U.S. department of energy safety design strategy review and approval beyond critical decision 3 for the high-level waste facility - 15525

The Waste Treatment and Immobilization Plant (WTP) in Hanford, Washington, is the nation's largest environmental remediation construction project. In 2012, at the WTP's High-Level Waste (HLW) Facility, the U.S. Department of Energy (DOE), Office of River Protection (ORP) restricted construction work at the Hazard Category 2 nuclear facility because of unresolved technical issues associated with the facility and of misalignment of the design and nuclear safety basis. By 2013, as additional issues were discovered, ORP limited HLW design and procurement activities. Addressing the technical issues and the misalignment of the design basis with the Preliminary Documented Safety Analysis (PDSA) is a priority for ORP. A proposal was developed to use the concept of a safety design strategy (SDS), as documented in DOE-STD-1189-2008, Integration of Safety into the Design Process, as a planning mechanism to support facility design and PDSA alignment. The standard provides the processes to develop an SDS that will ensure safety is integrated into design early in the project, by the start of preliminary design. Ultimately, as design progresses, an SDS is intended to support development of the project's PDSA. However, in this unique case, the HLW Facility design and construction phase has progressed beyond Critical Decision 3 and DOE-STD-1189-2008 was issued in 2008; 6 years after ORP approved the first WTP PDSA. In July 2013, ORP and the contractor recognized that the unresolved technical issues and design - safety basis misalignment should be addressed through a renewed look at nuclear safety requirements, and agreed that developing an SDS tailored to the criteria in DOE-STD-1189-2008 provided the best path forward to better integrate design and safety. Development of the SDS for the HLW Facility was one of many goals ORP established in a plan that describes how ORP will determine whether, and under what conditions, the contractor should be authorized to proceed with production engineering, procurement, and construction activities for the HLW Facility. Over the next several months, the contractor developed the draft SDS, identifying design basis accidents and control strategies for those accidents. ORP monitored progress and, when appropriate, provided recommendations. In April 2014, the contractor provided a draft SDS to ORP for initial review by an independent DOE Review Team. The Review Team was comprised of representatives from nuclear safety, criticality safety, engineering, fire protection, the Office of Environmental Management, the Assistant Manager WTP, and the DOE Chief of Nuclear Safety. A unique draft document review and interactive review process, facilitated through work sessions and continuous communication with the contractor, culminated in the development of 147 technical comments on topics varying from SDS implementation to hydrogen deflagration in vessels. Comment resolution sought to improve project clarity, delineation of control strategies, and, holistically, facilitate integration of safety into design in the SDS, as it will guide the restart of the HLW Facility production engineering and limited procurement and construction activities. All comments were resolved in support of a contractor submission of the final SDS to ORP at the end of June 2014. Successful resolution of these comments was achieved by continuing the real-time response and incorporation interaction with the contractor to ensure that mutual objectives were satisfied. The response times were facilitated through telephone, E-mail, and a shared file server accessible to contractor and DOE reviewers across the DOE complex. As a measure of success of this process, the Safety Basis Approval Authority (ORP Manager) and the WTP Federal Project Director approved the SDS on August 1, 2014, with no conditions of approval. DOE and the contractor recognized that it would be difficult to implement the SDS without changes to the existing contractor's engineering and nuclear safety processes. Accordingly, the contractor developed or revised a significant number of engineering and nuclear safety plans and procedures to implement the SDS into the design process. Over the coming year, the contractor will conduct a gap analysis between the SDS and the presently approved PDSA to incorporate the design basis accidents and preferred control strategies developed from the SDS into the PDSA. In addition, ORP will conduct an assessment of the contractor's implementation of the SDS into the design process at the appropriate stage of implementation, within 6 to 12 months of approval. Although the SDS was developed late in the HLW project timeline, the document will facilitate alignment of design and the safety basis, and is a key step in the return to full production engineering for the HLW Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.

Thomas, LeAnn↗

Final Technical Report

Statement of the problem or situation that is being addressed in your application. The DOE and its national laboratories developed the Home Energy Score™ (HES) to encourage homeowners to improve their energy performance, lower costs and to share energy information through the MLS listing, appraisal, and financing channels. While the HES is an instrumental tool, it is currently underutilized and consists of technical, structural and sector barriers which need to be addressed in order to scale and many energy efficiency contractors are understandably overwhelmed by the added time and effort and lack of incentive to sell and deliver deep retrofit projects while simultaneously meeting the DOE HES program requirements; consequently, contractors may decide to forgo participation. Home Energy Rating System (HERS) Raters have the opportunity to play the critical Assessor role in producing a Home Energy Score (HES); this role has immense potential but currently is unfulfilled. Lastly, while utilities are interested in their customer base achieving greater energy efficiency, especially to help offset growing residential loads in states like California that are accelerating electrification, utilities do not have access to the market actors who are on the front line of influence to homeowners or review and approve their permits: HERS Raters, assessors, contractors and building departments. General statement of how this problem is being addressed: ConSol will integrate the Home Energy Score™ (HES) to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California (CHEERS+HES). The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the utilities in supporting existing homes in their jurisdictions with HES and develop measures to improve energy efficiency and reduce emissions. How is this problem being addressed? What is the overall project approach? In effort to expand the Home Energy Score™ (HES) by increasing the use of aggregable home energy asset data, ConSol proposes to integrate the DOE HES via Application Programming Interface (API) to its State of California approved home energy rating services platform (CHEERS). Once the CHEERS platform and HES are integrated (CHEERS+HES), this enhanced platform will be instantly available and actively deployed via Phase 1 pilot to HERS Raters, assessors and contractors in California to market-test the solution, understand the rate of adoption and identify opportunities for improvement prior to scaling nationally. The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the building industry and homeowners with an easy-to-use assessment if energy and carbon impacts of existing homes, and assist the utilities in supporting existing homes in their jurisdictions with HES to improve energy efficiency and reduce emissions. What is to be done in Phase I? During Phase I of this proposed project, ConSol will (1) design software architecture that links CHEERS to the Home Energy ScoreTM via API, (2) solicit partnership from one or more California utilities for a regional pilot, (3) test the new software with its HERS Raters and contractor network in the partnership utility jurisdiction, (4) launch a pilot version of the newly developed software with HERS Raters and contractors in the utility territory, and (5) explore California’s GoGreen energy efficiency homeowner lending program in parallel with the pilot. Commercial Applications and Other Benefits. Summarize the future applications or public benefits if the project is carried over into Phase II or Phase III and beyond. The CHEERS+HES commercialized product will be ready for national market scale following a successful Phase 1 performance. The CHEERS+HES adoption is estimated to reach a 5% adoption growth rate versus the 110,000 baseline, starting in Year 1 after Phase I completion, and continuing each year. As a direct benefit to the DOE, CHEERS will set a goal of 100,000 Home Energy Score assessments for existing home alterations within the first 10 years following Phase 1 performance. The technical benefits of this proposed project include the harmonized, automated, and seamless integration of the DOE HES into the widely used and market leading California energy registry, CHEERS. The social benefits include the aggregate energy, cost and GHG savings by allowing the broader public streamlined access to the CHEERS+HES measurement and the energy efficiency recommended measures that may result. Key Words: Home Energy ScoreTM (HES); Application Programming Interface (API); Home Energy Rating Services (HERS); HERS Raters; contractors; assessors; existing homes, energy asset data; cost, energy, and emissions saving measures; energy code (Title 24) compliance; document repository; utilities; pilot; newly developed software; energy efficiency; homeowner. Summary for Members of Congress: The DOE Home Energy Score™ (HES) is a tool to encourage homeowners to improve their energy performance, lower costs and share energy information but is underutilized and consists of barriers which need to be addressed in order to scale. In effort to expand the HES, CHEERS, Inc. will integrate the HES to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California.

Application Programming Interface (API)↗

Collaboration in Long-Term Stewardship at DOE's Hanford Site - 13019

The U.S. Department of Energy's (DOE) Hanford Site comprises approximately 1,517 km{sup 2} (586 mi{sup 2}) of land in southeastern Washington. The site was established in 1943 as part of the Manhattan Project to produce plutonium for the nation's nuclear weapons program. As the Cold War era came to an end, the mission of the site transitioned from weapons production to environmental cleanup. As the River Corridor area of the site cleanup is completed, the mission for that portion of the site will transition from active cleanup to continued protection of environment through the Long-Term Stewardship (LTS) Program. The key to successful transition from cleanup to LTS is the unique collaboration among three (3) different DOE Programs and three (3) different prime contractors with each contractor having different contracts. The LTS Program at the site is a successful model of collaboration resulting in efficient resolution of issues and accelerated progress that supports DOE's Richland Office 2015 Vision for the Hanford Site. The 2015 Vision for the Hanford Site involves shrinking the active cleanup footprint of the surface area of the site to approximately 20 mi{sup 2} on the Central Plateau. Hanford's LTS Program is defined in DOE's planning document, Hanford Long-Term Stewardship Program Plan [1]. The Plan defines the relationship and respective responsibilities between the federal cleanup projects and the LTS Program along with their respective contractors. The LTS Program involves these different parties (cleanup program and contractors) who must work together to achieve the objective for transition of land parcels. Through the collaborative efforts with the prime contractors on site over the past two years,, 253.8 km{sup 2} (98 mi{sup 2}) of property has been successfully transitioned from the cleanup program to the LTS Program upon completion of active surface cleanup. Upcoming efforts in the near term will include transitioning another large parcel that includes one of the six (6) cocooned reactors on site. These accomplishments relied upon the transparency between DOE cleanup programs and their contractors working together to successfully transition the land while addressing the challenges that arise. All parties, the three different DOE Programs and their respective prime contractors are dedicated to working together and continuing the progress of transitioning land to LTS, in alignment with the Program Plan and compliant with contractual requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Corrective Maintenance Paradigm Shift at Hanford's Tank Farms - 20077

Hanford's Tank Farms facilities have been used to safely store waste for over 70 years, with the first single-shell tanks being constructed in 1943. Tank Farm facilities consist of 149 single-shell tanks, 28 double-shell tanks, an evaporator facility, and wastewater treatment facilities. Tank Farm facilities are aging, with a tremendous corrective maintenance burden on the Tank Farm contractor. The mission of Tank Farm facilities is soon changing from waste storage to waste staging for the Hanford Waste Treatment and Immobilization Plant (WTP). WTP operations will demand a significant increase in Tank Farm facility operations, in which corrective maintenance outage windows will shrink drastically. This realization has forced the Tank Farm contractor to consider a paradigm shift in Tank Farm facilities Maintenance planning, and the use of reliability Engineering tools. The Tank Farm Production Operations Engineering Cognizant System Engineering (CSE) organization has led the way in motivating this paradigm shift. This shift has been realized through the use of: 1) technical exchange with other Department of Energy (DOE) contractors to develop improvements in the CSE program, 2) a shift from the use of lagging to leading system health indicators, and 3) a Plant Health Committee to unite Engineering, Operations, and Maintenance personnel toward a productive maintenance strategy. The CSE organization has held several technical exchanges with other DOE contractors to discuss CSE concepts, and how to better maintain aging infrastructure. The technical exchange with other contractors has greatly reduced the time required to make improvements in the Tank Farm CSE program. Other DOE contractors have already faced issues surrounding aging infrastructure, and have vast experience in improving the reliability and usable life of structures and components in nuclear facilities. The past CSE program used lagging health indicators to determine the health of systems. The key lagging indicator used to determine system health was availability, which is the percentage of time that a facility was ready for operation compared to the time the facility was demanded for operation. Availability was a good indicator of health in the waste storage mission of Tank Farms, where safe storage was the most important function of the facility, and where maintenance outage windows were typically long-duration. In current and future operations, outage windows are reducing, resulting in the need for much more reliable systems. Systems that have had high availability may suddenly become inoperable due to a failed component or sub-system. In several instances, the use of availability as an indicator of system health failed to predict system/equipment failure before its occurrence. In discussions with other DOE contractors, a set of reliability tools, including leading indicators of health, has been implemented in the CSE program. This primarily involves the use of failure modes and effects analysis and the study of equipment failure to develop system monitoring plans that focus on trending data to detect oncoming equipment failure ahead of time. In addition, the use of a Plant Health Committee has added significantly to the paradigm shift from a corrective maintenance philosophy to the use of predictive and preventive maintenance. The Plant Health Committee is a chartered team consisting of Engineering, Operations, and Maintenance personnel. CSEs use this forum to present the results of their performance monitoring, including the presentation of health via leading health indicators. The most positive aspect of this committee is the communication that it creates within these critical organizations. The Operations and Maintenance organization benefit from focusing maintenance on the reliability-centered focus provided by Engineering. Engineering benefits from the operational experience of the Operations organization and from the failure data that can be provided by Maintenance personnel. The continued use of the Plant Health Committee is expected to further decrease maintenance outage times, in better support of oncoming 24/7 operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗