Commissioning of the HELIOS spectrometer.

This paper describes the implementation and commissioning of a device based on a new concept for measurements of nuclear reactions in inverse kinematics. The HELIcal Orbit Spectrometer, HELIOS, was commissioned at Argonne National Laboratory by studying the {sup 28}Si(d,p){sup 29}Si reaction in inverse kinematics. This experiment served as a proof of principle for this previously untested concept, and was used to verify the response and performance characteristics of HELIOS.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Cognitive barriers during monitoring-based commissioning of buildings

Monitoring-based commissioning (MBCx) is a continuous building energy management process used to optimize energy performance in buildings. Although monitoring-based commissioning (MBCx) can reduce energy waste by up to 20%, many buildings still underperform due to issues such as unnoticed system faults and inefficient operational procedures. While there are technical barriers that impede the MBCx process, such as data quality, the focuses of this paper are the non-technical, behavioral and organizational, barriers that contribute to issues initiating and implementing MBCx. In particular, this paper discusses cognitive biases, which can lead to suboptimal outcomes in energy efficiency decisions, resulting in missed opportunities for energy savings. This paper provides evidence of cognitive biases in decisions during the MBCx process using qualitative data from over 40 public and private sector organizations. The results describe barriers resulting from cognitive biases, listed in descending order of occurrence, including: risk aversion, social norms, choice overload, status quo bias, information overload, professional bias, and temporal discounting. Building practitioners can use these results to better understand potential cognitive biases, in turn allowing them to establish best practices and make more informed decisions. Finally, researchers can use these results to empirically test specific decision interventions and facilitate more energy efficient decisions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Commissioning of the new H{sup -} source for Linac4

As part of the CERN accelerator complex upgrade, a new linear accelerator for H{sup -} (Linac4) will start its operation in 2014. The source for this linac will be a 2 MHz rf driven H{sup -} source which is a copy of the very successful source from DESY. In this paper the design and the first results of the commissioning are reported. The commissioning has progressed successfully, and no major obstacles have been identified which will prevent reaching the goal of 80 mA H{sup -} beam current, 45 keV beam energy, 0.4 ms pulse length, and 2 Hz repetition rate. The source is producing up until now a stable beam of 23 mA, 35 keV, and with a repetition rate of 0.83 Hz.

43 PARTICLE ACCELERATORS↗

Commissioning Of The MINER{nu}A Tracking Prototype

MINER{nu}A is a neutrino scattering experiment that uses the NuMI beamline at Fermilab. A Tracking Prototype was assembled, commissioned and tested at Fermilab before moving it into the NuMI beamline. A description of some of the main commissioning activities is presented here.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

MINER{nu}A Test Beam Commissioning

MINER{nu}A Main INjector ExpeRiment {nu}-A is a high-statistic neutrino scattering experiment that will ran in the NuMI Beam Hall at Fermilab. To calibrate the energy response of the MINER{nu}A detector, a beamline is being designed for the MINER{nu}A Test Beam Detector (TBD). The TBD is a replica of the full MINER{nu}A detector at small scale for calibration studies of the main detector. The beamline design consists of the following parts: a copper target, used to generate tertiaries from an incoming secondary beam; a steel collimator for tertiaries, which also serves as a dump for the incoming beam; a time of fight system (scintillator planes); four wire chambers, for angle measurements and tracking; and two dipole magnets, used as an spectrometer. During last October, the first commissioning run of the MINER{nu}A Test Beam took place in the Meson Test Beam Facility at Fermilab. We commissioned the target and collimator of the new tertiary beamline.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning of the T2K Beamline

The initial commissioning of the beam line for the T2K long baseline neutrino experiment was carried out in April and May of 2009. This paper contains an overview of the beam line components and presents initial results from the beam line commissioning.

43 PARTICLE ACCELERATORS↗

Commissioning and first operation of the low-beta triplets and their electrical feed boxes at the Large Hadron Collider

The insertion regions located around the four interaction points of the Large Hadron Collider (LHC) are mainly composed of the low-{beta} triplets, the separation dipoles and their respective electrical feed-boxes (DFBX). The low-{beta} triplets are Nb-Ti superconductor quadrupole magnets, which operate at 215 T/m in superfluid helium at a temperature of 1.9 K. The commissioning and the first operation of these components have been performed. The thermo-mechanical behavior of the low-{beta} triplets and DFBX were studied. Cooling and control systems were tuned to optimize the cryogenic operation of the insertion regions. Hardware commissioning also permitted to test the system response. This paper summarizes the performance results and the lessons learned.

43 PARTICLE ACCELERATORS↗

Construction and Beam Commissioning of J-PARC Hadron Experimental Facility

J-PARC Hadron Experimental Facility is designed as a multi-purpose experimental facility for particle and nuclear physics experiments using high-intensity secondary particles (Kaons, pions, and so on) produced by 50 GeV-15 muA (750 kW) primary proton beams. Currently, three secondary beam lines (K 1.8 BR, K 1.8, and KL) have been constructed. The first beam extraction from 50 GeV proton synchrotron was on January 27{sup th}, 2009, and the beam commissioning of the primary and secondary beam lines are on going. The present article reports construction status and beam commissioning of Hadron Experimental Facility in detail.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Commissioning of a Soft X-ray Beamline PF-BL-16A with a Variable-Included-Angle Varied-Line-Spacing Grating Monochromator

The design and commissioning of a new soft X-ray beamline, BL-16A, at the Photon Factory is presented. The beamline consists of a pre-focusing mirror, an entrance slit, a variable-included-angle varied-line-spacing plane grating monochromator, and a post-focusing system as usual, and provides circularly and linearly polarized soft X rays in the energy range 200-1500 eV with an APPLE-II type undulator. The commissioning procedure for the beamline optics is described in detail, especially the check of the focal position for the zero-th order and diffracted X rays.

43 PARTICLE ACCELERATORS↗

Preliminary Commissioning and Performance of the Soft X-ray Micro-characterization Beamline at the Canadian Light Source

The Soft X-ray Micro-characterization Beamline (SXRMB) is a medium energy, bending magnet based beamline, designed to cover an energy range of 1.7-10 keV using two sets of crystals--InSb(111) and Si(111). The design goal is to deliver a flux of 2x10{sup 11} photons sec{sup -1}/100 mA with a resolution up to 10,000 for X-ray Absorption Spectroscopy. A KB mirror stage is designed to provide microprobe capability, with a spot size of 10x10 {mu}m{sup 2} and a flux of >10{sup 9} at the microprobe station. The beamline has been in the commissioning phase since 2008, and access to the X-ray absorption endstation is now open to general users. The optical commissioning and performance of the beamline is presented with some early experimental results.

43 PARTICLE ACCELERATORS↗

Commissioning and Validation of the First Monte Carlo Based Dose Calculation Algorithm Commercial Treatment Planning System in Mexico

This work presents the beam data commissioning and dose calculation validation of the first Monte Carlo (MC) based treatment planning system (TPS) installed in Mexico. According to the manufacturer specifications, the beam data commissioning needed for this model includes: several in-air and water profiles, depth dose curves, head-scatter factors and output factors (6x6, 12x12, 18x18, 24x24, 42x42, 60x60, 80x80 and 100x100 mm{sup 2}). Radiographic and radiochromic films, diode and ionization chambers were used for data acquisition. MC dose calculations in a water phantom were used to validate the MC simulations using comparisons with measured data. Gamma index criteria 2%/2 mm were used to evaluate the accuracy of MC calculations. MC calculated data show an excellent agreement for field sizes from 18x18 to 100x100 mm{sup 2}. Gamma analysis shows that in average, 95% and 100% of the data passes the gamma index criteria for these fields, respectively. For smaller fields (12x12 and 6x6 mm{sup 2}) only 92% of the data meet the criteria. Total scatter factors show a good agreement (<2.6%) between MC calculated and measured data, except for the smaller fields (12x12 and 6x6 mm{sup 2}) that show a error of 4.7%. MC dose calculations are accurate and precise for clinical treatment planning up to a field size of 18x18 mm{sup 2}. Special care must be taken for smaller fields.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

RF-Plasma Source Commissioning in Indian Negative Ion Facility

The Indian program of the RF based negative ion source has started off with the commissioning of ROBIN, the inductively coupled RF based negative ion source facility under establishment at Institute for Plasma research (IPR), India. The facility is being developed under a technology transfer agreement with IPP Garching. It consists of a single RF driver based beam source (BATMAN replica) coupled to a 100 kW, 1 MHz RF generator with a self excited oscillator, through a matching network, for plasma production and ion extraction and acceleration. The delivery of the RF generator and the RF plasma source without the accelerator, has enabled initiation of plasma production experiments. The recent experimental campaign has established the matching circuit parameters that result in plasma production with density in the range of 0.5-1x10{sup 18}/m{sup 3}, at operational gas pressures ranging between 0.4-1 Pa. Various configurations of the matching network have been experimented upon to obtain a stable operation of the set up for RF powers ranging between 25-85 kW and pulse lengths ranging between 4-20 s. It has been observed that the range of the parameters of the matching circuit, over which the frequency of the power supply is stable, is narrow and further experiments with increased number of turns in the coil are in the pipeline to see if the range can be widened. In this paper, the description of the experimental system and the commissioning data related to the optimisation of the various parameters of the matching network, to obtain stable plasma of required density, are presented and discussed.

43 PARTICLE ACCELERATORS↗

Commissioning of a microprobe-XRF beamline (BL-16) on Indus-2 synchrotron source

We report commissioning of the microprobe-XRF beamline on Indus-2 synchrotron source. The beamline has been recently made operational and is now open for the user's experiments. The beamline comprises of Si(111) double crystal monochromator and Kirkpatrick-Baez focusing optics. The beamline covers wide photon energy range of 4 - 20 keV using both collimated and micro-focused beam modes. The design details and the first commissioning results obtained using this beamline are presented.

43 PARTICLE ACCELERATORS↗

Commissioning of soft and deep X-ray lithography beamline on Indus-2

Soft and Deep x-ray lithography (SDXRL) beamline is commissioned on Indus-2. The beamline can be operated between 1.5 to 20 keV and in white beam mode. Beamline consists of two x-ray mirrors, slits, Be-windows, beam diagnostics and filters assemblies and radiation safety systems. A custom built X-ray scanner is used to create 3-D high aspect ratio micro structures. The paper reports the commissioning results of this beamline.

43 PARTICLE ACCELERATORS↗

The experimental setup of the Interaction in Crystals for Emission of RADiation collaboration at Mainzer Mikrotron: Design, commissioning, and tests

Silicon/germanium flat/bent crystals are thin devices able to efficiently deflect charged particle GeV-energy beams up to a few hundreds of μrad; moreover, high intensity photons can be efficiently produced in the so-called Multi-Volume Reflection (MVR) and Multiple Volume Reflections in One Crystal (MVROC) conditions. In the last years, the research interest in this field has moved to the dynamic studies of light negative leptons in the low energy range: the possibility to deflect negative particles and to produce high intensity γ sources via the coherent interactions with crystals in the sub-GeV energy range has been proved by the ICE-RAD (Interaction in Crystals for Emission of RADiation) Collaboration at the MAinzer MIkrotron (MAMI, Germany). This paper describes the setup used by the ICE-RAD experiment for the crystals characterization (both in terms of deflection and radiation emission properties): a high precision goniometer is used to align the crystals with the incoming beam, while a silicon based profilometer and an inorganic scintillator reconstruct, respectively, the particle position and the photon spectra after the samples. The crystals manufacturing process and their characterization, the silicon profilometer commissioning at the CERN PS T9 beamline, and the commissioning of the whole setup installed at MAMI are presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Status of the SPIRAL2 injector commissioning

The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development and commissioning of an x-ray beam alignment flag for NSLS-II

The NSLS-II Synchrotron Light Source is a 3 GeV electron storage ring recently commissioned and is now entering operations at Brookhaven National Laboratory. One of the major tasks was to commission the six project beamline front ends which required a diagnostic to resolve x-ray beam position for the purpose of beam alignment at low current. Since none of the front ends were outfitted with any x-ray diagnostics in the baseline design, an x-ray beam profile monitor or “flag” that could be easily installed into existing front end vacuum chambers was proposed to satisfy this requirement. Here we present the development of this novel device which utilizes a polycrystalline CVD diamond luminescent screen to produce a visible image of the x-ray beam cross-section and is then captured with a CCD camera.

43 PARTICLE ACCELERATORS↗

Commissioning of horizontal-bend superconducting magnet for Jefferson Lab's 11-GeV super high momentum spectrometer

Commissioning characteristics of the Superconducting High Momentum Spectrometer (SHMS) Horizontal Bend (HB) magnet was presented. Pre-commissioning peer review of the magnet uncovered issues with eddy currents in the thermal shield, resulting in additional testing and modeling of the magnet. A three-stage test plan was discussed. A solution of using a small dump resistor and a warm thermal shield was presented. Analyses illustrated that it was safe to run the magnet to full test current. As a result, the HB magnet was successfully cooled to 4 K and reached its maximum test current of 4000 A.

47 OTHER INSTRUMENTATION↗