Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checklist”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Preliminary Design Reviews Project: SAPHIRE 8

The Preliminary Design Review (PDR) is intended to be performed at the conceptual phase of a design request. The design request is initiated with a Design Specification document which includes a problem statement, design details, a design checklist and supporting documentation and/or projected sample output. In addition to this, the design specification has a chapter devoted to the completion of the Preliminary Design Review. This document describes the process of documentation of the PDR in the Design Specification.

42 ENGINEERING↗

Critical Design Reviews Project: SAPHIRE 8

The Critical Design Review (CDR) is intended to be performed at the phase of the design request immediately before proceeding to implementation of the design request. The design request is initiated with a Design Specification document which includes a problem statement, design details, a design checklist and supporting documentation and/or projected sample output. The document then records the process through the Preliminary Design Review (PDR) and on to the finalized design specification. In addition to this, the design specification has a chapter devoted to the completion of the CDR. This document describes the process of documentation of the CDR in the Design Specification.

42 ENGINEERING↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Boston Architectural College Urban Sustainability Initiative

The Boston Architectural College's Urban Sustainability initiative is a demonstration project as defined by the National Energy Technology Laboratory. BAC's proposed project with the U.S. Department of Energy - NETL, is a large part of that overall initiative. The BAC's Urban Sustainability Initiative is a multi-part project with several important goals and objectives that will have a significant impact on the surrounding neighborhood including: energy conservation, reduction of storm water runoff, generation of power through alternative energy sources, elimination/reduction of BAC carbon footprint, and to create a vehicle for ongoing public outreach and education. Education and outreach opportunities will serve to add to the already comprehensive Sustainability Design courses offered at BAC relative to energy savings, performance and conservation in building design. At the finish of these essential capital projects there will be technical materials created for the education of the design, sustainability, engineering, community development and historic preservation communities, to inform a new generation of environmentally-minded designers and practitioners, the city of Boston and the general public. The purpose of the initiative, through our green renovations program, is to develop our green alley projects and energy saving renovations to the BAC physical plant, to serve as a working model for energy efficient design in enclosed 19th century and 20th century urban sites and as an educational laboratory for teaching ecological and sustainable technologies to students and the public while creating jobs. The scope of our project as it relates to the BAC and the U.S. Department of Energy- NETL combined efforts includes: Task I of the project is Phase II (Green Alley). Task I encompasses various renovation activities that will demonstrate the effectiveness of permeable paving and ground water recharge systems. It will aid in the reduction of storm water runoff into the Charles River Basin in one of its most significantly polluted sections and, will provide a green renovation mechanism for the redirected storm water of a public alley way. This activity is designed to improve the quality of water recharging the ground water and protecting the vulnerable wood pilings under many of the historic masonry buildings in Boston's Back Bay. Sustainable design research and system monitoring opportunities will also be incorporated, providing ongoing tools for public outreach and education through innovative signage and "virtual tour" technology. The monitoring will include a "building performance dash board" that reflects real time operating conditions and improvements in environmental and economic performance to be prominently displayed on the face of our 320 Newbury Street building (approximately 1.5 million people walk by annually). The project site and demonstration area is located at the rear of 951 Boylston Street, Boston, MA 02115 and the parking area adjacent to Public Alley #444 in Boston's historic Back Bay. Task II of the project is Geothermal Solution. This task involves the installation of approximately seven Geothermal wells which will tap into the earth's constant underground temperatures to provide air-conditioning and heating for BAC facilities. The environmentally friendly geothermal system uses no fossil fuel, produces no emissions and runs silently, providing a sustainable model for commercial and residential buildings throughout Boston. Ultimately the combination of this project and other projects will assist in making the BAC "carbon-neutral", and could generate enough additional energy to provide free power to the Engine 33 and Ladder 15 Firehouse located at 941 Boylston Street. The project is located at the rear of 951 Boylston Street, Boston, MA 02115 and the parking area adjacent to Public Alley #444 in Boston's historic Back Bay. Task III of the project is the Sustainability Design Curriculum at the BAC. The BAC is the nation’s largest independent, multi-disciplinary college of spatial design, and a leader in sustainable design education. The Sustainabiltiy Design program, in particular, focuses on energy efficiency,energy performance, energy modeling, energy and air quality principles, green building, renewable energy alternatives and much more. Additionally, the Urban Sustainability Initiative has an objective of providing courses relative to the BAC's demonstration project with DOE, the project’s period of performance activities, subsequent performance data and anticipated sustainability teaching tools. In keeping with BAC's practice based curriculum, students have been involved in the discussion and planning of this project since its inception and sustainability issues have become a part of other programs throughout the college as well. Students will continue to benefit from this hands-on learning opportunity. The project is located at 320 Newbury Street Boston, MA 02115. Task IV of the project is Program Management and Reporting. This task will involve BAC's oversight and general management of the entire project including subcontract administration, contracts administration, technical and financial reporting, design and renovation assistance, other deliverables in accordance with the Federal Assistance reporting Checklist and other contractual obligations and provisions.

15 GEOTHERMAL ENERGY↗

Smart Grid Interoperability Maturity Model Beta Version

The GridWise Architecture Council was formed by the U.S. Department of Energy to promote and enable interoperability among the many entities that interact with the electric power system. This balanced team of industry representatives proposes principles for the development of interoperability concepts and standards. The Council provides industry guidance and tools that make it an available resource for smart grid implementations. In the spirit of advancing interoperability of an ecosystem of smart grid devices and systems, this document presents a model for evaluating the maturity of the artifacts and processes that specify the agreement of parties to collaborate across an information exchange interface. You are expected to have a solid understanding of large, complex system integration concepts and experience in dealing with software component interoperation. Those without this technical background should read the Executive Summary for a description of the purpose and contents of the document. Other documents, such as checklists, guides, and whitepapers, exist for targeted purposes and audiences. Please see the www.gridwiseac.org website for more products of the Council that may be of interest to you.

Beta Version↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design guidelines for SAR digital receiver/exciter boards.

High resolution radar systems generally require combining fast analog to digital converters and digital to analog converters with very high performance digital signal processing logic. These mixed analog and digital printed circuit boards present special challenges with respect to electromagnetic interference. This document first describes the mechanisms of interference on such boards then follows up with a discussion of prevention techniques and finally provides a checklist for designers to help avoid common mistakes.

Dudley, Peter A.↗

Challenges of Achieving 2012 IECC Air Sealing Requirements in Multifamily Dwellings

​While previous versions of the International Energy Conservation Code (IECC) have included provisions to improve the air tightness of dwellings, for the first time, the 2012 IECC mandates compliance verification through blower door testing. Simply completing the Air Barrier and Insulation Installation checklist through visual inspection is no longer sufficient by itself. In addition, the 2012 IECC mandates a significantly stricter air sealing requirement. In Climate Zones 3 through 8, air leakage may not exceed 3 ACH50, which is a significant reduction from the 2009 IECC requirement of 7 ACH50. This requirement is for all residential buildings, which includes low-rise multifamily dwellings. While this air leakage rate requirement is an important component to achieving an efficient building thermal envelope, currently, the code language doesn't explicitly address differences between single family and multifamily applications. In addition, the 2012 IECC does not provide an option to sample dwellings for larger multifamily buildings, so compliance would have to be verified on every unit. With compliance with the 2012 IECC air leakage requirements on the horizon, several of CARB's multifamily builder partners are evaluating how best to comply with this requirement. Builders are not sure whether it is more practical or beneficial to simply pay for guarded testing or to revise their air sealing strategies to improve compartmentalization to comply with code requirements based on unguarded blower door testing. This report summarizes CARB's research that was conducted to assess the feasibility of meeting the 2012 IECC air leakage requirements in 3 multifamily buildings.

&#8203↗

The Effect of Job Performance Aids on Quality Assurance

Job performance aids (JPAs) have been studied for many decades in a variety of disciplines and for many different types of tasks, yet this is the first known research experiment using JPAs in a quality assurance (QA) context. The objective of this thesis was to assess whether a JPA has an effect on the performance of a QA observer performing the concurrent dual verification technique for a basic assembly task. The JPA used in this study was a simple checklist, and the design borrows heavily from prior research on task analysis and other human factors principles. The assembly task and QA construct of concurrent dual verification are consistent with those of a high consequence manufacturing environment. Results showed that the JPA had only a limited effect on QA performance in the context of this experiment. However, there were three important and unexpected findings that may draw interest from a variety of practitioners. First, a novel testing methodology sensitive enough to measure the effects of a JPA on performance was created. Second, the discovery that there are different probabilities of detection for different types of error in a QA context may be the most far-reaching results. Third, these results highlight the limitations of concurrent dual verification as a control against defects. It is hoped that both the methodology and results of this study are an effective baseline from which to launch future research activities.

99 GENERAL AND MISCELLANEOUS↗

High Performance Walls in Hot-Dry Climates

High performance walls represent a high priority measure for moving the next generation of new homes to the Zero Net Energy performance level. The primary goal in improving wall thermal performance revolves around increasing the wall framing from 2x4 to 2x6, adding more cavity and exterior rigid insulation, achieving insulation installation criteria meeting ENERGY STAR's thermal bypass checklist, and reducing the amount of wood penetrating the wall cavity.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of Achieving 2012 IECC Air Sealing Requirements in Multifamily Dwellings

While previous versions of the International Energy Conservation Code (IECC) have included provisions to improve the air tightness of dwellings, for the first time, the 2012 IECC mandates compliance verification through blower door testing. Simply completing the Air Barrier and Insulation Installation checklist through visual inspection is no longer sufficient by itself. In addition, the 2012 IECC mandates a significantly stricter air sealing requirement. In Climate Zones 3 through 8, air leakage may not exceed 3 ACH50, which is a significant reduction from the 2009 IECC requirement of 7 ACH50. This requirement is for all residential buildings, which includes low-rise multifamily dwellings. While this air leakage rate requirement is an important component to achieving an efficient building thermal envelope, currently, the code language doesn't explicitly address differences between single family and multifamily applications. In addition, the 2012 IECC does not provide an option to sample dwellings for larger multifamily buildings, so compliance would have to be verified on every unit. With compliance with the 2012 IECC air leakage requirements on the horizon, several of Consortium for Advanced Residential Building's (CARB’s) multifamily builder partners are evaluating how best to comply with this requirement. Builders are not sure whether it is more practical or beneficial to simply pay for guarded testing or to revise their air sealing strategies to improve compartmentalization to comply with code requirements based on unguarded blower door testing. This report summarizes CARB's research that was conducted to assess the feasibility of meeting the 2012 IECC air leakage requirements in 3 multifamily buildings.

2012 IECC↗

High Performance Walls in Hot-Dry Climates

High performance walls represent a high priority measure for moving the next generation of new homes to the Zero Net Energy performance level. The primary goal in improving wall thermal performance revolves around increasing the wall framing from 2x4 to 2x6, adding more cavity and exterior rigid insulation, achieving insulation installation criteria meeting ENERGY STAR's thermal bypass checklist. To support this activity, in 2013 the Pacific Gas & Electric Company initiated a project with Davis Energy Group (lead for the Building America team, Alliance for Residential Building Innovation) to solicit builder involvement in California to participate in field demonstrations of high performance wall systems. Builders were given incentives and design support in exchange for providing site access for construction observation, cost information, and builder survey feedback. Information from the project was designed to feed into the 2016 Title 24 process, but also to serve as an initial mechanism to engage builders in more high performance construction strategies. This Building America project utilized information collected in the California project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Smart Grid Demonstration Project (Final Report)

The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and posted for universal access at www.nreca.coop/smartgrid. This research is available for widespread distribution to both cooperative members and non-members. These reports are listed in Table 1.2. Interoperability: The deliverable in this area was the advancement of the MultiSpeak™ interoperability standard from version 4.0 to version 5.0, and improvement in the MultiSpeak™ documentation to include more than 100 use cases. This deliverable substantially expanded the scope and usability of MultiSpeak™, the most widely deployed utility interoperability standard, now in use by more than 900 utilities. MultiSpeak™ documentation can be accessed only at www.multispeak.org. Cyber Security: NRECA’s starting point was to develop cyber security tools that incorporated succinct guidance on best practices. The deliverables were: cyber security extensions to MultiSpeak™, which allow more security message exchanges; a Guide to Developing a Cyber Security and Risk Mitigation Plan; a Cyber Security Risk Mitigation Checklist; a Cyber Security Plan Template that co-ops can use to create their own cyber security plans; and Security Questions for Smart Grid Vendors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessing Potential Energy Cost Savings from Increased Energy Code Compliance in Commercial Buildings

The US Department of Energy’s most recent commercial energy code compliance evaluation efforts focused on determining a percent compliance rating for states to help them meet requirements under the American Recovery and Reinvestment Act (ARRA) of 2009. That approach included a checklist of code requirements, each of which was graded pass or fail. Percent compliance for any given building was simply the percent of individual requirements that passed. With its binary approach to compliance determination, the previous methodology failed to answer some important questions. In particular, how much energy cost could be saved by better compliance with the commercial energy code and what are the relative priorities of code requirements from an energy cost savings perspective? This paper explores an analytical approach and pilot study using a single building type and climate zone to answer those questions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LAFD: TA-15 DARHT Firefighter Facility Familiarization Tour, OJT 53044, Revision 0.2

The Los Alamos National Laboratory (LANL or the Lab) will conduct familiarization tours for the Los Alamos County Fire Department (LAFD) at the Dual-Axis Radiographic Hydrodynamic Test (DARHT) Facility, TA-15-0312. The purpose of these tours is to orient LAFD firefighters to the DARHT facility layout and hazards. This document provides information and figures to supplement the familiarization tours. The document will be distributed to the trainees at the time of the familiarization tour. A checklist (Attachment A) has also been developed to ensure that all required information is consistently presented to LAFD personnel during the familiarization tours.

99 GENERAL AND MISCELLANEOUS↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

54 ENVIRONMENTAL SCIENCES↗