At least 181 records · Page 10

HC-NIDS: signatures and simulations for detecting cyber-attacks aiming to cause damage against cyber-physical energy systems

Physical device safety is typically implemented locally using embedded controllers, while operations safety is primarily performed in control centers. Safe operations can be enhanced by correct design of device-level control algorithms, and protocols, procedures and operator training at the control-room level, but all can fail. Moreover, these elements exchange data and issue commands via vulnerable communication layers. In order to secure these gaps and enhance operational safety, we believe monitoring of command sequences must be combined with an awareness of physical device limitations and automata models that capture safety mechanisms. One way of doing this is by leveraging specification-based intrusion detection to monitor for physical constraint violations. The method can also verify that physical infrastructure state is consistent with monitoring information and control commands exchanged between field devices and control centers. This additional security layer enhances protection from both outsider attacks and insider mistakes. We implemented specification-based SCADA command analyzers using physical constraint algorithms directly in the Bro framework and Broccoli APIs for three separate scenarios: a water heater, an automated distribution system, and an over-current protection scheme. To accomplish this, we added low-level analyzers capable of examining control system-specific protocol packets for both Modbus TCP and DNP3, and also higher-level analyzers able to interpret device command and data streams within the context of each device's physical capabilities and present operational state. Thus the software that we are making available includes the Bro/Broccoli scripts for these three scenarios, as well as simulators, written in C, of those scenarios that generate sample traffic that is monitored by the Bro/Broccoli scripts. In addition, we have also implemented systems to directly pull cyber-physical information from the OSIsoft PI historian system. We have included the Python scripts used to perform that monitoring.

Source record↗

KiloPower Project - KRUSTY Experiment Nuclear Design

This PowerPoint presentation covers the following topics: Reference Kilopower configuration; Reference KRUSTY configuration; KRUSTY design sensitivities; KRUSTY reactivity coefficients; KRUSTY criticality safety and control; KRUSTY core activation/dose; and KRUSTY shielding, room activation/dose.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

HC-NIDS: signatures and simulations for detecting cyber-attacks aiming to cause damage against cyber-physical energy systems

Physical device safety is typically implemented locally using embedded controllers, while operations safety is primarily performed in control centers. Safe operations can be enhanced by correct design of device-level control algorithms, and protocols, procedures and operator training at the control-room level, but all can fail. Moreover, these elements exchange data and issue commands via vulnerable communication layers. In order to secure these gaps and enhance operational safety, we believe monitoring of command sequences must be combined with an awareness of physical device limitations and automata models that capture safety mechanisms. One way of doing this is by leveraging specification-based intrusion detection to monitor for physical constraint violations. The method can also verify that physical infrastructure state is consistent with monitoring information and control commands exchanged between field devices and control centers. This additional security layer enhances protection from both outsider attacks and insider mistakes. We implemented specification-based SCADA command analyzers using physical constraint algorithms directly in the Bro framework and Broccoli APIs for three separate scenarios: a water heater, an automated distribution system, and an over-current protection scheme. To accomplish this, we added low-level analyzers capable of examining control system-specific protocol packets for both Modbus TCP and DNP3, and also higher-level analyzers able to interpret device command and data streams within the context of each device's physical capabilities and present operational state. Thus the software that we are making available includes the Bro/Broccoli scripts for these three scenarios, as well as simulators, written in C, of those scenarios that generate sample traffic that is monitored by the Bro/Broccoli scripts. In addition, we have also implemented systems to directly pull cyber-physical information from the OSIsoft PI historian system. We have included the Python scripts used to perform that monitoring.

Source record↗

Troffer Retrofits: Northern Arizona University Building Shines with Innovative Lighting Design - Interior Lighting Campaign

This case study describes lighting efficiency measures in Northern Arizona University's Student and Academic Services Building. The building was designed with space-by-space lighting controls to enable scheduling and dimming in offices, conference rooms, and classrooms, and achieved 46% energy savings compared to standard code-compliant lighting.

education, lighting, controls, dimming, classroom,↗

Ibis Networks/WattIQ (IN2 Final Report)

Ibis Networks is a full-stack cleantech company that provides plug-level energy monitoring and control to solve energy and asset management problems for the enterprise. During DATES – DATES, an NREL research team worked with the Ibis team to validate their product, the InteliSocket. The Ibis InteliSocket is a pass-through plug-load energy monitor and controller that is designed to reduce energy wasted by common 120 V plug-in devices in commercial office buildings, such as computer peripherals, conference room AV equipment, and break-room appliances. The system can shut off supply power to these end uses via remote control, manual switches, pre-set schedules, or automated control algorithms. The scope of this IN2 project was the development and refinement of “smart” learning behavior algorithms (LBAs), which could help installation processes and dramatically expand the sockets’ capabilities and energy-saving potential by suggesting suitable control schedules that are based on monitored use patterns. While Ibis has the analytical and software expertise for algorithm development, the lack of test data, both in a controlled laboratory setting and in real-life deployment scenarios, represented a key barrier toward commercialization of the product. Assistance through the IN2 program provided an opportunity to conduct the needed “trial and error” algorithm development. The project included baseline field-data collection, laboratory testing, and field validation components, all of which were conducted at the NREL campus between April 2017 and July 2019.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The 'Room within a Room' Concept for Monitored Warhead Dismantlement

Over the past 10 years, US and UK experts have engaged in a technical collaboration with the aim of improving scientific and technological abilities in support of potential future nuclear arms control and non-proliferation agreements. In 2011 a monitored dismantlement exercise provided an opportunity to develop and test potential monitoring technologies and approaches. The exercise followed a simulated nuclear object through a dismantlement process and looked to explore, with a level of realism, issues surrounding device and material monitoring, chain of custody, authentication and certification of equipment, data management and managed access. This paper focuses on the development and deployment of the ‘room-within-a-room’ system, which was designed to maintain chain of custody during disassembly operations. A key challenge for any verification regime operating within a nuclear weapon complex is to provide the monitoring party with the opportunity to gather sufficient evidence, whilst protecting sensitive or proliferative information held by the host. The requirement to address both monitoring and host party concerns led to a dual function design which: • Created a controlled boundary around the disassembly process area which could provide evidence of unauthorised diversion activities. • Shielded sensitive disassembly operations from monitoring party observation. The deployed room-within-a-room was an integrated system which combined a number of chain of custody technologies (i.e. cameras, tamper indicating panels and enclosures, seals, unique identifiers and radiation portals) and supporting deployment procedures. This paper discusses the bounding aims and constraints identified by the monitoring and host parties with respect to the disassembly phase, the design of the room-within-a-room system, lessons learned during deployment, conclusions and potential areas of future work. Overall it was agreed that the room-within-a-room approach was effective but the individual technologies used to create the system deployed during this exercise required further development.

Nuclear Weapon, Dismantlement, Chain of Custody, C↗

Hidden Spin-Valley Locking Stabilizes Nanosecond Spin Polarization in 2D Perovskites

Room-temperature spin control in semiconductors is fundamental to spin-optoelectronics. Although inversion symmetry breaking offers one path for spin control in semiconductors, strong spin dephasing at elevated temperatures remains a persistent limitation. Hidden spin polarization without global symmetry breaking provides another promising material design strategy, but robust spin stabilization from this effect has yet to be experimentally realized. Here we show spin stabilization at room temperature in two-dimensional hybrid organic-inorganic perovskites through hidden spin-valley locking. We use functional non-primary ammonium cations to induce symmetry-breaking distortions in the metal-halide layers, producing giant local spin splitting while preserving global inversion symmetry. Time-resolved circular dichroism measurements reveal optically generated spin-polarized carriers that persist for 686 ps in (AzOH)2PbI4 and 4.7 ns in the lead-free analogue (AzOH)2SnI4 at room temperature, without an external magnetic field. First-principles calculations suggest that these long lifetimes arise from hidden spin valleys, enhanced dielectric screening and reduced spin-orbit-induced scattering in the Sn-based compound. Our design paradigm unlocks inversion-symmetric semiconductors with ultralong spin lifetimes, broadening the materials options for light-driven spin control.

14 SOLAR ENERGY↗

HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intraarea transfers utilizing STPs from July 2006 to August 2007. This operation and successful removal of sludge material meets requirement of approximately 19,000 to 28,000 liters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. Removal of the last 35% of sludge was exponentially more difficult, as less and less sludge was available to mobilize and the lighter sludge particles were likely removed during the early mixing campaigns. The removal of the 72,000 liters (19,000 gallons) of sludge was challenging due to a number factors. One primary factor was the complex internal cooling coil array within Tank 6 that obstructed mixer discharge jets and impacted the Effective Cleaning Radius (ECR) of the Submersible Mixer Pumps. Minimal access locations into the tank through tank openings (risers) presented a challenge because the available options for equipment locations were very limited. Mechanical Sludge Removal activities using SMPs caused the sludge to migrate to areas of the tank that were outside of the SMP ECR. Various SMP operational strategies were used to address the challenge of moving sludge from remote areas of the tank to the transfer pump. This paper describes in detail the Mechanical Sludge Removal activities and mitigative solutions to cooling coil obstructions and other challenges. The performance of the WOW system and SMP operational strategies were evaluated and the resulting lessons learned are described for application to future Mechanical Sludge Removal operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Light Water Sustainability Program: Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis

This report describes the interim progress for research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and elsewhere throughout the plant, along with a greater use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human-performance-related organizational and technical design issues are identified and addressed. This report describes modeling tools and techniques, based on sociotechnical system theory, to support these design goals and their application in the current research effort. The report is intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control and feedback relationships amongst the system’s technical and organizational components. Up to this point, we have employed a Causal Analysis based on STAMP (CAST) technique to examine a performance- and safety-related incident at an industry partner’s plant that involved the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. Our ongoing analysis is focused on identifying near-term process improvements and longer-term design requirements for an optimized IAE system. The latter analyses will employ a second STAMP-derived technique, System-Theoretic Process Analysis (STPA). STPA is a useful modeling tool for generating and analyzing actual or potential information control structures. Finally, we have begun modeling plantwide organizational relationships and processes. Organizational system modeling will supplement our CAST and STPA findings and provide a basis for mapping out a plantwide information control architecture. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the initiating event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. We present two preliminary information automation models. The proactive issue resolution model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system. From our results, we have generated a set of preliminary system-level requirements and safety constraints. These requirements will be further developed over the remainder of our project in collaboration with nuclear industry subject matter experts and specialists in the technical systems under consideration. Additionally, we will continue to pursue the system analyses initiated in the first part of our effort, with a particular emphasis on STPA as the main tool to identify weak or weakening control structures that affect the resilience of organizations and programs. Our intent is to broaden the scope of the analysis from an individual use case to a related set of use cases (e.g., maintenance tasks, compliance tasks) with similar human-system performance challenges. This will enable more generalized findings to refine the Proactive Issue Resolution and IAE models, as well as their system-level requirements and safety constraints. We will use organizational system modeling analyses to supplement STPA findings and model development. We conclude the report with a set of summary recommendations and an initial draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

High-Level Waste Mechanical Sludge Removal at the Savannah River Site - F Tank Farm Closure Project

The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intra-area transfers utilizing STPs from July 2006 to August 2007. This operation and successful removal of sludge material meets requirement of approximately 19,000 to 28,000 liters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. Removal of the last 35% of sludge was exponentially more difficult, as less and less sludge was available to mobilize and the lighter sludge particles were likely removed during the early mixing campaigns. The removal of the 72,000 liters (19,000 gallons) of sludge was challenging due to a number factors. One primary factor was the complex internal cooling coil array within Tank 6 that obstructed mixer discharge jets and impacted the Effective Cleaning Radius (ECR) of the Submersible Mixer Pumps. Minimal access locations into the tank through tank openings (risers) presented a challenge because the available options for equipment locations were very limited. Mechanical Sludge Removal activities using SMPs caused the sludge to migrate to areas of the tank that were outside of the SMP ECR. Various SMP operational strategies were used to address the challenge of moving sludge from remote areas of the tank to the transfer pump. This paper describes in detail the Mechanical Sludge Removal activities and mitigative solutions to cooling coil obstructions and other challenges. The performance of the WOW system and SMP operational strategies were evaluated and the resulting lessons learned are described for application to future Mechanical Sludge Removal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Draft Function Allocation Framework and Preliminary Technical Basis for Advanced SMR Concepts of Operations

This report presents preliminary research results from the investigation into the development of new models and guidance for Concepts of Operations in advanced small modular reactor (AdvSMR) designs. AdvSMRs are nuclear power plants (NPPs), but unlike conventional large NPPs that are constructed on site, AdvSMRs systems and components will be fabricated in a factory and then assembled on site. AdvSMRs will also use advanced digital instrumentation and control systems, and make greater use of automation. Some AdvSMR designs also propose to be operated in a multi-unit configuration with a single central control room as a way to be more cost-competitive with existing NPPs. These differences from conventional NPPs not only pose technical and operational challenges, but they will undoubtedly also have regulatory compliance implications, especially with respect to staffing requirements and safety standards.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Measurement, Control and Minimization of Thermal Shift in Superconducting Devices

Superconducting (SC) magnetic and SC radiofrequency (SRF) devices designed for use in particle accelerators present challenging alignment problems. These devices are assembled and aligned at room temperature but operate at 2-4 K with thermal offsets being large relative to the desired alignment tolerances. Unique solutions have been developed for controlling and minimizing the thermal shift including utilization of materials that expand under cooling to compensate for contraction and kinematic couplings. Measurement of the thermal shift within SC devices is performed using both optical telescope and laser instruments, typically through a parallel plate vacuum glass window. This paper presents techniques developed at Argonne National Laboratory for measuring, controlling and minimizing thermal shift in SC devices at both the Advanced Photon Source (APS) and the Argonne Tandem Linear Accelerator System (ATLAS).

Jansma, William G.↗

Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis: Tool Development and Method Evaluation

This report is an update to a prior report that describes progress and findings for a program of research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and throughout the plant, along with a greater interest in the use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human performance-related organizational and technical design issues are identified and addressed early in the design process. This report describes modeling tools and techniques, based on sociotechnical systems theory, to support these design goals and their application in the current research effort. The report is primarily intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control, feedback, and communication relationships amongst the system’s technical and organizational components. We have employed two STAMP-based tools in this effort. The first is Causal Analysis based on STAMP (CAST), an accident and incident analysis technique that was used to examine a performance- and safety-related incident at an industry partner’s plant involving the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. The second tool is Systems Theoretic Process Analysis (STPA) which is a proactive risk analysis tool used to examine existing and potential, planned sociotechnical systems. STPA was used to identify risk factors in the current design of a generic nuclear power plant (NPP) preventive maintenance system. Our analyses focused on identifying near-term system improvements and longer-term design requirements for an optimized IAE system. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived time and schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the eventual event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. STPA findings exposed several areas of concern in the design of current preventive maintenance systems. We also present two preliminary information automation models. The proactive issue resolution (PIR) model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system and represents an end-state vision for our work. From our results, we have generated an initial set of preliminary system-level requirements and safety constraints for these models. We have also focused on early development of easy to learn, easy to use “transportable” tools for sociotechnical systems analysis. We intend these to be used by NPP personnel as a means of gaining reliable and relatively quick insight into (1) sociotechnical systems factors impacting incidents and accidents, (2) potential sociotechnical risk factors in existing or planned system designs, and (3) potential weaknesses in a system’s safety and/or information control structure. We conclude the report with a set of summary recommendations, a discussion of planned and potential follow-on research and development, and a draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

2012-13 Blue Room Low Enriched Uranium Sample Irradiation, Associated Gas Handling System, and Subsequent Separation Chemistry

An irradiation experiment was designed for the production of 100 mCi of medical isotope Mo-99 from a Low Enriched Uranium (LEU) solution. 300 mL of 150 gU/L LEU sulfate solution (pH1) was prepared and irradiated at the LANSCE Blue Room facility. The apparatus designed for the irradiation included a gas handling system, in which safe operation could be controlled by monitoring change in gas pressure. The gas handling system also contained a hydrogen oxygen recombiner, to recombine the gases generated through radiolysis of water, and an iodine trap, primarily for I-131. Pressure transients were observed during irradiation, which could be controlled by increasing the flow rate of the circulating pump. After irradiation the LEU solution was transferred to a hot cell facility for subsequent Mo-99 recovery using a titania column separation process, with samples also subsequently shipped to a radiochemical laboratory for further analysis. Gamma spectroscopy analysis revealed that ca. 70 mCi of Mo-99 was present at end of beam, in good agreement with the predicted value when actual beam history was included into the calculation. There was 80-85 % recovery of Mo-99 through a titania column separation, excluding losses through radioactive decay. The % Mo-99 recovery was lower than observed previously for the 1 mCi Mo-99 production (Target 4) experiments undertaken at LANL using the same separation apparatus, with on this occasion evidence of lower oxidation state molybdenum remaining irreversibly bound to the titania column. Subsequent postmortem analysis of the Blue room apparatus revealed that there had been no leaks in the gas handling system, the hydrogen and oxygen recombination appeared to work efficiently, and recovery of irradiated uranium trapped in the system allowed for >99% uranium mass balance.

07 ISOTOPE AND RADIATION SOURCES↗

Computerized procedure systems: procedure edition and maintenance challenges - 232

Very few nuclear power plants are using computerized procedures to guide the control room operation. A CPS implementation consists of two processes: digitalization and computerization. The former deals with the transformation of paper-based procedure into a digital data; the latter is referred to as the addition to that data of extra information that is meaningful for decision-making. This information may include real-time data (plant parameter values and binary process values to indicate equipment states), provide access to trends and historical data, etc. In order to be efficient and to optimize the digitalization and computerization processes, these set of aids should be implemented at the same time as operating procedures are digitalized There are references of plants having successfully implemented Computerized Procedures Systems (CPS) for emergency procedures, but when questioned about normal or abnormal operating procedures, operators and plant management seem reluctant to take that step. Given that a CPS is meant, by design concept, to increase operation crew efficiency by facilitating the procedures execution and reducing human error, why are we reluctant to enjoy CPS benefits in the most common plant status (i.e. normal operation)? Although there are many answers to this question, one is shared by most of the users: CPSs are not designed for editing and maintaining procedures easily and reliably. Normal operating procedures, in opposition to the emergency procedures, are often reviewed. Nowadays, these edition activities are performed easily with a word processor software and using paper, but what is required when dealing with a CPS? (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Measurement and control system for cryogenic helium gas bearing turbo-expander experimental platform based on Siemens PLC S7-300

An experimental platform for cryogenic Helium gas bearing turbo-expanders is established at the Technical Institute of Physics and Chemistry, Chinese Academy of Sciences. This turbo-expander experimental platform is designed for performance testing and experimental research on Helium turbo-expanders with different sizes from the liquid hydrogen temperature to the room temperature region. A measurement and control system based on Siemens PLC S7-300 for this turbo-expander experimental platform is developed. Proper sensors are selected to measure such parameters as temperature, pressure, rotation speed and air flow rate. All the collected data to be processed are transformed and transmitted to S7-300 CPU. Siemens S7-300 series PLC CPU315-2PN/DP is as master station and two sets of ET200M DP remote expand I/O is as slave station. Profibus-DP field communication is established between master station and slave stations. The upper computer Human Machine Interface (HMI) is compiled using Siemens configuration software WinCC V6.2. The upper computer communicates with PLC by means of industrial Ethernet. Centralized monitoring and distributed control is achieved. Experimental results show that this measurement and control system has fulfilled the test requirement for the turbo-expander experimental platform.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Laser-Based Method for On-Site Analysis of UF6 at Enrichment Plants

The International Atomic Energy Agency’s (IAEA’s) long-term research and development plan calls for more cost-effective and efficient safeguard methods to detect and deter misuse of gaseous centrifuge enrichment plants (GCEPs). The IAEA’s current safeguards approaches at GCEPs are based on a combination of routine and random inspections that include environmental sampling and destructive assay (DA) sample collection from UF6 in-process material and selected cylinders. Samples are then shipped offsite for subsequent laboratory analysis. In this paper, a new DA sample collection and onsite analysis approach that could help to meet challenges in transportation and chain of custody for UF6 DA samples is introduced. This approach uses a handheld sampler concept and a Laser Ablation, Laser Absorbance Spectrometry (LAARS) analysis instrument, both currently under development at the Pacific Northwest National Laboratory. A LAARS analysis instrument could be temporarily or permanently deployed in the IAEA control room of the facility, in the IAEA data acquisition cabinet, for example. The handheld PNNL DA sampler design collects and stabilizes a much smaller DA sample mass compared to current sampling methods. The significantly lower uranium mass reduces the sample radioactivity and the stabilization approach diminishes the risk of uranium and hydrogen fluoride release. These attributes enable safe sample handling needed during onsite LAARS assay and may help ease shipping challenges for samples to be processed at the IAEA’s offsite laboratory. The LAARS and DA sampler implementation concepts will be described and preliminary technical viability results presented.

LAARS↗