179 records · Page 10

Advancing conventional High-Resolution Electron Microscopy

Due to the exceptional performance of most modern commercial transmission electron microscopes, the achievement of phase-contrast imaging resolution in the sub-2Å range is today a routine exercise, provided the samples are compliant. Nonetheless, there remains room for improvement, and the purpose of this manuscript is to highlight procedures that might be employed by the practicing microscopist for advancing conventional high resolution electron microscopy.

440800* -- Miscellaneous Instrumentation-- (1990-)↗

Electrical control of second-harmonic generation in a WSe 2 monolayer transistor

Nonlinear optical frequency conversion, in which optical fields interact with a nonlinear medium to produce new field frequencies, is ubiquitous in modern photonic systems. However, the nonlinear electric susceptibilities that give rise to such phenomena are often challenging to tune in a given material and, so far, dynamical control of optical nonlinearities remains confined to research laboratories as a spectroscopic tool. In this paper, we report a mechanism to electrically control second-order optical nonlinearities in monolayer WSe 2 , an atomically thin semiconductor. We show that the intensity of second-harmonic generation at the A-exciton resonance is tunable by over an order of magnitude at low temperature and nearly a factor of four at room temperature through electrostatic doping in a field-effect transistor. Such tunability arises from the strong exciton charging effects in monolayer semiconductors, which allow for exceptional control over the oscillator strengths at the exciton and trion resonances. The exciton-enhanced second-harmonic generation is counter-circularly polarized to the excitation laser due to the combination of the two-photon and one-photon valley selection rules, which have opposite helicity in the monolayer. Finally, our study paves the way towards a new platform for chip-scale, electrically tunable nonlinear optical devices based on two-dimensional semiconductors.

36 MATERIALS SCIENCE↗

A Persistence Meter for Nimble Alarming Using Ambient Synchrophasor Data

Persistent oscillations in the power grid are often indicative of fragility, and may be harbingers of systemic or cascading failures. Modernization of the grid, including increased penetration of intermittent renewables and integration of new power electronics, is making the oscillatory swing dynamics of the network both more complex and variable. In this project researchers from the University of Wisconsin-Madison (Bernard Lesieutre, lead), Washington State University (Sandip Roy, lead), and the Electric Power Group (Neeraj Nayak, lead) have developed technologies that monitor persistent oscillations in the grid and provide operators with alarms and analytics when concerning oscillations are detected. Some of the algorithms have already been implemented in EPG’s PGDA software and integrated into their RTDMS system for use in control rooms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

WRPS MEETING THE CHALLENGE OF TANK WASTE

Washington River Protection Solutions (WRPS) is the Hanford tank operations contractor, charged with managing one of the most challenging environmental cleanup projects in the nation. The U.S. Department of Energy hired WRPS to manage 56 million gallons of high-level radioactive waste stored in 177 underground tanks. The waste is the legacy of 45 years of plutonium production for the U. S. nuclear arsenal. WRPS mission is three-fold: safely manage the waste until it can be processed and immobilized; develop the tools and techniques to retrieve the waste from the tanks, and build the infrastructure needed to deliver the waste to the Waste Treatment Plant (WTP) when it begins operating. WTP will 'vitrify' the waste by mixing it with silica and other materials and heating it in an electric melter. Vitrification turns the waste into a sturdy glass that will isolate the radioactivity from the environment. It will take more than 20 years to process all the tank waste. The tank waste is a complex highly radioactive mixture of liquid, sludge and solids. The radioactivity, chemical composition of the waste and the limited access to the underground storage tanks makes retrieval a challenge. Waste is being retrieved from aging single-shell tanks and transferred to newer, safer double-shell tanks. WRPS is using a new technology known as enhanced-reach sluicing to remove waste. A high-pressure stream of liquid is sprayed at 100 gallons per minute through a telescoping arm onto a hard waste layer several inches thick covering the waste. The waste is broken up, moved to a central pump suction and removed from the tank. The innovative Mobile Arm Retrieval System (MARS) is also being used to retrieve waste. MARS is a remotely operated, telescoping arm installed on a mast in the center of the tank. It uses multiple technologies to scrape, scour and rake the waste toward a pump for removal. The American Reinvestment and Recovery Act (ARRA) provided nearly $326 million over two-and-a-half years to modernize the infrastructure in Hanford's tank farms. WRPS issued 850 subcontracts totaling more than $152 million with nearly 76 percent of that total awarded to small businesses. WRPS used the funding to upgrade tank farm infrastructure, develop technologies to retrieve and consolidate tank waste and extend the life of two critical operating facilities needed to feed waste to the WTP. The 222-S Laboratory analyzes waste to support waste retrievals and transfers. The laboratory was upgraded to support future WTP operations with a new computer system, new analytical equipment, a new office building and a new climate-controlled warehouse. The 242-A Evaporator was upgraded with a control-room simulator for operator training and several upgrades to aging equipment. The facility is used to remove liquid from the tank waste, creating additional storage space, necessary for continued waste retrievals and WTP operation. The One System Integrated Project Team is ajoint effort ofWRPS and Bechtel National to identify and resolve common issues associated with commissioning, feeding and operating the Waste Treatment Plant. Two new facilities are being designed to support WTP hot commlsslomng. The Interim Hanford Storage project is planned to store canisters of immobilized high-level radioactive waste glass produced by the vitrification plant. The facility will use open racks to store the 15-foot long, two-foot diameter canisters of waste, which require remote handling. The Secondary Liquid Waste Treatment Project is a major upgrade to the existing Effluent Treatment Facility at Hanford so it can treat about 10 million gallons of liquid radioactive and hazardous effluent a year from the vitrification plant. The One System approach brings the staff of both companies together to identify and resolve WTP safety issues. A questioning attitude is encouraged and an open forum is maintained for employees to raise issues. WRPS is completing its mission safely with record-setting safety performance. Since WRPS took over the Hanford Tank Operations Contract in October 2008, the recordable injury rate has decreased 43 percent, while the lost work-days rate decreased by 30 percent. The company recently surpassed three million hours worked without a lost workday accident.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identification and Evaluation of Human Factors Issues Associated with Emerging Nuclear Plant Technology

This study has identified human performance research issues associated with the implementation of new technology in nuclear power plants (NPPs). To identify the research issues, current industry developments and trends were evaluated in the areas of reactor technology, instrumentation and control technology, human-system integration technology, and human factors engineering (HFE) methods and tools. The issues were prioritized into four categories based on evaluations provided by 14 independent subject matter experts representing vendors, utilities, research organizations and regulators. Twenty issues were categorized into the top priority category. The study also identifies the priority of each issue and the rationale for those in the top priority category. The top priority issues were then organized into research program areas of: New Concepts of Operation using Multi-agent Teams, Human-system Interface Design, Complexity Issues in Advanced Systems, Operating Experience of New and Modernized Plants, and HFE Methods and Tools. The results can serve as input to the development of a long-term strategy and plan for addressing human performance in these areas to support the safe operation of new NPPs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Building ControlScore: General Service Administration Office Building Deployment

Improvements to building control systems can lead to energy savings and increased occupant comfort. In an optimized system, process variables such as air temperature will closely follow their desired setpoints and avoid excess energy use. Typically, experts must manually inspect individual control loops to identify poor performance and opportunities for improvement. However, this approach is difficult in modern buildings that have a prohibitively large number of controllers. To address this issue, Pacific Northwest National Laboratory (PNNL) created the ControlScore concept, which takes operating data from the many controllers within a building and generates standardized scores for each loop on a scale of 0 to 10 (a score of 0 indicates poor control, a score of 10 indicates good control). PNNL applied the Building ControlScore application to all available data from a General Services Administration office building within the period of January 1, 2023, to March 9, 2023. The building scored a 4.7 overall, with all 74 of the building’s loops fitting a roughly normal distribution centered around 5. These results indicate that the analyzed systems have below-average performance with room for improvement, especially in the poorly scored systems. Airflow loops tended to have much lower scores than zone temperature loops. The lowest and highest performing systems in the building section were identified, as were all loops with a score less than 1. While the ControlScore identifies loops and systems that aren’t meeting their designated setpoints, it does not indicate the cause of those issues. For example, consider a supply air terminal unit’s airflow loop that received a low score due to it delivering less air than specified by the setpoint. The lower-than-desired airflow could be due to equipment limitations (e.g., the terminal unit or duct serving is too small to accommodate that airflow), malfunctioning equipment (e.g., a stuck damper or bad sensor), or something else entirely. The ControlScore does not diagnose problems it simply identifies the symptoms that can be explored and addressed by building operators.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quantifying Rates of Erosion Using Historical Aerial Photos - 19478

Erosion can play an important role in the fate and transport of waste at sites where disposal of long-lived waste is anticipated. The statistical characterization of key processes related to erosion is essential to the understanding of site stability through time. In this work multi-temporal historical aerial images are analyzed in conjunction with orthophotography and Lidar data to develop probability distributions for variables representing important erosion processes. Scans of photographic negatives were obtained for multiple photographs and several negatives were scanned with a calibrated photogrammetric scanner by Geomni (formerly Blue Skies Consulting) in Belen, New Mexico. Other negatives were provided by USDA or scanned on a high-resolution, large format media scanner in the United States National Archives Cartographic Research Room, College Park, Maryland (1939). An additional set of aerial photographs was obtained from the USGS EROS Data Center web site. For other years, photographic prints were available for aerial photography. Several prints were scanned with a large-format media scanner at 1200 dpi. Ground control points for selected digital images used in the stereoscopic analyses were identified in ArcMap. Ground control points were collected by matching features which could be identified in the aerial photography as well as the orthophotography or shaded relief imagery from the Lidar dataset. Such features included fence line intersections, road intersections, railroad bridges, and structures, depending on the age of the photography. Many old fence lines and abandoned roads remained visible in the shaded relief imagery while they were completely obscured by tree canopy in modern photography. Ground control elevations were sampled from the Lidar-based DEM or directly from point clouds. The image coordinates and matching three-dimensional projected coordinates of the ground control points were exported to IDL where parameters for a three-dimensional direct linear transformation (DLT) were obtained. Built-in singular value decomposition routines were used to solve an overdetermined set of equations for the eleven parameters of the DLT for a particular historical photograph. A solution to the DLT parameters was obtained for each historical aerial photograph in which features of interest were identified using the stereoscope. Ultimately, this process resulted in the identification of locations for features like gully heads using both the Lidar dataset and projection of the estimated location from the historical aerial photo under consideration back to the Lidar dataset. The distance between the estimate of the location from the historical image and that of the Lidar dataset was the estimated distance the feature has moved. This distance was then divided by the number of years between the Lidar dataset and the year of the historical aerial image of interest to get a rate of movement through time. This was done for several dozen points on each historical aerial image. There was inevitable uncertainty associated with the estimation of points from the historical aerial imagery. This includes estimation of changes in locations of features like gully heads through time. In this work a method to estimate the uncertainty associated with measurements of locations of features using the stereoscopic analysis is developed and applied. For features with locations in space that do not change (e.g., road intersections, etc.) the difference in measurements of locations from the Lidar dataset and that of the estimate from the historical aerial image provides an observation of the measurement error. These points used to estimate the measurement error are referred to as control points. For each of the historical aerial images, a different measurement error distribution is estimated using control points. These measurement errors are combined with the estimated distances from the stereoscopic analyses to produce distributions of gully retreat rates and hillslope erosion rates used along with output from Erosion Working Group (EWG) Landscape Evolution Models (LEMs) to provide statistical probability distributions for input into the PPA Model. Specifically, gully head retreat rate and gully widening rate were characterized using statistical probability distributions. The central limit theorem was then applied to develop rates that represent long-term averages that are used to inform a PPA Model built in GoldSim. The importance of these rates with respect to characterization of future risk can then assessed using sensitivity analyses. This provides an approach to determine if subsequent reduction of the uncertainty associated with the probability distributions of erosion rates will correspond to meaningful reduction in the estimation of future risk from the site. Ultimately this is a general method that utilizes historical aerial imagery to estimate rates of erosion with uncertainty. This information can be used to inform PPA models to project future risks from a given site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computational Human Performance Modeling For Alarm System Design

The introduction of new technologies like adaptive automation systems and advanced alarms processing and presentation techniques in nuclear power plants is already having an impact on the safety and effectiveness of plant operations and also the role of the control room operator. This impact is expected to escalate dramatically as more and more nuclear power utilities embark on upgrade projects in order to extend the lifetime of their plants. One of the most visible impacts in control rooms will be the need to replace aging alarm systems. Because most of these alarm systems use obsolete technologies, the methods, techniques and tools that were used to design the previous generation of alarm system designs are no longer effective and need to be updated. The same applies to the need to analyze and redefine operators’ alarm handling tasks. In the past, methods for analyzing human tasks and workload have relied on crude, paper-based methods that often lacked traceability. New approaches are needed to allow analysts to model and represent the new concepts of alarm operation and human-system interaction. State-of-the-art task simulation tools are now available that offer a cost-effective and efficient method for examining the effect of operator performance in different conditions and operational scenarios. A discrete event simulation system was used by human factors researchers at the Idaho National Laboratory to develop a generic alarm handling model to examine the effect of operator performance with simulated modern alarm system. It allowed analysts to evaluate alarm generation patterns as well as critical task times and human workload predicted by the system.

99 GENERAL AND MISCELLANEOUS↗

Model predictive control for integrated control of air-conditioning and mechanical ventilation, lighting and shading systems

Modern buildings are increasingly automated and often equipped with multiple building services (e.g., air-conditioning and mechanical ventilation (ACMV), dynamic shading, dimmable lighting). These systems are conventionally controlled individually without considering their interactions, affecting the building’s overall energy inefficiency and occupant comfort. A model predictive control (MPC) system that features a multi-objective MPC scheme to enable coordinated control of multiple building services for overall optimized energy efficiency, indoor thermal and visual comfort, as well as a hybrid model for predicting indoor visual comfort and lighting power is proposed. The MPC system was implemented in a test facility having two identical, side-by-side experimental cells to facilitate comparison with a building management system (BMS) employing conventional reactive feedback control. The MPC system coordinated the control of the ACMV, dynamic façade and automated dimmable lighting systems in one cell while the BMS controlled the building services in the other cell in a conventional manner. The MPC side achieved 15.1–20.7% electricity consumption reduction, as compared to the BMS side. Simultaneously, the MPC system improved indoor thermal comfort by maintaining the room within the comfortable range (-0.5 < predicted mean vote < 0.5) for 98.3% of the time, up from 91.8% of the time on the BMS side. Visual comfort, measured by indoor daylight glare probability (DGP) and horizontal illuminance level at work plane height, was maintained for the entire test period on the MPC side, improving from having visual comfort for 94.5% and 85.7% of the time, respectively, on the BMS side.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electronics Upgrades to the Green is Clean Phoswich Detector Systems and Programmatic Implementation at LANL - Phase II Completion - 18403

Los Alamos National Laboratory (LANL) radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to verify that GIC candidate low-density waste contains no radioactivity above background. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. The electronics currently in use by the systems are out of date and some components are no longer manufactured. In 2015, phase I upgrades to the GIC detector systems were completed. Phase I objectives included identifying more modern commercially available electronics that could replace the NIM electronics. A pulse shape discriminator (PSD) module, the Digital Gamma Finder (DGF) Pixie-4 made by XIA LLC, that fits in a compact National Instruments{sup TM} PXI chassis was identified to replace the majority of the original NIM bin electronics - a single Pixie-4 module replaces four NIM amplifiers and four NIM pulse shape analyzers (PSAs). Another phase I objective was to show that that new PSD could separate out the NaI and CsI detector signals in a manner equivalent to or better than the NIM electronics. Proof of concept was achieved in 2015 when a prototype upgrade system on ZEUS was built and tested and gating parameter settings were determined that successfully separated the NaI and CsI signals. Phase II required establishing a LabVIEW software interface with Pixie-4 electronics in lieu of the manufacturer provided Pixie-4 software called the Pixie Viewer. In addition, phase II included 1) final optimization of the gating parameters on the prototype Pixie-4 ZEUS system, 2) finalizing Requirements, Design and Test Plan documents, 3) LabVIEW software interface quality assurance (QA) testing, 4) setting up the HERCULES system with the Pixie-4 upgrade electronics, 5) check source and background calibration of both systems, 6) absolute efficiency determination on both systems and 7) procedure revisions and implementation of both systems into routine operations. In 2017 phase II was completed including the preparation of detailed Requirements, Design and Test Plan documents. The LabVIEW interface software that communicates and controls the Pixie-4 has been completed, merged with the preexisting LabVIEW operations software and fully tested. Gating parameter optimization, configuration of HERCULES with the Pixie-4 electronics, check source and background calibrations and absolute efficiency determinations have all been performed - quantitative results are presented in the full paper. For performance validation, comparison measurements of actual GIC bags on both the HERCULES system using the old NIM Bin electronics and the ZEUS system using the upgraded Pixie-4 electronics have been done and evaluated. Finally, procedure revisions and implementation of both systems into routine operations is currently in process and planned to be complete by the end of calendar year 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Defending the Homeland: Growing Foreign Challenges to the U.S. Missile Defense Posture

The Office of the Secretary of Defense (OSD) for Policy requested that Lawrence Livermore National Laboratory conduct a Congressionally directed study on homeland missile defense, pursuant to Section 1692 of the fiscal year 2020 National Defense Authorization Act. In accordance with the statutory language, this study considers whether the security benefits obtained by deployment of homeland missile defenses of the United States are undermined or counterbalanced by adverse reactions of potential adversaries, and considers the effectiveness of homeland missile defense efforts of the United States to deter the development of ballistic missiles. Almost a half-century has elapsed since the United States and the Soviet Union signed the Anti-Ballistic Missile (ABM) Treaty, and almost two decades since the former withdrew. Since withdrawing, the United States has sought to develop and deploy a layered missile defense system to defend against regional threats to U.S. and allied interests abroad and to counter limited threats to the U.S. homeland. As such, missile defense supports key national defense policy objectives. Protecting the U.S. homeland, forces abroad, allies, and partners. Deterring attacks against the United States, its allies, and partners. Assuring allies an strengthening U.S. diplomatic activities in peacetime and crisis. We offer five key findings: 1. The primary benefit of the Ground-based Midcourse Defense (GMD) system is the protection it provides the U.S. homeland against a limited but evolving rogue-state missile threat. While this system has never been tested in combat, it appears thus far to have effectively paced North Korea’s development and deployment of intercontinental ballistic missiles (ICBMs). In the absence of such a defensive capability, the United States would likely have been more heavily exposed to North Korean actions, would have operated at a much higher-risk posture, and would have had less negotiating room with which to navigate coercive tactics and crises. Its allies would have been more concerned about U.S. willingness in time of crisis and war to run the risks of protecting them. The GMD system also serves as a hedge against Iranian breakout. 2. Potential adversaries continue to develop long-range ballistic missiles despite deployment of a U.S. homeland missile defense system. This includes both rogue states and major power rivals whose long-range missile programs predated the deployment of U.S. missile defenses. While North Korea has continued its long-range missile developments and achieved an intercontinental capability, Iran has not yet reached this threshold. The broader proliferation of long-range missiles anticipated in the late 1990s has not materialized. 3. While Russia has used the existence of a U.S. homeland missile defense system as a justification for its substantial and continuing weapon modernization program, neither Russian force modernization nor the limited U.S. homeland missile defense system has altered the strategic balance. Russia has long considered U.S. missile defenses—both theater and homeland—as directed against its strategic forces and as a capability that could rapidly advance, thereby eroding Russian confidence in its nuclear deterrent. Russia’s political and military actions appear excessive and negatively impact areas such as arms control, but they do not undermine the primary benefit of the U.S. system cited in Key Finding 1. 4. China’s expansion and diversification of nuclear and missile forces has been influenced by its concerns about U.S. homeland missile defense, but those concerns are only one of many factors in China’s force planning. Although China’s actions to preserve and expand its assured retaliation prospects have not fundamentally altered the strategic balance, its buildup and lack of transparency about its force modernization goals are troubling. Taken together, the aggregate pattern of China’s modernization activities over the past two decades strongly suggests a concerted effort to develop a modern military force commensurate with its intended geopolitical status. Whatever China’s legacy concerns over the survivability of its strategic nuclear forces, its ability to overwhelm the GMD system appears intact today and will be further strengthened in the years ahead as it continues its long-term modernization program. China’s political and military actions negatively affect U.S. security interests but do not undermine the primary benefit of the U.S. system cited in Key Finding 1. 5. The basic finding that benefits have not so far been undermined by adverse reactions is a function of circumstances that are increasingly in flux. The existing GMD-centered system is under increasing pressure from the pace and scope of North Korean missile deployments. The proposed “layered” system seeks to mitigate this impending capability gap in the near term and to complement future capabilities, such as the Next Generation Interceptor, when they come online. Given the pace of U.S. missile defense developments since 2000, it is possible that adversary advances in capability will outpace the U.S. system’s ability to adapt. Additionally, because this layered system is in principle more readily scaled, it will almost certainly be viewed skeptically by China and Russia. In a context of growing great-power security competition, the Department of Defense (DoD) should consider undertaking a broader net assessment of the U.S., Russian, and Chinese force balance.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

MELCOR Accident Progression and Source Term Demonstration Calculations for a HTGR

MELCOR is an integrated thermal hydraulics, accident progression, and source term code for reactor safety analysis that has been developed at Sandia National Laboratories for the United States Nuclear Regulatory Commission (NRC) since the early 1980s. Though MELCOR originated as a light water reactor (LWR) code, development and modernization efforts over the past decades have expanded its application scope to include non-LWR reactor concepts. Current MELCOR development efforts include providing the NRC with the analytical capabilities to support regulatory readiness for licensing non-LWR technologies under Strategy 2 of the NRC's near-term Implementation Action Plans. Beginning with the Next Generation Nuclear Project (NGNP), MELCOR ha s undergone a range of enhancements to provide analytical capabilities for modeling the spectrum of advanced non-LWR concepts. This report describes the generic plant model developed to demonstrate MELCOR capabilities to perform high-temperature gas reactor (HTGR) safety evaluations. The generic plant model is based on publicly available PMBR-400 design information. For plant aspects (e.g., reactor building size and leak rate) that are not described in the PBMR-400 references, the analysts made assumptions needed to construct a MELCOR full-plant model. The HTGR model uses a TRi-structural ISOtropic (TRISO)-particle fuel pebble-bed reactor with a primary system rejecting heat to a recuperative heat exchange r. Surrounding the reactor vessel is a reactor cavity contained within a confinement room cooled by the Reactor Cavity Cooling System (RCCS). Example calculations are performed to show the plant response and MELCOR capabilities to characterize a range of accident conditions. The accidents selected for evaluation consider a range of degraded and failed modes of operation for key safety functions providing reactivity control, primary system heat removal and reactor vessel decay heat removal, and confinement cooling.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

AVESTAR Center for Operational Excellence of Electricity Generation Plants

To address industry challenges in attaining operational excellence for electricity generation plants, the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) has launched a world-class facility for Advanced Virtual Energy Simulation Training and Research (AVESTARTM). This presentation will highlight the AVESTARTM Center simulators, facilities, and comprehensive training, education, and research programs focused on the operation and control of high-efficiency, near-zero-emission electricity generation plants. The AVESTAR Center brings together state-of-the-art, real-time, high-fidelity dynamic simulators with full-scope operator training systems (OTSs) and 3D virtual immersive training systems (ITSs) into an integrated energy plant and control room environment. AVESTAR’s initial offering combines--for the first time--a “gasification with CO2 capture” process simulator with a “combined-cycle” power simulator together in a single OTS/ITS solution for an integrated gasification combined cycle (IGCC) power plant with carbon dioxide (CO2) capture. IGCC systems are an attractive technology option for power generation, especially when capturing and storing CO2 is necessary to satisfy emission targets. The AVESTAR training program offers a variety of courses that merge classroom learning, simulator-based OTS learning in a control-room operations environment, and immersive learning in the interactive 3D virtual plant environment or ITS. All of the courses introduce trainees to base-load plant operation, control, startups, and shutdowns. Advanced courses require participants to become familiar with coordinated control, fuel switching, power-demand load shedding, and load following, as well as to problem solve equipment and process malfunctions. Designed to ensure work force development, training is offered for control room and plant field operators, as well as engineers and managers. Such comprehensive simulator-based instruction allows for realistic training without compromising worker, equipment, and environmental safety. It also better prepares operators and engineers to manage the plant closer to economic constraints while minimizing or avoiding the impact of any potentially harmful, wasteful, or inefficient events. The AVESTAR Center is also used to augment graduate and undergraduate engineering education in the areas of process simulation, dynamics, control, and safety. Students and researchers gain hands-on simulator-based training experience and learn how the commercial-scale power plants respond dynamically to changes in manipulated inputs, such as coal feed flow rate and power demand. Students also analyze how the regulatory control system impacts power plant performance and stability. In addition, students practice start-up, shutdown, and malfunction scenarios. The 3D virtual ITSs are used for plant familiarization, walk-through, equipment animations, and safety scenarios. To further leverage the AVESTAR facilities and simulators, NETL and its university partners are pursuing an innovative and collaborative R&D program. In the area of process control, AVESTAR researchers are developing enhanced strategies for regulatory control and coordinated plant-wide control, including gasifier and gas turbine lead, as well as advanced process control using model predictive control (MPC) techniques. Other AVESTAR R&D focus areas include high-fidelity equipment modeling using partial differential equations, dynamic reduced order modeling, optimal sensor placement, 3D virtual plant simulation, and modern grid. NETL and its partners plan to continue building the AVESTAR portfolio of dynamic simulators, immersive training systems, and advanced research capabilities to satisfy industry’s growing need for training and experience with the operation and control of clean energy plants. Future dynamic simulators under development include natural gas combined cycle (NGCC) and supercritical pulverized coal (SCPC) plants with post-combustion CO2 capture. These dynamic simulators are targeted for use in establishing a Virtual Carbon Capture Center (VCCC), similar in concept to the DOE’s National Carbon Capture Center for slipstream testing. The VCCC will enable developers of CO2 capture technologies to integrate, test, and optimize the operation of their dynamic capture models within the context of baseline power plant dynamic models. The objective is to provide hands-on, simulator-based “learn-by-operating” test platforms to accelerate the scale-up and deployment of CO2 capture technologies. Future AVESTAR plans also include pursuing R&D on the dynamics, operation, and control of integrated electricity generation and storage systems for the modern grid era. Special emphasis will be given to combining load-following energy plants with renewable and distributed generating supplies and fast-ramping energy storage systems to provide near constant baseload power.

97 MATHEMATICS AND COMPUTING↗

Status of Electronics Upgrades to the LANL Green is Clean Phoswich Detector Systems - 16419

Los Alamos National Laboratory radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to assay and verify that GIC candidate waste meets free release disposal requirements. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The crystals are set in an oxygen-free high-conductivity copper housing with a very thin (0.025 mm) aluminum entrance window. The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. These electronic modules provide the buffering, amplification, and pulse shape analyzer needed for the proper presentation of signals to the custom Phosmux router module. The router module separates the sodium iodide and cesium iodide signals by their rise times and transfers this information into the computer-mounted multichannel analyzer, a Canberra Model S-100 system. While these NIM Bin counting electronics configurations have been effective for approximately 20 years of operation, they are bulky requiring numerous modules per detector and the important Phosmux module is no longer manufactured by LANL. Modern advancement of commercial counting electronics now offer more compact options for equivalent detector signal processing. A pulse shape discriminator module, the DGF Pixie-4, made by XIA LLC, has been identified that can replace the majority of the original NIM bin electronics in a much more compact chassis - one Pixie-4 replaces four NIM amplifiers and four NIM PSAs and fits in a small National Instruments{sup TM} chassis. Thus, LANL has initiated a system upgrade project to replace the historic NIM electronics with the XIA Pixie4 and associated configuration software. The hardware for one Phoswich systems has been procured for the project and the configuration software, customized for the LANL Phoswich detector application, has been written by the manufacturer. Initial setup and optimization of the Pixie-4 configuration has been performed. Qualitative and quantitative baseline comparisons to the NIM electronics has been performed. Good agreement of key low energy gamma lines between the systems has allowed 'Proof of Concept' to be concluded. Further optimization and performance evaluations are in progress. Modifications to the LabVIEW{sup TM} based operating software (originally written by VI Control Systems Ltd.) are being performed by a LANL LabVIEW{sup TM} programmer to accommodate the electronics upgrade. A new LabVIEW{sup TM} interface to control the Pixie-4 has already been developed. Final optimization and testing, formal software QA, and revisions to operating procedures are in progress to achieve completion of the GIC system upgrade project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TH-CD-209-10: Scanning Proton Arc Therapy (SPArc) - The First Robust and Delivery-Efficient Spot Scanning Proton Arc Therapy

Purpose: To develop a delivery-efficient proton spot-scanning arc therapy technique with robust plan quality. Methods: We developed a Scanning Proton Arc(SPArc) optimization algorithm integrated with (1)Control point re-sampling by splitting control point into adjacent sub-control points; (2)Energy layer re-distribution by assigning the original energy layers to the new sub-control points; (3)Energy layer filtration by deleting low MU weighting energy layers; (4)Energy layer re-sampling by sampling additional layers to ensure the optimal solution. A bilateral head and neck oropharynx case and a non-mobile lung target case were tested. Plan quality and total estimated delivery time were compared to original robust optimized multi-field step-and-shoot arc plan without SPArc optimization (Arcmulti-field) and standard robust optimized Intensity Modulated Proton Therapy(IMPT) plans. Dose-Volume-Histograms (DVH) of target and Organ-at-Risks (OARs) were analyzed along with all worst case scenarios. Total delivery time was calculated based on the assumption of a 360 degree gantry room with 1 RPM rotation speed, 2ms spot switching time, beam current 1nA, minimum spot weighting 0.01 MU, energy-layer-switching-time (ELST) from 0.5 to 4s. Results: Compared to IMPT, SPArc delivered less integral dose(−14% lung and −8% oropharynx). For lung case, SPArc reduced 60% of skin max dose, 35% of rib max dose and 15% of lung mean dose. Conformity Index is improved from 7.6(IMPT) to 4.0(SPArc). Compared to Arcmulti-field, SPArc reduced number of energy layers by 61%(276 layers in lung) and 80%(1008 layers in oropharynx) while kept the same robust plan quality. With ELST from 0.5s to 4s, it reduced 55%–60% of Arcmulti-field delivery time for the lung case and 56%–67% for the oropharynx case. Conclusion: SPArc is the first robust and delivery-efficient proton spot-scanning arc therapy technique which could be implemented in routine clinic. For modern proton machine with ELST close to 0.5s, SPArc would be a popular treatment option for both single and multi-room center.

60 APPLIED LIFE SCIENCES↗

Analysis of, and defense against, spurious actuations and other incorrect behaviors of digital control systems - 390

Modern digital instrumentation and control (I and C) systems offer nearly unlimited functional capability. However, the complexity of their design (including their system software and application software) is significantly higher than that of conventional, hardwired systems, to the point that it is generally impossible to demonstrate that there are no residual design errors, even when the best development and verification techniques have been applied. When activated by specific conditions, design errors could result in systematic failures, i.e., failures that occur deterministically each time and wherever an activating condition is present. Redundancy could be defeated when the same design error affects multiple channels or systems, and the activating condition affects several of these channels or systems. In the case of safety I and C systems, most of the functions are poised protection functions that must be actuated when and only when a demand situation occurs in the plant. In nuclear power plants, the most dangerous failure mode for such functions generally is failure to actuate, and many measures are taken to protect from such failure mode. This paper considers the other failure modes of safety I and C functions, and also the failure modes of the other I and C functions that are less important to safety. It is not limited to poised functions, and considers other types of functions such as regulation functions or human interface functions. It proposes a framework for analyzing and providing defense against spurious actuations and other incorrect behaviors from digital I and C systems directly interacting with the plant process or with operators: these might be useful for example to justify that design bases for reactor protection are adequate, or to ensure plant performance and availability. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nuclear Decontamination Evolution and Revolution - 20349

Decontamination, one of the oldest practices in the nuclear industry, is about to change. While no single approach to decontamination is appropriate in all situations, decontamination of highly contaminated surfaces is historically viewed as difficult and/or marginally effective and fixatives and strippable coatings are often called on to manage time sensitive contamination control issues. The deferral of proper decontamination can lead to accumulated concentrations of radioactive material increasing the risk of cross-contamination of workers and equipment while also increasing radiation levels, which further discourages decontamination. The results of the subject testing demonstrate that superior decontamination factors are readily achievable and the ALARA benefit of decontamination is viable through advanced decontamination technologies in conjunction with innovative application techniques. The collateral benefits will save countless radiological man-hours and personnel radiological exposure. The appropriate use of radiological decontamination techniques can prevent or limit the adverse effects of highly radioactive contamination in the work area. High levels of radiological contamination are typically associated with some of the most physically demanding work in the nuclear industry. Additionally, working in highly contaminated environments increases the risk of exposure to elevated levels of airborne radioactivity and radiation from the source term of the contamination, particularly in hard to reach areas or complex equipment. Veolia's Alaron Nuclear Services (Alaron), a fully integrated nuclear facility, has provided the nuclear industry waste treatment, consolidation, repackaging, and broad decontamination services for almost 35 years. In looking at solutions for its customers, as well as for their own facility, Alaron has recently collaborated with Environmental Alternatives, Inc. (EAI), which has provided innovative solutions addressing difficult nuclear decontamination and industrial cleaning challenges since 1989. This broad range of experience along with the products to support the work created an ideal partner for Alaron's needs at their facility. The benefits of collaboration were immediately recognizable to the management of both companies although the decontamination challenge was significant. Due to the nature of the services offered, contamination at the Alaron facility is routine. The recent decontamination experience at Alaron utilized an innovative surfactant process that quickly produces remarkably higher decontamination factors for both removable surface contamination and fixed contamination. Considering the time to decontaminate areas historically designated for high radiological hazard work, the results from this decontamination effort not only reduced contamination levels but also significantly lowered exposure rates in the working environment. The relative ease with which the surfactant is applied, combined with extraordinary decontamination test results, indicates the potential to alter current radiological work processes in a way that improves worker comfort, and removes radiological engineering barriers, allowing Alaron to complete complex radiological tasks more efficiently and effectively. In a series of two simple applications of the decontamination agent to contaminated high bay vertical surfaces, as well as a variety of horizontal and vertical surfaces with variable porousness and surface sealants, there was an overall reduction in removable contamination of approximately 73% with a reduction in area dose of approximately 93%. The results indicate additional reduction in fixed contamination with application of the surfactant. These values are much higher than experienced with more traditional decontamination agents. In conjunction with demonstrating EAI's surfactant on room surfaces, additional studies were conducted on complex geometry equipment including waste processing equipment, tools, and heavily contaminated parts normally handled from Alaron's customers. Evaluations were made with straight application of EAI's surfactant as well as adding additional techniques to the treatment which afforded revolutionary improvements in the levels of contamination removed. Successful decontamination with up to 95% reduction in removable contamination with just one application were demonstrated in several of the trials. This paper outlines the planned approach to use this technology, the variety of surfaces and equipment treated, and the results of the decontamination efforts. Furthermore, this paper discusses options for pretreatment of certain heavily contaminated equipment prior to employees handling and/or working with the equipment. The potential for dose saving and the reduced risk of cross-contamination with the added benefit of lower PPE requirements, produces an enormous potential for cost and time savings. Attendees will benefit from Alaron's experiences and more fully understand the capabilities of EAI's decontamination process. With the variety of contamination agents, forms and surfaces on which the technology was demonstrated, the information will be valuable to a broad cross-section of industry users. The significance of this report demonstrates superior decontamination factors are achievable utilizing the next evolution of decontamination technology and that the ALARA benefits of decontamination are available through advanced and modern decontamination efforts. The collateral benefits will save countless radiological man-hours and valuable personnel radiological exposure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗