-offs between environmental performance and cost efficiency under various energy supply scenarios.

carbon dioxide removal↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of the driving factors of CO 2 mitigation costs of household biogas systems in China: A LMDI decomposition with cost analysis model

China has been placing a substantial focus on biogas for reducing energy consumption and carbon dioxide (CO 2 ) emissions. The operation mode of biogas systems may make the CO 2 reduction target over-optimistic. There is limited research to investigate the influential factors that may be causing the gap between the actual and theoretical CO 2 reduction costs of biogas systems in China. In this research, by using field survey data of 209 biogas users and 489 non-biogas users from 19 villages in 2015, the gap between actual and theoretical unit CO 2 reduction cost is quantified at approximately 156 USD/t CO 2 . By employing the Logarithmic Mean Divisia Index I (LMDI) model, it is found that both the cost effect (48%) and the reduction effect (52%) contribute to the unit CO 2 reduction cost gap. Furthermore, four influential factors–household labor, accessibility to the energy resource, acceptance of biogas technology, and subsidy–significantly narrow the gap between actual and theoretical CO 2 reduction costs, while the levelized subsidy contributes to widening the gap. On average, biogas systems should be operated for at least four years and the substitution rate should be more than 67% in order to keep the gap between actual and theoretical CO 2 reduction costs under 50%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ground Level Integrated Diverse Energy Storage (GLIDES) Cost Analysis

With the increasing penetration of renewable energy, the need for advanced flexible/scalable energy storage technologies with high round-trip efficiency (RTE) and high energy density has become critical. In this paper, a techno-economic model of a novel energy storage technology developed by the Oak Ridge National Laboratory (ORNL) is presented and used to estimate the technology’s capital cost. Ground-Level Integrated Diverse Energy Storage (GLIDES) is an energy storage technology with high efficiency which can store energy via input of electricity and heat and supply dispatchable electricity. GLIDES stores energy by compressing and expanding a gas using a liquid piston. GLIDES performance has been extensively studied analytically and experimentally. This study aims to develop a comprehensive combined performance and cost modeling environment. With the desired system storage capacity kilowattage, storage time (hours), and an initial RTE guess as inputs, the model optimizes the selection of system components to minimize the capital cost. The techno-economic model described in this paper can provide preliminary cost estimates and corresponding performance for various system sizes and storage times.

Kassaee, Saiid↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Life Cycle Cost Analysis Framework for Geologic Storage of Hydrogen

Large scale geostorage options for fuels including natural gas and petroleum offer substantial buffer capacity to meet or hedge against supply disruptions. This same notion may be applied to large scale hydrogen storage to meet industrial or transportation sector needs. This study develops an assessment tool to calculate the potential ‘gate-to-gate’ life cycle costs for large scale hydrogen geostorage options in salt caverns, and continues to develop modules for depleted oil/gas reservoirs and aquifers. The U.S. Department of Energy has an interest in these types of storage to assess the geological, geomechanical and economic viability for this type of hydrogen storage. Understanding, and looking to quantify, the value of large-scale storage in a larger hydrogen supply and demand infrastructure may prove extremely beneficial for larger infrastructure modeling efforts when looking to identify the most efficient means to fuel a hydrogen demand (e.g., industrial or transportation-centric demand). Drawing from the knowledge gained in the underground large scale storage options for natural gas and petroleum in the U.S., the potential to store relatively large volumes of CO 2 in geological formations, the hydrogen storage assessment modeling will continue to build on these strengths while maintaining modeling transparency such that other modeling efforts may draw from this project.

08 HYDROGEN↗

A Life Cycle Cost Analysis Framework for Geologic Storage of Hydrogen

Large scale geostorage options for fuels including natural gas and petroleum offer substantial buffer capacity to meet or hedge against supply disruptions. This same notion may be applied to large scale hydrogen storage to meet industrial or transportation sector needs. This study develops an assessment tool to calculate the potential ‘gate-to-gate’ life cycle costs for large scale hydrogen geostorage options in salt caverns, and continues to develop modules for depleted oil/gas reservoirs and aquifers. The U.S. Department of Energy has an interest in these types of storage to assess the geological, geomechanical and economic viability for this type of hydrogen storage. Understanding, and looking to quantify, the value of large-scale storage in a larger hydrogen supply and demand infrastructure may prove extremely beneficial for larger infrastructure modeling efforts when looking to identify the most efficient means to fuel a hydrogen demand (e.g., industrial or transportation-centric demand). Drawing from the knowledge gained in the underground large scale storage options for natural gas and petroleum in the U.S., the potential to store relatively large volumes of CO 2 in geological formations, the hydrogen storage assessment modeling will continue to build on these strengths while maintaining modeling transparency such that other modeling efforts may draw from this project.

08 HYDROGEN↗

Comparative Cost Analysis of Spent Nuclear Fuel Management Alternatives

This report presents a comparative analysis of spent nuclear fuel management options to support the U.S. Department of Energy (DOE). Specifically, a set of scenarios was constructed to represent a range of possible combinations of alternative spent fuel management approaches. Analyses were performed to provide simple and credible estimates of relative costs to the U.S. government and to the nuclear utilities for moving forward with each scenario. The analyses of alternatives and options related to spent nuclear fuel management presented in this report are based on technical and programmatic considerations and do not include an evaluation of relevant regulatory and legal considerations (e.g., needs for new or modified regulations or legislation). This report has been prepared for informational and comparison purposes only and should not be construed as a determination of the legal permissibility of specific alternatives and options. No inferences should be drawn from this report regarding future actions by DOE. To the extent this report conflicts with provisions of the Standard Contract, those provisions prevail.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cost Analysis of Annual and Monthly Net Zero Energy Performance for Multifamily Buildings in the United States

As the United States continues its progress toward sustainable construction, net zero building design is becoming an increasingly important and popular topic. Two definitions of net zero energy performance, monthly and annual, provide different levels of energy autonomy and efficiency within a building. This article analyzes the viability and incremental cost for two-, three-, and four-story multifamily apartment buildings to reach both annual and monthly net zero energy performance throughout four climate zones in the United States using baseline reference buildings that represent current construction practices. Building size plays a large role in determining the capability for a building model to reach annual or monthly net zero. Two-story buildings are capable of reaching annual net zero with an increase in construction cost of about 4.4–5.6%. Three-story buildings in warmer climates can achieve annual net zero with an increase of about 5.1%, but models in colder climates cannot reach annual net zero performance. Four-story buildings cannot achieve net zero, owing to insufficient building area for solar arrays to produce electricity. Monthly net zero energy performance was significantly harder to achieve, with the only case reaching this goal being the two-story Houston based model, at an added cost of 8.2%. Generally speaking, only small buildings in warm climates will be able to achieve monthly net zero without vastly oversizing photovoltaic systems and increasing costs without adequate payback.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cost Analysis of Simple Phase Change Material-Enhanced Building Envelopes in Southern U.S. Climates

Traditional thermal designs of building envelope assemblies are based on static energy flows, yet building envelopes are subject to varying environmental conditions. This mismatch between the steady-state principles and their dynamic operation can decrease thermal efficiency. Design work supporting the development of low-energy houses showed that conventional insulations may not always be the most cost effective solution to improvement envelope thermal performance. PCM-enhanced building envelopes that simultaneously reduce the total cooling loads and shift the peak-hour loads are the focus of this report.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cost Analysis of Simple Phase Change Material-Enhanced Building Envelopes in Southern U.S. Climates

Traditional thermal designs of building envelope assemblies are based on static energy flows, yet building envelopes are subject to varying environmental conditions. This mismatch between the steady-state principles and their dynamic operation can decrease thermal efficiency. Design work supporting the development of low-energy houses showed that conventional insulations may not always be the most cost effective solution to improvement envelope thermal performance. PCM-enhanced building envelopes that simultaneously reduce the total cooling loads and shift the peak-hour loads are the focus of this report.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Baseline Cost Analysis of Energy Wastewater Treatment with Preliminary Feasibility Analysis of Critical Mineral Recovery

Critical mineral recovery from wastewater is an enhancement of conventional mining that can help meet growing demand. This work investigates two energy wastewaters that have previously been shown to be enriched in critical minerals, oil and gas produced water in the Permian Basin and combustion residual leachate. Treatment of these two wastewaters using reverse osmosis or thermal-based methods concentrates critical minerals, which improves the economic viability of critical mineral recovery. Revenue from mineral recovery could also offset treatment costs for operators. This work evaluates the cost of treatment for each wastewater and evaluates the potential revenue from critical minerals concentrated in the brine. The levelized cost of water for combustion residual leachate ranges from USD 1.90 to USD 16.20 (USD 2023/m 3 permeate) and for produced water ranges from USD 14.40 to USD 24.30 (USD 2023/m 3 distillate). Recovery opportunities range from USD 0.11 to USD 1.13 (USD 2023/m 3 permeate) for leachate and from USD 8.28 to USD 42.10 (USD 2023/m 3 distillate) for produced water, dominated by the value of magnesium and lithium. Comparing the maximum value of critical minerals contained in produced water and the maximum treatment costs, the value of critical minerals exceeds the cost of treatment by USD 17.80/m 3 distillate, which signals a potential revenue opportunity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Cost Analysis and Operational Range Prediction Based on Medium- and Heavy-Duty Electric Vehicle Real-World Deployments across the United States

While the market for medium- and heavy-duty battery-electric vehicles (MHD EVs) is still nascent, a growing number of these vehicles are being deployed across the U.S. This study used over 2.3 million miles of operational data from multiple types of MHD EVs across various regions and operating conditions to address knowledge gaps in total cost of ownership and operational range. First, real-world energy cost savings were determined: MHD fleets should experience energy cost savings each year from 2021 to 2035, regardless of vehicle platform, with the greatest savings seen in transit buses (up to USD 4459 annually) and HD trucks (up to USD 3284 annually). Second, to help fleets across various geographies throughout the U.S. assess the suitability of EVs for their year-round operating needs, operational range was modeled using the XGBoost algorithm (R2: 70%) given 22 input features relevant to vehicle efficiency. Finally, this paper recommends (1) that MHD fleets apply energy-saving practices to minimize the impacts of cold temperatures and high congestion levels on vehicle efficiency and range, and (2) that local hauling fleets select trucks with a nominal range nearly double the expected maximum daily range to account for range losses under local, urban driving conditions.

Qiu, Yin (ORCID:0009000900948794)↗