At least 181 records · Page 10

Liquid oxygen/liquid hydrogen auxiliary power system thruster investigation

The design, fabrication, and demonstration of a 111 newton (25 lb) thrust, integrated auxiliary propulsion system (IAPS) thruster for use with LH2/LO2 propellants is described. Hydrogen was supplied at a temperature range of 22 to 33 K (40 to 60 R), and oxygen from 89 to 122 K (160 to 220 R). The thruster was designed to operate in both pulse mode and steady-state modes for vehicle attitude control, space maneuvering, and as an abort backup in the event of failure of the main propulsion system. A dual-sleeve, tri-axial injection system was designed that utilizes a primary injector/combustor where 100 percent of the oxygen and 8 percent of the hydrogen is introduced; a secondary injector/combustor where 45 percent of the hydrogen is introduced to mix with the primary combustor gases; and a boundary layer injector that uses the remaining 45 percent of the hydrogen to cool the thrust throat/nozzle design. Hot-fire evaluation of this thruster with a BLC injection distance of 2.79 cm (1.10 in.) indicated that a specific impulse value of 390 sec can be attained using a coated molybdenum thrust chamber. Pulse mode tests indicated that a chamber pressure buildup to 90 percent thrust can be achieved in a time on the order of 48 msec. Some problems were encountered in achieving ignition of each pulse during pulse trains. This was interpreted to indicate that a higher delivered spark energy level ( 100 mJ) would be required to maintain ignition reliability of the plasma torch ignition system under the extra 'cold' conditions resulting during pulsing.

Eberle, E. E.↗

V2XConnect: Harmonizing the Landscape of Bidirectional Charging Codes, Standards, and Communication Protocols

The utility grid is constantly evolving with new generation sources and diverse loads from backup generators, backup batteries, rooftop photovoltaics (PV), and flexible charging loads. Each of these technologies presents consumers with an opportunity to work with their local utility to promote grid stability, reliability, and affordability. Through a wide range of programs, utilities are incentivizing the use of these resources to benefit the grid. However, especially for devices with inverters that supply power back to the grid, it is important that these assets comply with local grid codes to ensure human safety, power quality, and grid reliability. One of the most promising of these new technologies is the bidirectional electric vehicle (EV) coupled with bidirectional electric vehicle supply equipment (EVSE). This report introduces the technologies that enable bidirectional charging and how these systems operate. It then outlines the necessary interconnection codes and industry standards that govern the operations of grid-tied inverters, including those in bidirectional charging. A key challenge is then outlined from the complex landscape of communication protocols and proprietary systems designed to coordinate these grid assets. Finally, a single gateway solution is proposed to harmonize communications between all assets across an entire site for a cohesive response to grid codes and utility programs that is flexible enough to support a range of market options.

33 ADVANCED PROPULSION SYSTEMS↗

The MSAT spacecraft of Telesat Mobile Inc.

The MSAT spacecraft of the Canadian mobile satellite operator, Telesat Mobile Inc. (TMI) is described. When launched in 1994, the large geostationary MSAT spacecraft which is currently under construction by Hughes Aircraft Co. and Spar Aerospace Ltd. will enable TMI to provide mobile and transportable communications services to its customers even in the most remote parts of the North American continent. The main elements of TMI's mobile satellite system (described in a companion paper) are the space segment and the ground segment. TMI's space segment will employ one of two nearly identical satellites, one of which will be owned and operated by TMI, the other by the U.S. mobile satellite operator, American Mobile Satellite Corporation (AMSC). The two companies are participating in a joint spacecraft procurement in order to reduce the nonrecurring costs and to ensure system compatibility between the two systems; and they have also agreed to provide in-orbit backup to each other in the event of a catastrophic satellite failure. The program status, performance requirements, main parameters, and configuration of the MSAT spacecraft are reviewed. The major features of the communications subsystem are discussed in some detail, and a brief summary is presented of the spacecraft service module. Key technology items include the L-band RF power amplifier, which must operate with a high DC to RF power efficiency and generate low intermodulation when loaded with multi-carrier signals; and the large diameter deployable L-band antenna. The development status and expected performance of these spacecraft components is examined.

Bertenyi, E.↗

ASTP simulated lightning test report

A simulated lightning test was conducted on the backup spacecraft for the Apollo Soyuz Test Project mission (CSM-119) to determine the susceptibility of the Apollo spacecraft to damage from the indirect effects of lightning. It is demonstrated that induced lightning effects from low-level injected currents can be scaled linearly to those which are obtained in a full threat lightning stroke. Test results indicate that: (1) many of the power and signal critical circuits would fail if subjected to full-threat lightning, (2) pyrotechnic circuits are safe for full-threat lightning, and (3) common-mode voltages exceeded the failure criteria level for all but three of the circuits tested.

Blount, R. L.↗

Telemetry Boards Interpret Rocket, Airplane Engine Data

For all the data gathered by the space shuttle while in orbit, NASA engineers are just as concerned about the information it generates on the ground. From the moment the shuttle s wheels touch the runway to the break of its electrical umbilical cord at 0.4 seconds before its next launch, sensors feed streams of data about the status of the vehicle and its various systems to Kennedy Space Center s shuttle crews. Even while the shuttle orbiter is refitted in Kennedy s orbiter processing facility, engineers constantly monitor everything from power levels to the testing of the mechanical arm in the orbiter s payload bay. On the launch pad and up until liftoff, the Launch Control Center, attached to the large Vehicle Assembly Building, screens all of the shuttle s vital data. (Once the shuttle clears its launch tower, this responsibility shifts to Mission Control at Johnson Space Center, with Kennedy in a backup role.) Ground systems for satellite launches also generate significant amounts of data. At Cape Canaveral Air Force Station, across the Banana River from Kennedy s location on Merritt Island, Florida, NASA rockets carrying precious satellite payloads into space flood the Launch Vehicle Data Center with sensor information on temperature, speed, trajectory, and vibration. The remote measurement and transmission of systems data called telemetry is essential to ensuring the safe and successful launch of the Agency s space missions. When a launch is unsuccessful, as it was for this year s Orbiting Carbon Observatory satellite, telemetry data also provides valuable clues as to what went wrong and how to remedy any problems for future attempts. All of this information is streamed from sensors in the form of binary code: strings of ones and zeros. One small company has partnered with NASA to provide technology that renders raw telemetry data intelligible not only for Agency engineers, but also for those in the private sector.

Source record↗

Space Station Reboost with Electrodynamic Tethers

This paper presents the results of a study of an electrodynamic tether system to reboost the International Space Station (ISS). One recommendation is to use a partially bare tether for electron collection. Locations are suggested as to where the tether system is to be attached at the space station. The effects of the tether system on the microgravity environment may actually be beneficial, because the system can neutralize aerodrag during quiescent periods and, if deployed from a movable boom, can permit optimization of laboratory positioning with respect to acceleration contours. Alternative approaches to tether deployment and retrieval are discussed. It is shown that a relatively short tether system, 7 km long, operating at a power level of 5 kW could provide cumulative savings or over a billion dollars during a 10-year period ending in 2012. This savings is the direct result of a reduction in the number or nights that would otherwise be required to deliver propellant for reboost, with larger cost savings for higher tether usage. In addition to economic considerations, an electrodynamic tether promises a practical backup system that could ensure ISS survival in the event of an (otherwise) catastrophic delay in propellant delivery.

Vas, Irwin E.↗

CALIPSO Mission Status Update: Payload Status

The CALIPSO mission payload status update is presented. The contents include: 1) Wide Field Camera Overview; 2) WFC Temperatures; 3) WFC Voltages; 4) Imaging Infrared Radiometer (IIR) Health; 5) IIR Voltages; 6) Payload Control (PLC) Voltages; 7) PLC Temperatures; 8) Low Voltage Power Supply (LVPS) (CALOPS0025N); 9) PLC Radiation Effects; 10) SDS Status (CALOPS0020N); 11) CALIOP LIDAR; 12) Laser Energy Trends; 13) Laser Energy Zoom; 14) Laser Management Approach; 15) Green / Red Ratio; 16) Pedestal @ SHG Temperature Trends; 17) LOM Heater Duty Cycle Trends; 18) LOM Pressure Trends; 19) Boresight Trend; 20) 1064 Dark Noise Trend; 21) 532 SNR Trend; 22) Spike Trends; 23) LIDAR Highlights; 24) Backup Laser Status; and 25) Future Plans.

Verhappen, Ron↗

Variable Conductance Heat Pipe Cooling of Stirling Convertor and General Purpose Heat Source

In a Stirling Radioisotope Power System (RPS), heat must be continuously removed from the General Purpose Heat Source (GPHS) modules to maintain the modules and surrounding insulation at acceptable temperatures. The Stirling convertor normally provides this cooling. If the Stirling convertor stops in the current system, the insulation is designed to spoil, preventing damage to the GPHS at the cost of an early termination of the mission. An alkali-metal Variable Conductance Heat Pipe (VCHP) can be used to passively allow multiple stops and restarts of the Stirling convertor. In a previous NASA SBIR Program, Advanced Cooling Technologies, Inc. (ACT) developed a series of sodium VCHPs as backup cooling systems for Stirling RPS. The operation of these VCHPs was demonstrated using Stirling heater head simulators and GPHS simulators. In the most recent effort, a sodium VCHP with a stainless steel envelope was designed, fabricated and tested at NASA Glenn Research Center (GRC) with a Stirling convertor for two concepts; one for the Advanced Stirling Radioisotope Generator (ASRG) back up cooling system and one for the Long-lived Venus Lander thermal management system. The VCHP is designed to activate and remove heat from the stopped convertor at a 19 degC temperature increase from the nominal vapor temperature. The 19 degC temperature increase from nominal is low enough to avoid risking standard ASRG operation and spoiling of the Multi-Layer Insulation (MLI). In addition, the same backup cooling system can be applied to the Stirling convertor used for the refrigeration system of the Long-lived Venus Lander. The VCHP will allow the refrigeration system to: 1) rest during transit at a lower temperature than nominal; 2) pre-cool the modules to an even lower temperature before the entry in Venus atmosphere; 3) work at nominal temperature on Venus surface; 4) briefly stop multiple times on the Venus surface to allow scientific measurements. This paper presents the experimental results from integrating the VCHP with an operating Stirling convertor and describes the methodology used to achieve their successful combined operation.

Stirling Radioisotope Power System↗

Advanced Lithium-Ion Cell Development for NASA's Constellation Missions

The Energy Storage Project of NASA s Exploration Technology Development Program is developing advanced lithium-ion batteries to meet the requirements for specific Constellation missions. NASA GRC, in conjunction with JPL and JSC, is leading efforts to develop High Energy and Ultra High Energy cells for three primary Constellation customers: Altair, Extravehicular Activities (EVA), and Lunar Surface Systems. The objective of the High Energy cell development is to enable a battery system that can operationally deliver approximately 150 Wh/kg for 2000 cycles. The Ultra High Energy cell development will enable a battery system that can operationally deliver 220 Wh/kg for 200 cycles. To accomplish these goals, cathode, electrolyte, separator, and safety components are being developed for High Energy Cells. The Ultra High Energy cell development adds lithium alloy anodes to the component development portfolio to enable much higher cell-level specific energy. The Ultra High Energy cell development is targeted for the ascent stage of Altair, which is the Lunar Lander, and for power for the Portable Life support System of the EVA Lunar spacesuit. For these missions, mass is highly critical, but only a limited number of cycles are required. The High Energy cell development is primarily targeted for Mobility Systems (rovers) for Lunar Surface Systems, however, due to the high risk nature of the Ultra High Energy cell development, the High Energy cell will also serve as a backup technology for Altair and EVA. This paper will discuss mission requirements and the goals of the material, component, and cell development efforts in further detail.

Reid, Concha M.↗

High Performance Computing Peak Shaving for Microreactor Operation

There are multiple nuclear microreactors currently under development that are designed to provide autonomous power for as many as ten or more years without refueling and are designed to power high performance computing (HPC) datacenters. But the load-follow speeds for a nuclear microreactor will be much slower than grid power and slower than the power variance typical of a HPC system. HPC datacenters experience peak power load variance driven by several factors ranging from the operation of cooling systems to remove heat from the servers to supporting a wide range of user application workflows and architectures each with different power signatures. One mechanism to support the limited load-follow of a microreactor is peak shaving where an energy storage mechanism is used to shed peak load and reduce significant power variance. This work explores peak electrical load shaving using uninterruptible power supply (UPS) systems designed for HPC support in the context of peak shaving when operating using a nuclear microreactor with a load-follow limited to 10% of load per minute. Using a self contained HPC datacenter complete with stand-alone cooling system and provisioned with an x86 cluster, an ARM cluster, and a graphics processing unit (GPU) cluster, peak shaving for microreactor operation using the UPS battery backup is explored while running two classes of typical HPC user applications. HPC architecture suitability for microreactor operation under this type of peak shaving is examined.

97 MATHEMATICS AND COMPUTING↗

Teams and teamwork at NASA Langley Research Center

The recent reorganization and shift to managing total quality at the NASA Langley Research Center (LaRC) has placed an increasing emphasis on teams and teamwork in accomplishing day-to-day work activities and long-term projects. The purpose of this research was to review the nature of teams and teamwork at LaRC. Models of team performance and teamwork guided the gathering of information. Current and former team members served as participants; their collective experience reflected membership in over 200 teams at LaRC. The participants responded to a survey of open-ended questions which assessed various aspects of teams and teamwork. The participants also met in a workshop to clarify and elaborate on their responses. The work accomplished by the teams ranged from high-level managerial decision making (e.g., developing plans for LaRC reorganization) to creating scientific proposals (e.g., describing spaceflight projects to be designed, sold, and built). Teams typically had nine members who remained together for six months. Member turnover was around 20 percent; this turnover was attributed to heavy loads of other work assignments and little formal recognition and reward for team membership. Team members usually shared a common and valued goal, but there was not a clear standard (except delivery of a document) for knowing when the goal was achieved. However, members viewed their teams as successful. A major factor in team success was the setting of explicit a priori rules for communication. Task interdependencies between members were not complex (e.g., sharing of meeting notes and ideas about issues), except between members of scientific teams (i.e., reliance on the expertise of others). Thus, coordination of activities usually involved scheduling and attendance of team meetings. The team leader was designated by the team's sponsor. This leader usually shared power and responsibilities with other members, such that team members established their own operating procedures for decision making. Sponsors followed a hands-off policy during team operations, but they approved and reviewed team products. Most teams, particularly high-level decision-making teams, had little or no authority to carry out their decisions. Team members had few interpersonal conflicts. They monitored each other respectfully about meeting deadlines. Feedback and backup behaviors were seen as desirable aspects of teamwork, wanted by the members, and done appropriately.

Dickinson, Terry L.↗

Flight evaluation of modifications to a digital electronic engine control system in an F-15 airplane

The third phase of a flight evaluation of a digital electronic engine control system in an F-15 has recently been completed. It was found that digital electronic engine control software logic changes and augmentor hardware improvements resulted in significant improvements in engine operation. For intermediate to maximum power throttle transients, an increase in altitude capability of up to 8000 ft was found, and for idle to maximum transients, an increase of up to 4000 ft was found. A nozzle instability noted in earlier flight testing was investigated on a test engine at NASA Lewis Research Center, a digital electronic engine control software logic change was developed and evaluated, and no instability occurred in the Phase 3 flight evaluation. The backup control airstart modification was evaluated, and gave an improvement of airstart capability by reducing the minimum airspeed for successful airstarts by 50 to 75 knots.

Burcham, F. W., Jr.↗

Flight evaluation of modifications to a digital electronic engine control system in an F-15 airplane

The third phase of a flight evaluation of a digital electronic engine control system in an F-15 has recently been completed. It was found that digital electronic engine control software logic changes and augmentor hardware improvements resulted in significant improvements in engine operation. For intermediate to maximum power throttle transients, an increase in altitude capability of up to 8000 ft was found, and for idle to maximum transients, an increase of up to 4000 ft was found. A nozzle instability noted in earlier flight testing was investigated on a test engine at NASA Lewis Research Center, a digital electronic engine control software logic change was developed and evaluated, and no instability occurred in the Phase 3 flight evaluation. The backup control airstart modification was evaluated, and gave an improvement of airstart capability by reducing the minimum airspeed for successful airstarts by 50 to 75 knots.

Burcham, F. W., Jr.↗

Techno-economic implications and cost of forecasting errors in solar PV power production using optimized deep learning models

Accurate solar Photovoltaic (PV) power forecasting is important for enhancing both the performance and economic feasibility of PV systems. This study evaluates several deep learning models, including Dense Neural Networks (DNN), Long Short-Term Memory (LSTM), Convolutional Neural Networks (CNN), and a hybrid LSTMCNN model, for predicting PV power production one day in advance. Prior to optimization, the models exhibited relatively high errors, with the best model (DNN) achieving a Root Mean Square Error (RMSE) of 31.13 kW and a coefficient of determination (R 2 ) of 62.15 %. After employing Bayesian optimization, the LSTM-CNN model demonstrated the best performance, with the RMSE reduced to 9.79 kW and R 2 improved to 97.62 %, showcasing significant enhancement in predictive accuracy. Here, the economic evaluation considered three cases: rewards for underestimation (0.08 USD/kWh), no rewards, and penalties for both over-and underestimation (120 % of the utility tariff). In the rewards scenario, the LSTM-CNN model reduced the Levelized Cost of Electricity (LCOE) by 4 %, while in the penalty scenario, a backup diesel generator would have increased the LCOE by 49 %. Additionally, the LSTM-CNN model minimized financial losses, achieving the lowest penalties and maximizing net cash flow compared to other models, demonstrating its overall technical and economic superiority.

Deep learning↗

Minimizing EVA Airlock Time and Depress Gas Losses

This paper describes the need and solution for minimizing EVA airlock time and depress gas losses using a new method that minimizes EVA out-the-door time for a suited astronaut and reclaims most of the airlock depress gas. This method consists of one or more related concepts that use an evacuated reservoir tank to store and reclaim the airlock depress gas. The evacuated tank can be an inflatable tank, a spent fuel tank from a lunar lander descent stage, or a backup airlock. During EVA airlock operations, the airlock and reservoir would be equalized at some low pressure, and through proper selection of reservoir size, most of the depress gas would be stored in the reservoir for later reclamation. The benefit of this method is directly applicable to long duration lunar and Mars missions that require multiple EVA missions (up to 100, two-person lunar EVAs) and conservation of consumables, including depress pump power and depress gas. The current ISS airlock gas reclamation method requires approximately 45 minutes of the astronaut s time in the airlock and 1 KW in electrical power. The proposed method would decrease the astronaut s time in the airlock because the depress gas is being temporarily stored in a reservoir tank for later recovery. Once the EVA crew is conducting the EVA, the volume in the reservoir would be pumped back to the cabin at a slow rate. Various trades were conducted to optimize this method, which include time to equalize the airlock with the evacuated reservoir versus reservoir size, pump power to reclaim depress gas versus time allotted, inflatable reservoir pros and cons (weight, volume, complexity), and feasibility of spent lunar nitrogen and oxygen tanks as reservoirs.

Trevino, Luis A.↗

An Integrated, Evidence-Based Approach to Transitioning to Operations: Specifications for Future Replacement Lights on ISS

The International Space Station (ISS) currently uses General Luminaire Assemblies (GLAs) as its primary light source. These GLAs are composed of fluorescent lighting and are integrated into the electrical system on Station. Seventy seven of these units are distributed throughout the vehicle, and many of the lights, having reached their lifespan, are no longer functional; while backup panels are available on orbit, it is anticipated that the supplies of fluorescents on the station will be exhausted by 2015. The ISS vehicle office is therefore preparing to replace all of the GLAs, with Solid State Light Assemblies (SSLAs) composed of white Light Emitting Diodes (LEDs). In the Spring of 2010, an announcement for the replacement lights was released. The announcement specified that proposed lighting systems should use LED technology, given certain power draw restrictions and no changes to how the lights are currently controlled (a central on/off switch per node, and a dial to turn on/off and increase brightness on each lighting unit). The replacement lights are to follow current specifications for brightness levels (lux) and color temperature (degrees Kelvin, or K). Reportedly, the lighting on orbit is dim and suboptimal. The average brightness of the lights (given all lights within a node are operational) is 291 lux; by comparison, recommended office lighting ranges from 200 to 500 lux, and daylight ranges on a typical overcast day, consists of 10,000 to 25,000 lux. Representatives from NASA Behavioral Health and Performance Element (BHP) and Human Factors and Habitability identified that maintaining current brightness levels limits visual acuity, work space, and the use of light as a countermeasure for improving circadian entrainment, hastening phase shifting, evoking acute alertness and enhancing performance. Revised lighting specifications are therefore needed to optimize the replacement lights for the ISS.

Leveton, Lauren↗

Fault Tolerant Magnetic Bearing Testing and Conical Magnetic Bearing Development for Extreme Temperature Environments

During the six month tenure of the grant, activities included continued research of hydrostatic bearings as a viable backup-bearing solution for a magnetically levitated shaft system in extreme temperature environments (1000 F), developmental upgrades of the fault-tolerant magnetic bearing rig at the NASA Glenn Research Center, and assisting in the development of a conical magnetic bearing for extreme temperature environments, particularly turbomachinery. It leveraged work from the ongoing Smart Efficient Components (SEC) and the Turbine-Based Combined Cycle (TBCC) program at NASA Glenn Research Center. The effort was useful in providing technology for more efficient and powerful gas turbine engines.

Keith, Theo G., Jr.↗

Physics-Based Modeling and Simulation of Emerging Battery Technologies for Aerospace

Recently there is a growing interest in the aviation sector to reduce air and noise pollution. Electrochemical energy storage devices such as batteries coupled with a distributed electric propulsion system can reduce noise concerns as well as emissions and allow the concept of Urban Air Mobility to come to fruition. The battery performance needs to improve considerably compared from current state-of-art Li-ion battery (about 200Wh/Kg) to realize all-electric passenger jet for short flights (up to 690 miles). NASA is exploring lithium-oxygen battery chemistry to power hybrid (battery powered electrical system) and all-electric aircraft for short distance and long-distance flights. Li-O2 is one of the advanced Li-ion technologies that promise to provide specific energy of more than 750Wh/Kg. For this presentation, we present our work on improving power density of Li-O2 batteries through the use of multiphysics simulations. Next, a path is outlined to port these model to simulate performance for a new battery chemistry for space application, Li-CO2. Li-CO2 uses carbon dioxide as the active material instead of oxygen. Although this technology is in its early development, the offers two benefits: it can be used as a CO2 scrubber, as oxygen is one of the by-products on charging, and as a backup or a standalone battery for various Mars or Venus missions, where the carbon dioxide content in the atmosphere is high and need battery to operate at higher temperatures.

Mehta, Mohit↗