Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Communication Network Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Government-to-government cooperation in space station development

A memoranda of understanding was recently signed between the United States (NASA) and three international Space Station partners - Canada, European Space Agency (ESA), and Japan. The international partners are performing parallel Phase B preliminary design studies, concurrent with the U.S., on their proposed elements/systems for possible integration and operation with the U.S. Space Station System complex. During the 21-month Space Station Phase B study, a large amount of technical interface data will have to be transferred between the U.S. and the international partners. Scheduled bilateral technical coordination meetings will also be held. The coordination and large number of interfaces required to integrate the international requirements into the Space Station require a clean interface management organizational structure and operation procedures to accomplish the integration task. The international coordination management organizational structure, management tools, and communications network are discussed including the proposed international elements/systems being studied by the international partners.

Nassiff, S. H.↗

TDRS MA phased-array antenna simulations

The NASA's Space Network (SN) nominal user services are prescheduled to allocate service type and required equipment to a user of the network. The availability of a resource for a given user is then communicated back to the user prior to requested service time. A proposed Demand Assignment Multiple Access (DAMA) system for NASA's SN to make it easier to allow a real time changes to add new user to the service schedule, is presented. The goals of the project are to improve the current operational modes by (1) reducing the support overhead required to maintain the overall scheduling requirements in this area; (2) allowing for more users to access the system especially those who traditionally have not considered SN access available to them; and (3) providing additional scheduling flexibility.

Caballero, Ruben↗

Moving multiple sinks through wireless sensor networks for lifetime maximization.

Unattended sensor networks typically watch for some phenomena such as volcanic events, forest fires, pollution, or movements in animal populations. Sensors report to a collection point periodically or when they observe reportable events. When sensors are too far from the collection point to communicate directly, other sensors relay messages for them. If the collection point location is static, sensor nodes that are closer to the collection point relay far more messages than those on the periphery. Assuming all sensor nodes have roughly the same capabilities, those with high relay burden experience battery failure much faster than the rest of the network. However, since their death disconnects the live nodes from the collection point, the whole network is then dead. We consider the problem of moving a set of collectors (sinks) through a wireless sensor network to balance the energy used for relaying messages, maximizing the lifetime of the network. We show how to compute an upper bound on the lifetime for any instance using linear and integer programming. We present a centralized heuristic that produces sink movement schedules that produce network lifetimes within 1.4% of the upper bound for realistic settings. We also present a distributed heuristic that produces lifetimes at most 25:3% below the upper bound. More specifically, we formulate a linear program (LP) that is a relaxation of the scheduling problem. The variables are naturally continuous, but the LP relaxes some constraints. The LP has an exponential number of constraints, but we can satisfy them all by enforcing only a polynomial number using a separation algorithm. This separation algorithm is a p-median facility location problem, which we can solve efficiently in practice for huge instances using integer programming technology. This LP selects a set of good sensor configurations. Given the solution to the LP, we can find a feasible schedule by selecting a subset of these configurations, ordering them via a traveling salesman heuristic, and computing feasible transitions using matching algorithms. This algorithm assumes sinks can get a schedule from a central server or a leader sink. If the network owner prefers the sinks make independent decisions, they can use our distributed heuristic. In this heuristic, sinks maintain estimates of the energy distribution in the network and move greedily (with some coordination) based on local search. This application uses the new SUCASA (Solver Utility for Customization with Automatic Symbol Access) facility within the PICO (Parallel Integer and Combinatorial Optimizer) integer programming solver system. SUCASA allows rapid development of customized math programming (search-based) solvers using a problem's natural multidimensional representation. In this case, SUCASA also significantly improves runtime compared to implementations in the ampl math programming language or in perl.

54 ENVIRONMENTAL SCIENCES↗

Information Technology and the Autonomous Control of a Mars In-Situ Propellant Production System

With the rapidly increasing performance of information technology, i.e., computer hardware and software systems, as well as networks and communication systems, a new capability is being developed that holds the clear promise of greatly increased exploration capability, along with dramatically reduced design, development, and operating costs. These new intelligent systems technologies, utilizing knowledge-based software and very high performance computer systems, will provide new design and development tools, scheduling mechanisms, and vehicle and system health monitoring capabilities. In addition, specific technologies such as neural nets will provide a degree of machine intelligence and associated autonomy which has previously been unavailable to the mission and spacecraft designer and to the system operator. One of the most promising applications of these new information technologies is to the area of in situ resource utilization. Useful resources such as oxygen, compressed carbon dioxide, water, methane, and buffer gases can be extracted and/or generated from planetary atmospheres, such as the Martian atmosphere. These products, when used for propulsion and life-support needs can provide significant savings in the launch mass and costs for both robotic and crewed missions. In the longer term the utilization of indigenous resources is an enabling technology that is vital to sustaining long duration human presence on Mars. This paper will present the concepts that are currently under investigation and development for mining the Martian atmosphere, such as temperature-swing adsorption, zirconia electrolysis etc., to create propellants and life-support materials. This description will be followed by an analysis of the information technology and control needs for the reliable and autonomous operation of such processing plants in a fault tolerant manner, as well as the approach being taken for the development of the controlling software. Finally, there will be a brief discussion of the verification and validation process so crucial to the implementation of mission-critical software.

Gross, Anthony R.↗

Latency Minimizing Tasking for Information Processing Systems

Real-time cyber-physical systems and information processing clusters require system designers to consider the total latency involved in collecting and aggregating data. For example, applications such as wild-fire monitoring require data to be presented to users in a timely manner. However, most models and algorithms for sensor networks have focused on alternative metrics such as energy efficiency. In this paper, we present a new model of sensor network aggregation that focuses on total latency. Our model is flexible and enables users to configure varying transmission and computation time on a node-by-node basis, and thus enables the simulation of complex computational phenomena. In addition, we present results from three tasking algorithms that trade-off local communication for overall latency performance. These algorithms are evaluated in simulated networks of up to 200 nodes. We've presented an aggregation-focused model of sensor networks that can be used to study the trade-offs between computational coverage and total latency. Our model explicitly takes into account transmission and computation times, and enables users to define different values for the basestation. In addition, we've presented three different tasking algorithms that operate over model to produce aggregation schedules of varying quality. In the future, we expect to continue exploring distributed tasking algorithms for information processing systems. We've shown that the gap between highly optimized schedules that use global information is quite large relative to our distributed algorithms. This gives us encouragement that future distributed tasking algorithms can still make large gains.

99 GENERAL AND MISCELLANEOUS↗

An overview of the GOLD experiment between the ETS-6 satellite and the table mountain facility

The Ground/Orbiter Lasercomm Demonstration (GOLD) is a demonstration of optical communications between the Japanese Engineering Test Satellite (ETS-VI) and an optical ground transmitting and receiving station at the Table Mountain Facility in Wrightwood, California. Laser transmissions to the satellite are performed for approximately 4 hours every third night when the satellite is at apogee above Table Mountain. The experiment requires the coordination of resources at the Communications Research Laboratory (CRL), JPL, the National Aeronautics and Space Development Agency (NASDA) Tsukuba tracking station, and NASA's Deep Space Network at Goldstone, California, to generate and transmit real-time commands and receive telemetry from the ETS-VI. Transmissions to the ETS-VI began in November 1995 and are scheduled to last into the middle of January 1996, when the satellite is expected to be eclipsed by the Earth's shadow for a major part of its orbit. The eclipse is expected to last for about 2 months, and during this period there will be limited electrical power available on board the satellite. NASDA plans to restrict experiments with the ETS-VI during this period, and no laser transmissions are planned. Posteclipse experiments are currently being negotiated. GOLD is a joint NASA-CRL experiment that is being conducted by JPL in coordination with CRL and NASDA.

Wilson, K. E.↗

An Overview of the GOLD Experiment Between the ETS-6 Satellite and the Table Mountain Facility

The Ground/Orbiter Lasercomm Demonstration is a demonstration of optical communications between the Japanese Engineering Test Satellite (ETS-VI) and an optical ground transmitting and receiving station at the Table Mountain Facility in Wrightwood, California. Laser transmissions to the satellite are performed for approximately 4 hours every third night when the satellite is at apogee above Table Mountain. The experiment requires the coordination of resources at the Communications Research Laboratory (CRL), JPL, the National Aeronautics and Space Development Agency (NASDA) Tsukuba tracking station, and NASA's Deep Space Network at Goldstone, California, to generate and transmit real-time commands and receive telemetry from the ETS-VI. Transmissions to the ETS-VI began in November 1995 and are scheduled to last into the middle of January 1996, when the satellite is expected to be eclipsed by the Earth's shadow for a major part of its orbit. The eclipse is expected to last for about 2 months, and during this period there will be limited electrical power available on board the satellite. NASDA plans to restrict experiments with the ETS-VI during this period, and no laser transmissions are planned. Posteclipse experiments are currently being negotiated. GOLD is a joint NASA-CRL experiment that is being conducted by JPL in coordination with CRL and NASDA.

Wilson, K. E.↗

Multigraph-based Routing in Delay Tolerant Networks: An Alternative to Contact Graph Routing

Satellites are leaving the realms of niche use, extending our day-to-day networked infrastructure to space – thereby forcing a generalization of network architectures. The Delay Tolerant Networking (DTN) protocol is being developed to give rise to this new Solar System Internet. Predominantly, DTNs in space use globally-distributed contact tables to compute routes. In this paper, we propose and analyze a novel optimized approach for route computations that improves upon traditional approaches. As the general DTN will always include some scheduled links, our new algorithm enables greater scalability and practicality of DTN routing. These contact tables include windows when two nodes can communicate and were classically organized into a contact graph, where the vertices represent contact opportunities. Because the complexity of a contact graph grows with the number of contacts, pathfinding on it does not scale. A new structure using multigraphs with the same data is proposed. We show that a multigraph-based approach, which we call contact multigraph routing, exhibits performance superior to routing based on contact graphs, allowing greater scaling to schedule-based routing. In this paper, the multigraph-based algorithm is detailed and a proof is included showing it outperforms the previous algorithm given the same input. Pseudocode is included, as are simulation results. We conclude with suggested future work.

Delay Tolerant Networking↗

Delay-Throughput Performance of the Deep-Space Ka-band Link

In this paper, performance of a first-in, first-out (FIFO), selective retransmission scheme for the deep-space Ka-band link is presented and compared to the performance of a comparable X-band link. In this analysis, 16 months of water vapor radiometer (WVR) and advanced water vapor radiometer (AWVR) data from the three Deep Space Network (DSN) Communication Complexes (DSCC) were used to emulate weather effects on X-band and Ka-band links from Mars. Mars Reconnaissance Orbiter (MRO) X-band and Ka-band telecommunications parameters were used for spacecraft telecommunications capabilities. One pass per week per complex was selected from MRO's Deep Space Network (DSN) schedule from April 1, 2006 to August 31, 2007 for a total of 207 passes (69 passes per complex) for this analysis. For each pass both X-band and Ka-band links were designed using at most two data rates so that the expected pass capacity would be maximized subject to a minimum availability requirement (MAR). In conjunction with the WVR/AWVR data, elevation profiles of the selected passes and models for the performance of the antennas in the DSN were used to emulate the performance of both links. It was assumed that the retransmission of the data takes place not on the same pass as the original transmission but during subsequent passes. The data collected before a pass was assumed to be a fraction of the expected capacity of the pass as calculated through the link design process. Infinite spacecraft storage was assumed to obtain an upper bound on the spacecraft storage requirement. The independent parameters of this analysis were MAR and the ratio of data collected before a pass to the expected pass capacity. Since the selected passes did not occur at regular intervals, the delay in this analysis was measured in terms of number of passes. The throughput was measured in terms of number of bits received successfully on the ground. The results indicate that reasonable delay performance could be achieved with very high throughput for relatively low MAR values for data collection to expected pass capacity ratio of around 97% for Ka-band. The results indicate that, except for very low average delay requirements, the Ka-band link provides more than twice the throughput of the X-band link for the same amount of power consumed by the spacecraft. In addition, the results indicate that the required storage onboard the spacecraft is not prohibitive and good performance could be achieved by using a buffer size less than three times the maximum amount of data collected before a pass.

Shambayati, Shervin↗

Delay-Throughput Performance the Deep-Space Ka-Band Link

In this paper, performance of a first-in, first-out (FIFO), selective retransmission scheme for the deep-space Ka-band link is presented and compared to the performance of a comparable X-band link. In this analysis, 16 months of water vapor radiometer (WVR) and advanced water vapor radiometer (AWVR) data from the three Deep Space Network (DSN) Communication Complexes (DSCC) were used to emulate weather effects on X-band and Ka-band links from Mars. Mars Reconnaissance Orbiter (MRO) X-band and Ka-band telecommunications parameters were used for spacecraft telecommunications capabilities. One pass per week per complex was selected from MRO's Deep Space Network (DSN) schedule from April 1, 2006 to August 31, 2007 for a total of 207 passes (69 passes per complex) for this analysis. For each pass both X-band and Ka-band links were designed using at most two data rates so that the expected pass capacity would be maximized subject to a minimum availability requirement (MAR). In conjunction with the WVR/AWVR data, elevation profiles of the selected passes and models for the performance of the antennas in the DSN were used to emulate the performance of both links. It was assumed that the retransmission of the data takes place not on the same pass as the original transmission but during subsequent passes. The data collected before a pass was assumed to be a fraction of the expected capacity of the pass as calculated through the link design process. Infinite spacecraft storage was assumed to obtain an upper bound on the spacecraft storage requirement. The independent parameters of this analysis were MAR and the ratio of data collected before a pass to the expected pass capacity. Since the selected passes did not occur at regular intervals, the delay in this analysis was measured in terms of number of passes. The throughput was measured in terms of number of bits received successfully on the ground. The results indicate that reasonable delay performance could be achieved with very high throughput for relatively low MAR values for data collection to expected pass capacity ratio of around 97% for Ka-band. The results indicate that, except for very low average delay requirements, the Ka-band link provides more than twice the throughput of the X-band link for the same amount of power consumed by the spacecraft. In addition, the results indicate that the required storage onboard the spacecraft is not prohibitive and good performance could be achieved by using a buffer size less than three times the maximum amount of data collected before a pass.

Shambayati, Shervin↗

TechEdSat-11: Prototyping Autonomous Communications in Orbit

Cognitive Engine 1 (CE-1) is a state-of-the-art automated system designed to manage routine operations and respond to adverse events without requiring human operator input. CE-1 will optimize scheduling capabilities, detect and react to link failures, and ensure data delivery deadlines are met efficiently. Seamless roaming between government and commercial providers will allow for a robust and cost-effective network. TechEdSat-11 will demonstrate two key components of CE-1: User Initiated Services (UIS) and Delay Tolerant Networking (DTN). The first phase of the experiment will use UIS to automate on-demand scheduling of a commercial S-band ground station. Later phases of the experiment will demonstrate DTN store-and-forward and space internetworking capabilities through the TechEdSat-11 S-band radio. This paper will discuss the CE-1 main components relevant to the experiment, the flight and ground software architecture, experiment concept of operations and preliminary results.

Rachel Dudukovich↗

Scalable and Actionable Performance Measures for Traffic Signal Systems using Probe Vehicle Trajectory Data

Scalable and actionable performance measures for traffic signal systems provide opportunities for practitioners to measure and improve the transportation network. Historically, traffic signal improvements have relied on scheduled signal retiming based on limited data collection, or on the public to call and alert engineers of an issue. This inefficient method of improving signal timing led to the creation of automated traffic signal performance measures (ATSPMs). These metrics rely on expensive infrastructure, including detection and communications, which has produced barriers for numerous agencies to fully adopt. Recently, third-party data providers have begun to release vehicle trajectory data, which allows for enhanced signal metrics with no investment in physical equipment. The purpose of this study is to demonstrate the use of these data and summarize the scalability of the created metrics. This work builds on previous efforts to quantify signal performance on nine intersections in Michigan, U.S. Ten signalized corridors in Columbus, Ohio, were chosen to scale a performance assessment using crowdsourced trajectory data. A total of 136 intersections were assessed in 2-h intervals using data from all weekdays in 2017. High-level corridor summary metrics including average percent of vehicles stopping (18%–32%), average delay (9.4–20.5 s), and level of travel time reliability (1.23–2.73) were calculated for each corridor direction. Intersection-level metrics were also introduced, which can be used by practitioners to identify problems, improve signal timings, and prioritize future infrastructure investments.

99 GENERAL AND MISCELLANEOUS↗

Selected Research and Development Topics on Aerospace Communications at NASA Glenn Research Center

This presentation discusses some of the efforts on communications RD that have been performed or are currently underway at NASA Glenn Research Center. The primary purpose of this presentation is to outline some RD topics to serve as talking points for a Technical Interchange Meeting with the Ohio State University. The meeting is scheduled to take place at The ElectroScience Laboratory of the Ohio State University on February 24, 2014.

Aerospace Communications↗

Commercialization and Standardization Progress Towards an Optical Communications Earth Relay

NASA is planning to launch the next generation of a space based Earth relay in 2025 to join the current Space Network, consisting of Tracking and Data Relay Satellites in space and the corresponding infrastructure on Earth. While the requirements and architecture for that relay satellite are unknown at this time, NASA is investing in communications technologies that could be deployed to provide new communications services. One of those new technologies is optical communications. The Laser Communications Relay Demonstration (LCRD) project, scheduled for launch in 2018 as a hosted payload on a commercial communications satellite, is a critical pathfinder towards NASA providing optical communications services on the next generation space based relay. This paper will describe NASA efforts in the on-going commercialization of optical communications and the development of inter-operability standards. Both are seen as critical to making optical communications a reality on future NASA science and exploration missions. Commercialization is important because NASA would like to eventually be able to simply purchase an entire optical communications terminal from a commercial provider. Inter-operability standards are needed to ensure that optical communications terminals developed by one vendor are compatible with the terminals of another. International standards in optical communications would also allow the space missions of one nation to use the infrastructure of another.

lasers↗

Prosumer-Based Distributed Autonomous Cyber-Physical Architecture for Ultra-reliable Green Electricity Internetworks

This project, the first of its kind, proposes a new architecture for decentralized management and control of future electricity grids with millions of decision-makers. These economically motivated decision-makers are called prosumers (producer-consumers). Prosumers can produce, consume, and/or store electricity and make strategic decisions enabled by communication networks. Prosumers can be as large as a utility or as small as an electric vehicle or a smart house with a home energy management system. The report first provides an impression of the functionality envisioned in prosumer-based smart grids and the philosophy behind their design. The architecture is intended to provide a platform for many possibilities in service definition and trading. The functionality of the architecture is identified by functional and non-functional requirements related to decentralized control and optimization. In this report, three key technologies are proposed for enabling distributed operation and control in prosumer-based smart grids. The first technology is a cyber-infrastructure model, which provides an underlying framework for distributed communication and computation in smart grids. The model is based on service-oriented computing paradigm and is compatible with the existing service-oriented technologies, used in enterprise computing, such as Web Services. However, it extends these technologies for handling the hard-to-predict real-time aspects of smart grids by introducing resource-aware service deployment and quality-of-service (QoS)-aware service monitoring phases. The second technology is a distributed frequency regulation (DFR) framework, which can ensure midterm frequency stability while avoiding inter-area oscillations and using a limited control effort. DFR can complement today’s Automatic Generation Control (AGC) systems by providing an advanced protocol for coordination between AGC systems of different prosumers. The main advantage of the DFR technology is that each frequency regulator only needs to communicate with its neighbors in the network. The efficacy of DFR is shown through simulations on real-world electric energy systems of different scale and complexity. The third technology introduced in this project is decentralized unit commitment (DUC) for heterogeneous prosumers. The DUC technology is a new scalable method for formulating and solving a distributed energy scheduling problem. The algorithm extends the alternating direction method of multipliers (ADMM) and includes several heuristics to mitigate oscillations and traps in local optimality that result from the nonconvexity of unit commitment. The main advantages of DUC is that it can solve the unit commitment problem for large-scale power systems of more than 3,000 nodes faster than the state-of-the-art, centralized methods, and that it is scalable to energy scheduling problems of prosumer systems of any size. In summary, this report illustrates that the distributed architecture for prosumer-based power grids is an enabler of transforming aging power grids into sustainable, resilient, reliable, and efficient smart grids with some desirable functionalities similar to the Internet.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Space Communication Network Capabilities via Web Portal Technologies

We have developed a service portal prototype as part of an investigation into the feasibility of using Java portlet technology as a means of providing integrated access to NASA communications network services. Portal servers provide an attractive platform for this role due to the various built-in collaboration applications they can provide, combined with the possibility to develop custom inter-operating portlets to extent their functionality while preserving common presentation and behavior. This paper describes various options for integration of network services related to planning and scheduling, and results based on use of a popular open-source portal framework. Plans are underway to develop an operational SCaN Service Portal, building on the experiences reported here.

web services↗

BRAINSTACK – A Platform for Artificial Intelligence & Machine Learning Collaborative Experiments on a Nano-Satellite

As space missions continue to become more ambitious, complex, and distant to Earth, the need for advanced on-board intelligent decision making to guide everything from mission operations to fault detection and recovery has become a major front of space research. While the prevalence of research on such Artificial Intelligence / Machine Learning (AI/ML) modules has exploded, the capacity to experimentally validate such modules in space in a rapid and inexpensive format has not. To this end, the Nano Orbital Workshop (NOW) group at NASA Ames Research Center has been at the forefront of performing initial flight evaluation tests of ‘commercially’ available AI/ML computational platforms via the TechEdSat (TES-n) flight series as part of what is programmatically referred to as the BRAINSTACK. BRAINSTACK will provide an orbital AI/ML evaluation laboratory where computational experiments are pre-loaded into memory prior to launch, and then executed as desired during the mission, with results reported back and program tweaks or new data sets uploaded as needed. Processors selected as part of the BRAINSTACK are of ideal size, packaging, and power consumption for easy integration into a cube satellite structure. These experiments have included the evaluation of small, high-performance GPUs and more recently, neuromorphic processors in LEO operations. Neuromorphic processors are of particular interest due to their superior computational power efficiency over GPUs. The first TES-n flight test of an Intel first-generation Loihi neuromorphic processor launched on January 13, 2022 and continues to operate in orbit despite almost no space environment modifications. The Intel Loihi Gen-1 is characterized by a 14nm 128-core Spiking Neural Network (SNN) able to support on-chip training. This experiment utilized a Loihi packaged in the ‘Kapoho Bay’ USB module, providing a relatively straight-forward interface to the bus avionics system. The Kapoho Bay was in turn managed by a host Intel Pentium single-board computer to handle scheduling of the AI/ML application payloads, and communications with the satellite vehicle manager. The recently released Intel Loihi Gen-2, able to support integer-valued spike payloads and produced using 7nm process, will form part of the basis of the evolving BRAINSTACK in the upcoming three TES-n/NOW flights. Additionally, it is planned to measure the radiation environment these processors experience to understand any degradation or computational artifacts caused by long term space radiation exposure on these novel architectures. This evolving flexible and collaborative environment involving various research teams across NASA and other organizations is intended to be a convenient orbital test platform from which many anticipated future space AI/ML applications may be initially tested.

Artificial Intelligence↗

BRAINSTACK – A Platform for Artificial Intelligence & Machine Learning Collaborative Experiments on a Nano-Satellite

As space missions continue to become more ambitious, complex, and distant to Earth, the need for advanced on-board intelligent decision making to guide everything from mission operations to fault detection and recovery has become a major front of space research. While the prevalence of research on such Artificial Intelligence / Machine Learning (AI/ML) modules has exploded, the capacity to experimentally validate such modules in space in a rapid and inexpensive format has not. To this end, the Nano Orbital Workshop (NOW) group at NASA Ames Research Center has been at the forefront of performing initial flight evaluation tests of ‘commercially’ available AI/ML computational platforms via the TechEdSat (TES-n) flight series as part of what is programmatically referred to as the BRAINSTACK. BRAINSTACK will provide an orbital AI/ML evaluation laboratory where computational experiments are pre-loaded into memory prior to launch, and then executed as desired during the mission, with results reported back and program tweaks or new data sets uploaded as needed. Processors selected as part of the BRAINSTACK are of ideal size, packaging, and power consumption for easy integration into a cube satellite structure. These experiments have included the evaluation of small, high-performance GPUs and more recently, neuromorphic processors in LEO operations. Neuromorphic processors are of particular interest due to their superior computational power efficiency over GPUs. The first TES-n flight test of an Intel first-generation Loihi neuromorphic processor launched on January 13, 2022 and continues to operate in orbit despite almost no space environment modifications. The Intel Loihi Gen-1 is characterized by a 14nm 128-core Spiking Neural Network (SNN) able to support on-chip training. This experiment utilized a Loihi packaged in the ‘Kapoho Bay’ USB module, providing a relatively straight-forward interface to the bus avionics system. The Kapoho Bay was in turn managed by a host Intel Pentium single-board computer to handle scheduling of the AI/ML application payloads, and communications with the satellite vehicle manager. The recently released Intel Loihi Gen-2, able to support integer-valued spike payloads and produced using 7nm process, will form part of the basis of the evolving BRAINSTACK in the upcoming three TES-n/NOW flights. Additionally, it is planned to measure the radiation environment these processors experience to understand any degradation or computational artifacts caused by long term space radiation exposure on these novel architectures. This evolving flexible and collaborative environment involving various research teams across NASA and other organizations is intended to be a convenient orbital test platform from which many anticipated future space AI/ML applications may be initially tested.

Artificial Intelligence↗