Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTRACTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Preliminary Error Characterization and Parametric Error Model for the Automatic Dependent Surveillance - Contract Extended Projected Profile Message

A critical component of Trajectory-Based Operations (TBO) is the ability for a consistent and accurate 4-dimensional trajectory (4DT) to be shared and synchronized between airborne and ground systems as well as amongst various ground automation systems. The Aeronautical Telecommunication Network—Baseline 2 (ATN-B2) standard defines the Extended Projected Profile (EPP) trajectory that can be sent via Automatic Dependent Surveillance-Contract (ADS-C) from an aircraft to ground automation. The EPP trajectory message contains a representation of the reference trajectory from an aircraft’s Flight Management System (FMS). In this work, a set of scenarios were run in a high-fidelity aircraft and FMS simulation to perform an initial characterization of EPP trajectory errors under a given set of conditions. The parameters investigated were the route length, route type, wind magnitude error, wind direction error, and with and without a required time-of-arrival (RTA) constraint. In addition, linear regression was used to identify a set of EPP error models for the cross-track, vertical, and time errors.

Guerreiro, Nelson M.↗

Contract-based byzantine resilience in spacecraft swarms

This paper discusses an extension to the probabilistic underpinnings of flexible resiliency contracts that mitigate the impact of Byzantine faults without requiring additional redundancy typically employed for Byzantine fault tolerance.

Madni, Azad M.↗

Contracting Quality Early in the Lifecycle Using AS9145 Data Deliverables

Development schedules and a highly dynamic supply chain are a challenge to developers of complex systems produced at low volume. Flaws in designs, parts and materials availability problems, poor manufacturability, and a lack of knowledge about critical items and key process attributes can be realized well before traditional second-party quality assurance activities begin. Supplier audits and product inspections may have little mitigating effect once these foundational problems have been realized. Their impacts can be significant lifecycle disruption, cost overruns, inability to deliver to plan, and even project cancellation. AS9145, Requirements for Advanced Product Quality Planning and Production Part Approval Process, can be used to drive quality engineering practices into early development lifecycles to significantly reduce this late-cycle risk and to reduce the cost of quality overall. Since its initial publication in 2016, it has had very limited adoption by the DoD, no adoption by NASA, and sparse adoption in the aerospace and defense supply chain. A task group within the Aerospace Industries Association's (AIA) Joint Strategic Quality Council (JSQC) identified that both acquirers and suppliers see as AS9145 as a cost-adder and are hesitant to use it as an alternative to late-stage-heavy quality assurance approaches. A lack of prior use creates large capability gaps in request-for-proposal (RFP) teams, proposal teams, suppliers’ quality management systems (QMS), and in experienced personnel executing the early lifecycle approach. To create a more realizable on-ramp for using AS9145 in the space and defense sectors, the AIA JSQC task team created five deliverable requirements descriptions (DRDs) that can be used in a contract to begin to engage both parties in early lifecycle quality engineering and quality assurance activities, that reduce exposure to late-stage cost and schedule collapse due to unidentified risks in design, supply chain, and manufacturability. These DRDs drive the parties to engage in planning and analysis discussions early on to understand what production risks can be known and how they will focus resources based on safety criticality and the key elements of design and construction. The suppliers and acquirers who will produce the data and information required by the DRD will be able to incrementally evolve their QMS and the acquirer will incrementally be able to track and understand the benefits of cost shifting from late to early development phases. A white paper describing this approach and the five recommended DRDs will be published by the AIA in late 2024 or early 2025.

Jeannette Plante↗