Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Composite models”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Predicting electrical conductivity in Cu/Nb composites: A combined model-experiment study

The generation of high magnetic fields requires materials with high electric conductivity and good strength properties. Cu/Nb composites are considered to be good candidates for this purpose. In this work, we aim to predict, from theory, the dependence of electric conductivity on the microstructure, most notably on the layer thickness and grain sizes. We also conducted experiments to calibrate and validate our simulations. Bimetal interfaces and grain boundaries are confirmed to have the largest impact on conductivity in this composite material. In this approach, a distribution of the layer thickness is accounted for in order to better model the experimentally observed microstructure. Because layer thicknesses below the mean free path of Cu significantly degrade the conductivity, an average layer thickness larger than expected may be needed to meet conductivity requirements in order to minimize these smaller layers in the distribution. We also investigate the effect of variations in volume fraction of Nb and temperature on the material’s conductivity.

36 MATERIALS SCIENCE↗

Application of the Recharge Estimation Tool (RET) to Prepare Spatially and Temporally Variable Recharge Boundary Conditions for Hanford Site Composite Analysis Vadose Zone Models

This environmental calculation file (ECF) describes the development of a tool for translating recharge estimates into readable input for STOMP© (Subsurface Transport Over Multiple Phases) vadose zone models primarily supporting the vadose zone (VZ) facets of the updated Hanford Site Composite Analysis (CA) and the Hanford Site Cumulative Impact Evaluation (CIE). The recharge estimates are spatiotemporally variable and are produced by the Recharge Evolution Tool (RET) described in Hanford Site-wide Natural Recharge Boundary Condition for Groundwater Models (ECF-HANFORD-15-0019). Outputs from the RET are given in Esri’s™ feature class format with yearly estimates and associated metadata encapsulated in file geodatabase objects. For STOMP models, the translated output is a text file in the format of an input boundary condition card, consistent with STOMP software requirements. The text file contains assimilated spatiotemporal recharge estimates produced by the RET. The tool discussed in this document will be referred to as the “RET2STOMP” tool.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mechanistic modeling of lifetime distribution of SiC/SiC composite claddings

Silicon carbide (SiC) fiber-reinforced SiC matrix (SiC/SiC) composites have emerged as a new material candidate for fuel claddings in light water reactors. Recent studies showed that the load capacity of SiC/SiC materials exhibits a considerable statistical variation. Therefore, reliability analysis plays a critical role in design of SiC/SiC composite claddings. Here, this paper presents a probabilistic model for the lifetime distribution of SiC/SiC composites. The model is anchored by a multiaxial stress-based failure criterion and subcritical damage accumulation mechanism. Based on the kinetics of subcritical damage growth, the lifetime distribution of a laboratory test specimen for any given loading history can be calculated. A finite weakest-link model is used to extrapolate the lifetime distribution of test specimens to full-length claddings. It is shown that the damage accumulation mechanism has a strong influence on the lifetime distribution of the cladding. This finding highlights the importance of understanding the static fatigue behavior of SiC/SiC composites. The present analysis also demonstrates an intricate length effect on the failure probability of the cladding, which is expected to play a crucial role in design extrapolation.

36 MATERIALS SCIENCE↗

Development of a compressive failure model for carbon fiber composites and associated uncertainties.

An approach to increase the value of carbon fiber for wind turbines blades, and other compressive strength driven designs, is to identify pathways to increase its cost-specific compressive strength. A finite element model has been developed to evaluate the predictiveness of current finite element methods and to lay groundwork for future studies that focus on improving the cost-specific compressive strength. Parametric studies are conducted to understand which uncertainties in the model inputs have the greatest impact on compressive strength predictions. Furthermore, a statistical approach is also presented that enables the micromechanical model, which is deterministic, to efficiently account for statistical variability in the fiber misalignment present in composite materials; especially if the results from the hexagonal and square pack models are averaged. The model was found to agree well with experimental results for a Zoltek PX-35 pultrusion. The sensitivity studies suggest that the fiber packing and the interface shear strength have the greatest impact on compressive strength prediction for the fiber reinforced polymer studied here. Based on the performance of the modeling approach presented in this work, it is deemed sufficient for future work which will seek to identify carbon fiber composites with improved cost-specific compressive strength.

36 MATERIALS SCIENCE↗

Exploring density and strength variations in asteroid 16 Psyche’s composition with 3D hydrocode modeling of its deepest impact structure

Asteroid 16 Psyche is the largest metallic Main Belt Asteroid and is the subject of a forthcoming NASA mission. The composition of Psyche is still unknown and subject of recent debate. In particular, how much porosity is within Psyche, along with how much of Psyche consists of non-metallic versus metallic materials, are central questions to the issue of Psyche’s composition. If Psyche is indeed predominantly composed of metallic materials, it would need to have considerable porosity (~ 30%–50%) for a composition consistent with its expected bulk density (~ 3.7–4.1 g/cm). In this work, we vary the density and strength of Psyche by including uniform and layered fields of pseudo-microporosity, in addition to investigating the presence of macroscopic voids, i.e., spaces larger than the size of the simulation’s mesh cells, in rubble-pile configurations. Further, all configurations result in bulk densities within the uncertainties of measured values, however the strength of Psyche and the distribution of pseudo-pores are varied. Through 3D computational models of Psyche’s deepest impact structure, we show that Psyche’s composition is unlikely to contain only pseudo-microporosity. Rather, rubble pile structures, which include macroscopic voids, are shown to match the crater’s measured aspect ratio better than simulations of structures that included only pseudo-microporosity.

3D↗

Thermal and electric multidomain dynamic model for integration of power grid distribution with behind-the-meter devices

As renewable energy sources like solar and wind power become more integrated into the grid, coordinated control of behind-the-meter devices is crucial for enhancing grid flexibility and reliability and for meeting cost targets, with standardized models being developed to support this transition. The increasing flexibility and uncertainty of integrated renewable energy grids, along with interactions between various subsystems, make traditional steady-state modeling insufficient to capture transient and dynamic behaviors. Current models (e.g., composite load and battery equivalent models) focus on thermodynamic or electrical characteristics but overlook critical electromechanical interactions. This limits the ability to share performance information for grid services and hampers fast dynamic simulations. In addition, motor stalling is usually triggered by a fault event and attributed to the characteristics of the mechanical torque of the motor, resulting in absorption of a large amount of reactive power during the stalling period. Further, this significant withdrawal of reactive power will deteriorate the dynamic voltage stability of power grids and cause delayed voltage recovery. Therefore, an in-depth modeling of the thermodynamics or mechanical torque is essential to study the impacts of the realistic torque characteristics of those behind-the-meter devices on power system voltage stability. This study developed a dynamic multidomain model for building HVAC systems, such as air-source heat pumps, to simulate their thermal and electrical responses to grid transients. The model can accurately predict power metrics with a mean absolute percentage error of 10%, by validating against with power system computer-aided design performance data. Case studies demonstrate the model capability of capturing the transient response to sudden voltage changes, rapid load fluctuations, and system shutdowns respectively. During a sudden voltage drop (30% for 0.1s), a fully loaded heat pump’s motor speed dropped, continued declining, and shut down after 3.6s, with severe power oscillations and a torque spike. A partially loaded unit experienced temporary oscillations but stabilized. Under higher building loads, compressor speed increased from 64% to 100%, with power and torque rising before stabilizing. In safety-triggered shutdowns, power decreased after minor fluctuations, and torque briefly spiked before dropping to zero.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multiscale Aerosol Modeling Across Space and Composition (Final Report)

The objective of this project was to harness the capabilities of our unique particle-resolved aerosol model PartMC as an integrating tool between models and measurements across scales. This particle-resolved model explicitly resolves aerosol aging processes that must be approximated in large-scale models, making it ideal for quantifying structural uncertainty and rigorously deriving simplified parameterizations (“coarse graining”) to be used in large-scale models. It also directly connects with laboratory and field measurements at both particle and bulk scales. The significant accomplishments of this project are as follows: 1. Advancing the state of the art in particle-resolved modeling; 2. Connecting modeling with ASR/ARM measurements; 3. Bridging from the process level to aerosol impacts on the global scale; 4. Community engagement through leading and participating in ASR program activities and publishing a review paper on aerosol mixing state that synthesizes experimental and modeling perspectives.

58 GEOSCIENCES↗

Vadose Zone Model for B-63 Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for U Plant Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for M Pond Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for U Farm Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for T Plant Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for A Farms Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for A Trenches Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The scope of this ECF is to document the development and results of the A Trenches Area vadose zone model. The A Trenches Area model covers the region between the 200 East Area and southwest of the 216-B-3 Pond. The primary waste sites in this area are cribs associated with PUREX Plant (202-A).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for LW Crib Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B Plant Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The scope of this ECF is to document the development and results of the B Plant Area vadose zone model. The B Plant Area model encompasses the region around B Plant (221-B) in the western part of 200 East Area. The plant was used to separate plutonium from irradiated fuel using the bismuth-phosphate process from 1945 to 1956, and for strontium and cesium recovery from 1968 to 1985.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B-3 Pond for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The scope of this ECF is to document the development and results of the B-3 Pond vadose zone model. The B-3 Pond model covers the main lobe of the 216-B-3 Pond System located in a topographic low east of the 200 East Area. The pond system operated from 1945 to 1997 and received effluents from the Plutonium Uranium Extraction Plant, B Plant, 284-E Powerhouse, and other 200 East Area facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for S Farms Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed "dry" in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chloiine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thmium-230 (Th-230). The simulation time struts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP) simulator, officially named the exascale Subsurface Transport Over Multiple Phases ( eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user's guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User 's Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗