Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Building footprints”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A control-inspired approach for energy transition planning under uncertainty

As the global carbon footprint continues to grow, many countries are implementing carbon emission reduction policies which have incentivized the expansion of low-carbon and renewable technologies. However, the speed and scale of deployment falls short of that needed to meet climate goals. Energy system models serve as key tools for guiding investment decisions and helping policymakers evaluate the effects of various policies on the development of an energy system. This study focuses on the energy system of the United States and builds upon prior work by incorporating more geographic granularity to account for the trade of commodities and addresses transmission congestion through electricity price adjustments. Furthermore, real-world characteristics, such as delays in constructing new liquid fuel production and electricity generation facilities, are integrated using a sequential decision-making approach that better reflects how decisions can be updated as uncertainties unfold. Results demonstrate that stochastic programming combined with sequential decision-making produces energy transition pathways that are robust to multiple uncertain futures. Additionally, considering real-world characteristics significantly impacts the deployment of renewable technologies and the ability to meet carbon emission reduction goals while also reliably meeting demand. These findings highlight the importance of accounting for uncertainty and real-world characteristics to avoid overly optimistic projections in energy system planning.

energy systems↗

Characterization of superconducting through-silicon vias as capacitive elements in quantum circuits

The large physical size of superconducting qubits and their associated on-chip control structures presents a practical challenge toward building a large-scale quantum computer. In particular, transmons require a high-quality-factor shunting capacitance that is typically achieved by using a large coplanar capacitor. Other components, such as superconducting microwave resonators used for qubit state readout, are typically constructed from coplanar waveguides, which are millimeters in length. Here, we use compact superconducting through-silicon vias to realize lumped-element capacitors in both qubits and readout resonators to significantly reduce the on-chip footprint of both of these circuit elements. We measure two types of devices to show that through-silicon vias are of sufficient quality to be used as capacitive circuit elements and provide a significant reduction in size over existing approaches.

Physics↗

The evolving role of geothermal energy for decarbonizing the United States

Geothermal energy is often referred to as a niche technology that is too localized, too small or too expensive to make much of a difference in how renewable energy will be supplied in a fully decarbonized future. As a result, geothermal energy has been undervalued in terms of what it could provide to complement, rather than compete with, electricity generation from wind, solar photovoltaic, concentrating solar power and other renewables. Geothermal energy systems are fully dispatchable and can provide baseload or load-following electric power or heat suitable for a wide range of applications including supplying district heating for communities and cities, and heating and cooling of individual buildings. The focus of our study is on the potential of utilizing geothermal energy for providing heat for buildings and industry at lower temperatures, a substitute for the combustion of fossil fuels. Because heating represents about 20% (20 EJ per year) of the annual primary energy consumption in the U.S.—with most of it coming from burning natural gas, oil and/or propane in furnaces—deploying geothermal heating on a national scale could have a significant impact on lowering carbon emissions. In heating-dominated states in the U.S. Northern Tier, heating often is among the largest contributors to the state's carbon footprint. This review begins with a discussion of the motivation and rationale behind considering geothermal as a key low-carbon heating option for the U.S. The study summarizes the U.S. geothermal resource and describes the applications and main engineering components of using geothermal energy for heating and cooling, electric power generation, and co-generation using district heating, geothermal heat pumps, and power conversion with steam flashing and organic Rankine plants. Environmental benefits and impacts are described. An extensive discussion of geologic and thermal-hydraulic aspects of the subsurface is included in the review because of their critical role in determining reservoir designs at specific sites to ensure sufficient productivity that is both safe and economically viable. Models for estimating levelized costs of district heating are used to show how costs are affected by reservoir performance, infrastructure capital costs, and financial parameters. Here, the review concludes with an assessment of technical subsurface issues associated with reservoir performance and the economic requirements for providing geothermal heating in district heating systems at a sufficient scale to have an impact on decarbonizing the U.S.

15 GEOTHERMAL ENERGY↗

A hybrid method to evaluate the life cycle climate performance of heat pumps

Heat pumps have a significant impact on the climate, and numerous studies exist discussing the environmental impact of heat pumps quantitatively. Life Cycle Climate Performance (LCCP) is a widely accepted metric and can evaluate the carbon footprint of heat pumps from cradle to grave. LCCP calculation typically requires inputs like annual energy consumption, the material used, refrigerant type, and charge level, which are usually the intermediate or final results from heat pump simulation tools. Thus, a platform linking the heat pump simulation software, local weather conditions, and LCCP evaluation tool can simplify the heat pump design process, especially for complicated systems. This paper presents an LCCP evaluation tool accessing the outputs from the DOE Heat Pump Design Model and the building loads and temperature bin data from AHRI standard 210/240. As for case studies, this paper investigates the LCCP values and life cycle electricity costs (LCEC) of a given cooling-based heat pump with R410A in five typical US cities. In conclusion, this cooling-based heat pump has the highest LCCP value at Chicago and lowest LCCP value at Seattle. In contrast, the heat pump has the highest LCEC at Seattle and the lowest LCEC at Miami. As a future work, a more comprehensive carbon emission and cost analysis of heat pump systems will be conducted through all major cities around the world.

Shen, Bo↗

Nanolaser arrays: toward application-driven dense integration

Abstract The past two decades have seen widespread efforts being directed toward the development of nanoscale lasers. A plethora of studies on single such emitters have helped demonstrate their advantageous characteristics such as ultrasmall footprints, low power consumption, and room-temperature operation. Leveraging knowledge about single nanolasers, the next phase of nanolaser technology will be geared toward scaling up design to form arrays for important applications. In this review, we discuss recent progress on the development of such array architectures of nanolasers. We focus on valuable attributes and phenomena realized due to unique array designs that may help enable real-world, practical applications. Arrays consisting of exactly two nanolasers are first introduced since they can serve as a building block toward comprehending the behavior of larger lattices. These larger-sized lattices can be distinguished depending on whether or not their constituent elements are coupled to one another in some form. While uncoupled arrays are suitable for applications such as imaging, biosensing, and even cryptography, coupling in arrays allows control over many aspects of the emission behavior such as beam directionality, mode switching, and orbital angular momentum. We conclude by discussing some important future directions involving nanolaser arrays.

Deka, Suruj S.↗

One System, Many Models: Designing a Surrogate Model for Sulfur Thermal Energy Storage: Preprint

Industrial process heating (IPH) relies primarily on thermal energy generated by fossil fuel combustion to produce, treat, and alter manufactured goods. Thermal energy storage (TES) helps reduce the carbon footprint of IPH systems by facilitating the utilization of renewable and waste heat sources. A promising new TES technology uses elemental sulfur as the heat-storage medium. The design of sulfur TES systems can be evaluated with the aid of computational fluid dynamics (CFD). However, the computational cost of such CFD efforts is prohibitive to comprehensive optimizations over design parameters. To reduce this computational cost, machine learning (ML) models can be developed to act as surrogates for CFD. In this paper, we describe the process of building and evaluating surrogate ML models for facilitating optimization of sulfur TES systems for IPH. To enforce the thermodynamic relationship between the two modeled quantities, we develop a hybrid model for sulfur temperature using both direct predictions of temperature and calculations of temperature from predictions of the heat transfer coefficient. The hybrid model enforces this constraint at the expense of the slightly reduced accuracy compared to two disjoint models. The overall high accuracy observed in our model evaluation demonstrates the usefulness of such surrogate modeling for studying TES systems. This work contributes to the field of TES surrogate modeling by offering a novel accurate hybrid approach to predicting simultaneously the heat transfer coefficient and temperature of the heat storage medium.

computational fluid dynamics↗

Improving Cost and Efficiency of the Scalable Solid Oxide Fuel Cells Power System

The objective of this project was to design and develop a 20kW range small-scale solid oxide fuel cells (SOFC) power system for applications such as data centers and commercial buildings. The original plan included a 5,000 hours demonstration and a Techno-Economic Analysis (TEA) which were dropped as part of project termination. The original project plan was to use a stack with a cross-flow cell design which had previously been tested for 500 hours at a community college in Malta, NY. However, it was decided to move to the advanced R-SOFC co-flow cell developed under Department of Energy Award DE-FE0031971. The advanced cell design has the advantage of a larger active area for the same manufacturing footprint which results in fewer required cells for the same stack power, hence a higher volumetric power density (kW/L) and lower cost per kW than the original cross-flow cell design. A full SOFC system Simulink model was developed and calibrated with testing data from a fuel cell stack and BOP (balance of plant) components. The simulation results from the calibrated model showed an acceptable match with the experimental data. A structural analysis conducted for various load scenarios indicated no high stress areas for all spatial directions. Major electrical system components were acquired, built and successfully tested. System sensors were verified and validated against controls. Safety checks, a diagnostic check, PID tuning, and control software commissioning tasks were also conducted. The power electronics prototype was delivered and trial testing completed. Balance of Plant component testing and simulation work was conducted to characterize Reformer-Heat Exchanger heat transfer and backpressure and reformer catalyst methane conversion and product selectivity. Simulations were conducted to design the Anode and Cathode fluid passages and size the air-air and fuel-fuel heat exchangers. A Burner operation map was created from test data and the Anode Gas Recirculation blower was tested to evaluate its durability. The SOFC system used a horizontal style design where components sit directly on a casting with a direct connection to the skid. This design has efficient packaging and a small footprint with approximate dimensions of 750 mm x 700 mm x 1700 mm. An SOFC system was built and successfully tested at the Malta, NY facility The system for over 500 hours under load of which over 300 hours was at full load of 20 kW.

30 DIRECT ENERGY CONVERSION↗

Advanced Hydrogen Compressor for Hydrogen Storage Integrated with a Powerplant

This report summarizes work performed by Siemens Energy (SE) to design, build and test an advanced hydrogen compressor stage suitable for use in a hydrogen electrolysis system integrated with a powerplant to achieve energy storage in the form of compressed hydrogen. As hydrogen utilization increases to achieve energy storage and decarbonization of a variety of industries, the need is growing for improved and more cost-effective hydrogen compression technologies. The counter-rotating compression stage concept demonstrated under this contract and presented in this report offers a novel approach to achieve significantly more head rise per stage of compression, resulting in the potential for decreased capital cost and footprint compared to current state of the art centrifugal compression technologies. This report includes details of the design, testing, results, and subsequent validation of aerodynamic performance predictions.

08 HYDROGEN↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Supercritical Carbon Dioxide Primary Power Large-Scale Pilot Plant

The United States electrical power generation fleet encompasses a wide range of technologies, ranging from traditional combustion-based power generation, to nuclear power, to renewable energy. While the distribution of these assets continues to shift due to economic and regulatory influences, coal combustion continues to be a key part of the US energy portfolio. Despite the relative maturity of coal combustion technology, improvements in overall fuel-to-power efficiency and generation flexibility are still possible and will improve both the economic and environmental factors of coal combustion. Echogen Power Systems proposes to lead a world-class team including the University of Missouri, Electric Power Research Institute and Louis Perry Associates in the design, construction and operation of a 10MWe coal-fired supercritical carbon dioxide (sCO 2 ) large-scale pilot. This transformational technology uses sCO 2 as a working fluid instead of water to achieve high thermodynamic efficiencies that can significantly exceed advanced steam-Rankine cycles. Further, the compact nature of sCO 2 turbomachinery offers capital cost and footprint advantages, and the low maintenance of a water-free power cycle can significantly reduce operation and maintenance (O&M) costs over conventional steam-Rankine systems. Recent integration studies of sCO 2 with coal combustion power plants highlight the significant improvements in plant efficiency that sCO 2 can offer relative to even advanced steam Rankine cycles. At commercial scales, coal-sCO 2 plant net efficiency is predicted to be 39-44.0% (HHV), or 10-20% higher output than conventional steam-Rankine systems, which will significantly improve the competitiveness of coal-fired generation. This proposal builds upon projects previously funded by the Department of Energy, including DE-FE0025959 (High-Efficiency Thermal Integration of Closed Supercritical CO 2 Brayton Power Cycles with Oxy-Fired Heaters) and DE-NE0008470 (Conceptual Design for sCO 2 Power Cycle Test Facility). An appropriately-scaled and properly designed and operated pilot project is essential to overcome the natural risk-aversion of the power generation industry and project financing community. The 10 MWe coal-fired sCO 2 pilot power plant proposed herein will reduce the technical and economic risk of this transformational technology, enabling commercial deployment at the conclusion of the project. For the second phase of this project, Echogen lead a team that completed and refined the pilot system conceptual system and key component designs resulting in the completion of a front-end-engineering-design (FEED) study, completed the NEPA review process, completed the permitting process for construction and operation, refined the techno-economic analysis of the proposed system at commercial scale and received commitments for Phase III cost share. The end result of the program will be to demonstrate the technical and economic superiority of the sCO 2 power cycle for coal-fired operation. Major risk elements will have been retired with sufficient operation at high power to enable the power generation industry to move forward with the first commercial deployment of this transformational system.

01 COAL, LIGNITE, AND PEAT↗

Oglala Omaste 2020

Oglala Lakota Housing Authority (OLHA), the tribally designated housing entity of the Oglala Sioux Tribe, installed solar photovoltaic (PV) systems on six tribal buildings, including the Oglala Lakota Housing Authority administration building, four Veterans Affairs Supportive Housing (HUD-VASH) homes, and one Rural Innovation Fund (RIF) home. Combined, the total solar PV capacity of this project is approximately 54 kilowatts-direct current (kW-DC), offsetting an estimated 74,176 kilowatt-hours (kWh) per year and saving OLHA and tenants of the tribally owned residences approximately $\$$8,226 annually. The lifetime savings of the project is estimated to be $\$$380,344. The project aligns with energy goals of OLHA and the Oglala Sioux Tribe to reduce energy costs for low rent tenants and to reduce our carbon footprint; both of which are in line with Lakota values.

14 SOLAR ENERGY↗

The Next Giant Leap: NASA's Ares Launch Vehicles Overview

The next chapter in NASA's history also promises to write the next chapter in America's history, as the Agency makes measurable strides toward developing new space transportation capabilities that wi!! put astronauts on course to explore the Moon as the next giant leap toward the first human footprint on Mars. This paper will present top-level plans and progress being made toward fielding the Ares I crew launch vehicle in the 2013 timeframe and the Ares V cargo launch vehicle in the 2018 timeframe. It also gives insight into the objectives for the first test flight, known as the Ares I-X, which is scheduled for April 2009. The U.S. strategy to scientifically explore space will fuel innovations such as solar power and water recycling, as well as yield new knowledge that directly benefits life on Earth. For the Ares launch vehicles, NASA is building on heritage hardware and unique capabilities; as well as almost 50 years of lessons learned from the Apollo Saturn, Space Shuttle, and commercial launch vehicle programs. In the Ares I Project's inaugural year, extensive trade studies and evaluations were conducted to improve upon the designs initially recommended by the Exploration Systems Architecture Study, resulting in significant reduction of near-term and long-range technical and programmatic risks; conceptual designs were analyzed for fitness against requirements; and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. The Exploration Launch Projects team completed the Ares I System Requirements Review (SRR) at the end of 2006--the first such engineering milestone for a human-rated space transportation system in over 30 years.

Cook, Stephen A.↗

Recommendations for an Applicant to Calculate Activity Data for Greenhouse Gases Estimates

In 2009, the U.S. Nuclear Regulatory Commission (NRC) directed the NRC staff to address climate change issues and consider the impacts of the emissions of carbon dioxide (CO 2 ) and other greenhouse gases (GHGs) in its environmental reviews for major licensing actions (NRC 2009b). To implement this direction from the Commission, the staff issued guidance in 2011 and updated guidance in 2014 in Attachment 1 to Interim Staff Guidance COL/ESP-ISG-026 (NRC 2011; NRC 2014). This guidance provides a simpler method than the method described in RG 4.2 Rev. 3, that an applicant can use to meet the plant parameter envelope (PPE) value from the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors (NR GEIS). NRC staff estimated the 97-year lifecycle GHG emissions from a reference 1000 megawatt electrical (MWe) light-water reactor (LWR) for various activities associated with construction, operation (including uranium fuel cycle), and decommissioning of nuclear power plants and presented the results in Appendix H of the NR GEIS. Appendix H of the NR GEIS includes estimates of direct emissions from construction equipment and emergency diesel engines in a nuclear facility and indirect emissions from workforce vehicular traffic, fuel transportation and the uranium fuel cycle. The NR GEIS Section 3.3 extended the estimates in Appendix H for the installation of two 1000 MWe nuclear reactors on the same site. Scaling factors were used to extrapolate the GHG emissions of a reference 1000 MWe reactor to a two-unit nuclear reactor plant (each reactor unit generating 1000 MWe). GHG emission estimates for building, operation, decommissioning and safe storage (SAFSTOR) for a two-unit nuclear reactor plant would be based on the plant’s physical size, and therefore estimates for these source categories were assumed to be twice the value of the reference 1000 MWe reactor. However, GHG emissions from the fuel cycle (including fuel transportation) were scaled upward by a factor of 3, based on plant efficiencies greater than the 80 percent assumption in Appendix H. Table 1 below shows the PPE emissions for two 1000 MWe nuclear reactors as provided in NR GEIS. The total GHG emissions for two 1000 MWe reactors were calculated as 2,534,000 metric tons (MT) of CO 2 equivalent (CO 2 (e)) based on a 97 year GHG life cycle period. The GHG emissions lifetime of 97 years for a reference nuclear reactor includes a 7-year building phase, 40 years of operation, 10 years of active decommissioning, and 40 years of SAFSTOR operations (NRC 2024). Construction equipment and vehicular traffic from workers commute would contribute to the GHG emissions during a 7-year building phase. Uranium fuel cycle, vehicular traffic, fuel and waste transportation, and testing of standby diesel generators would contribute to GHG emissions during the 40-year operations phase. While NRC’s regulations allow up to 60 years of reactor facility decommissioning, Appendix H estimated that most of the GHGs would occur over an estimated 10-year period during which to the licensee would engage in significant demolition and earth-moving activities, as discussed in Supplement 1 to NUREG-0586 (NRC 2002). Vehicular traffic by the workforce during a 40-year SAFSTOR period would additionally contribute GHG emissions. The carbon footprint for a 40-year SAFSTOR period was separately analyzed from the decommissioning activities as provided in Table YYYY-2 of the staff issued guidance in 2011 (NRC 2011).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Bishop Paiute's Residential Solar Program Phase III

The project consisted of the design, installation, inspection, interconnection and monitoring of 40 grid-tied solar electric systems, totaling up to 108 kW rated capacity, on qualified existing low-income single-family homes located within the Bishop Paiute Reservation. The systems are to provide at least 30-75% savings in displaced electricity totaling 175,000 kWh/year. After the DOE grant contract was signed, the Tribal Employment Rights Ordinance (TERO) board voted to reduce the tribal tax to work on the reservation for these low-income projects from 4% to 1%. This generous reduction was applied back into the community solar project and two additional tribal homes were added for a new total of 40 grid-tied solar electric systems, totaling up to 113 kW rated capacity (two more than originally planned) projects. Additionally, each homeowner was educated on energy efficiency and how solar works and saves them money. The estimated 75% savings on monthly electric bills brings financial relief to tribal homeowners and makes a significant difference on the reservation; giving low-income families money to spend on other essential items, while reducing their carbon footprint in this remote tribal reservation. The GRID IE program and this tribal project had a training component for tribal members to get free hands-on job training on 8 of the 40 homes. Those tribal members that came out to train with GRID IE could then be eligible for the “train to hire” portion of the program, on the remaining 32 homes. Overall, the triple impact of the Bishop Paiute Tribe Residential Solar Program Phase III—affordable energy for low-income families, on-site clean energy production, and hands-on solar installation jobs for local workers—these all help build the Tribe’s energy, economic, environmental goals and offers local self-sufficiency while supporting energy independence to the neediest on the Reservation.

14 SOLAR ENERGY↗

Developing a Logistics Data Process for Support Equipment for NASA Ground Operations

The United States NASA Space Shuttle has long been considered an extremely capable yet relatively expensive rocket. A great part of the roughly US $500 million per launch expense was the support footprint: refurbishment and maintenance of the space shuttle system, together with the long list of resources required to support it, including personnel, tools, facilities, transport and support equipment. NASA determined to make its next rocket system with a smaller logistics footprint, and thereby more cost-effective and quicker turnaround. The logical solution was to adopt a standard Logistics Support Analysis (LSA) process based on GEIA-STD-0007 http://www.logisticsengineers.org/may09pres/GEIASTD0007DEXShortIntro.pdf which is the successor of MIL-STD-1388-2B widely used by U.S., NATO, and other world military services and industries. This approach is unprecedented at NASA: it is the first time a major program of programs, Project Constellation, is factoring logistics and supportability into design at many levels. This paper will focus on one of those levels NASA ground support equipment for the next generation of NASA rockets and on building a Logistics Support Analysis Record (LSAR) for developing and documenting a support solution and inventory of resources for. This LSAR is actually a standards-based database, containing analyses of the time and tools, personnel, facilities and support equipment required to assemble and integrate the stages and umbilicals of a rocket. This paper will cover building this database from scratch: including creating and importing a hierarchical bill of materials (BOM) from legacy data; identifying line-replaceable units (LRUs) of a given piece of equipment; analyzing reliability and maintainability of said LRUs; and therefore making an assessment back to design whether the support solution for a piece of equipment is too much work, i.e., too resource-intensive. If one must replace or inspect an LRU too much, perhaps a modification of the design of the equipment can make such operational effort unnecessary. Finally, this paper addresses processes of tying resources to a timeline of tasks performed in ground operations: this enables various overarching analyses, e.g., a summarization of all resources used for a given piece of equipment. Quality Control of data will also be discussed: importing and exporting data from product teams, including spreadsheets-todatabase or data exchange between databases.

Chakrabarti, Suman↗

Building on 50 Years of Mission Operations Experience for a New Era of Space Exploration

The U.S. National Space Policy, I the 14-nation Global Exploration Strategy,2 and the National Aeronautics and Space Administration's (NASA) 2006 Strategic Plan3 provide foundational direction for far-ranging missions, from safely flying the Space Shuttle and completing construction of the International Space Station by 2010, to fielding a next generation space transportation system consisting of the Ares I Crew Launch Vehicle!Orion Crew Exploration Vehicle and the Ares V Cargo Launch Vehicle!Altair Lunar Lander (fig. 1). Transportation beyond low-Earth orbit will open the frontier for a lunar outpost, where astronauts will harness in-situ resources while exploring this 4 billion-year-old archaeological site, which may hold answers to how the Earth and its satellite were formed. Ultimately, this experience will pave the way for the first human footprint on Mars. In October 2007, NASA" announced assignments for this lunar exploration work.4 The Marshall Space Flight Center is responsible for designing, developing, testing, and evaluating the Ares I and Ares V, which are Space Shuttle derived launch vehicles, along with a number of lunar tasks. The Marshall Center's Engineering Directorate provides the skilled workforce and unique manufacturing, testing, and operational infrastructure needed to deliver space transportation solutions that meet the requirements stated in the Constellation Architecture Requirements Document (CARD). While defining design reference missions to the Station and the Moon, the CARD includes goals that include reducing recurring and nonrecurring costs, while increasing safety and reliability. For this reason, future systems are being designed with operability considerations and lifecycle expenses as independent variables in engineering trade studies.

Onken, Jay F.↗

Greenhouse Gas Impact of Algal Bio-Crude Production for a Range of CO2 Supply Scenarios

Refined bio-crude production from hydrothermal liquefaction of algae holds the potential to replace fossil-based conventional liquid fuels. The microalgae act as natural carbon sequestrators by consuming CO2. However, this absorbed CO2 is released to the atmosphere during the combustion of the bio-crude. Thus, the life-cycle greenhouse gas (GHG) emissions of refined bio-crude are linked to the production and supply of the materials involved and the process energy demands. One prominent raw material is CO2, which is the main source of carbon for algae and the subsequent products. The emissions associated with the supply of CO2 can have a considerable impact on the sustainability of the algae-based refined bio-crude production process. Furthermore, the diurnal algae growth cycle complicates the CO2 supply scenarios. Traditionally, studies have relied on CO2 supplied from existing power plants. However, there is potential for building natural gas or biomass-based power plants with the primary aim of supplying CO2 to the biorefinery. Alternately, a direct air capture (DAC) process can extract CO2 directly from the air. The life-cycle GHG emissions associated with the production of refined bio-crude through hydrothermal liquefaction of algae are presented in this study. Different CO2 supply scenarios, including existing fossil fuel power plants and purpose-built CO2 sources, are compared. The integration of the CO2 sources with the algal biorefinery is also presented. The CO2 supply from biomass-based power plants has the highest potential for GHG reduction, with a GHG footprint of −57 g CO2 eq./MJ refined bio-crude. The CO2 supply from the DAC process has a GHG footprint of 49 CO2 eq./MJ refined bio-crude, which is very similar to the scenario that considers the supply of CO2 from an existing conventional natural gas-based plant and takes credit for the carbon utilization.

36 MATERIALS SCIENCE↗