Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUDGET AND FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

SNL Five-Year Facilities & Infrastructure Plan FY2015-2019

Sandia’s development vision is to provide an agile, flexible, safer, more secure, and efficient enterprise that leverages the scientific and technical capabilities of the workforce and supports national security requirements in multiple areas. Sandia’s Five-Year Facilities & Infrastructure Planning program represents a tool to budget and prioritize immediate and short-term actions from indirect funding sources in light of the bigger picture of proposed investments from direct-funded, Work for Others and other funding sources. As a complementary F&I investment program, Sandia’s indirect investment program supports incremental achievement of the development vision within a constrained resource environment.

99 GENERAL AND MISCELLANEOUS↗

Community Earth System Model (CESM) Tutorial 2016 Final Report

For the 2016 tutorial, NCAR/CGD requested a total budget of $70,000 split equally between DOE and NSF. The funds were used to support student participation (travel, lodging, per diem, etc.). Lectures and practical session support was primarily provided by local participants at no additional cost (see list below). The seventh annual Community Earth System Model (CESM) tutorial (2016) for students and early career scientists was held 8 – 12 August 2016. As has been the case over the last few years, this event was extremely successful and there was greater demand than could be met. There was continued interest in support of the NSF’s EaSM Infrastructure awards, to train these awardees in the application of the CESM. Based on suggestions from previous tutorial participants, the 2016 tutorial experience again provided direct connection to Yellowstone for each individual participant (rather than pairs), and used the NCAR Mesa Library. The 2016 tutorial included lectures on simulating the climate system and practical sessions on running CESM, modifying components, and analyzing data. These were targeted to the graduate student level. In addition, specific talks (“Application” talks) were introduced this year to provide participants with some in-depth knowledge of some specific aspects of CESM.

58 GEOSCIENCES↗

Final Report: Advanced Detector Technologies for Precision Measurement of Inflation, Dark Energy, and Neutrino Masses with the Cosmic Microwave Background

Precision measurements of the Cosmic Microwave Background (CMB) provide unparalleled op- portunities to probe the conditions in the early universe and thereby explore particle physics and gravity at the highest energies yet; measure the number of neutrino species and the sum of the neutrino masses with sensitivity beyond what is achievable with planned terrestrial experiments; improve our knowledge of dark energy; and search for other forms of new physics. The P-5 panel recognized the importance and potential of future CMB observations and recommended the DOE fund a stage four CMB experiment (CMB-S4) under all budget scenarios with construction commencing near the end of this decade. The objective of this proposal is to develop and demonstrate new technologies in time to maximize the science return of CMB-S4. The proposed technologies include: (i) broad band metamaterial antireflection coatings on relevant lenses with negligible absorptive and reflective losses; (ii) filters that reduce out of band optical loading with near perfect in band transmission; (iii) broad-band continuously spinning metamaterial half wave plates that boost the sensitivity to inflationary gravitational waves on large angular scales and mitigate systematics with minimal penalty to the instantaneous sensitivity; and (iv) broad band detectors that will enable excellent foreground discrimination while simultaneously maximizing the sensitivity to the signals from inflation and neutrinos. Together these technologies can realize significant improvements in instrumental sensitivity and control of systematic effects. This improvement in raw sensitivity could be used to reduce costs without sacrificing science by deploying a smaller number of more sensitive detectors, or to improve the sensitivity of CMB-S4 to physics parameters including reducing the error bar on r by the inverse of the mapping speed improvement. Beyond raw sensitivity these technologies address key systematics including polarization mixing and galactic foregrounds and enable CMB-S4 to test the shape of the polarization power spectrum out to larger angular scales further boosting measurements of inflation. In this report we detail the progress that has been made in these technical areas. This includes: (i) a demonstration of 4:1 bandwidth AR coating technology and a detailed understanding of the production challenges, (ii) prototype filters that incorporate absorptive and reflective components into silicon, (iii) a prototype broad band HWP fabricated from metamaterial silicon, and (iv) detector designs spanning 20-350 GHz with an understanding of the difficulties associated with bandwidths greater than one octave.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

NASA Space Engineering Research Center for utilization of local planetary resources

In 1987, responding to widespread concerns about both the health of American space technology development and the academic preparation of 21st-century space professionals, NASA announced a nationwide competition to establish a number of Space Engineering Research Centers. These centers were to be founded on the campuses of nine Universities with strong Doctoral programs in Engineering. Over 115 proposals were received by NASA in November 1987. The University of Arizona's proposal was selected in May as one of the winners, with a budget of approximately $7 million guaranteed by NASA for a minimum funding period of five years. The role of the University of Arizona SERC is to develop the technologies necessary to produce a wide variety of useful products using the materials and sources of energy that occur naturally in near-Earth space. An additional purpose is to lower the cost and extend the scope of large-scale activities. A brief description of the Center's activities for the 1989-1990 period is presented.

Source record↗

Applications of SLR

Satellite Laser Ranging (SLR) has a rich history of development which began in the 1960s with 10 meter-level first generation systems. These systems evolved with order of magnitude improvements to the systems that now produce several millimeter single shot range precisions. What began, in part, as an interesting application of the new laser technology has become an essential component of modern, precision space geodesy, which in turn enables contributions to a variety of science areas. Modern space geodesy is the beneficiary of technological developments which have enabled precision geodetic measurements. Aside from SLR and its closely related technique, Lunar Laser Ranging (LLR), Very Long Baseline Interferometry (VLBI) has made prominent science contributions also. In recent years, the Global Positioning System (GPS) has demonstrated a rapidly growing popularity as the result of demonstrated low cost with high precision instrumentation. Other modern techniques such as DORIS have demonstrated the ability to make significant science contributions; furthermore, PRARE can be expected to contribute in its own right. An appropriate question is 'why should several techniques be financially supported'? While there are several answers, I offer the opinion that, in consideration of the broad science areas that are the benefactors of space geodesy, no single technique can meet all the requirements and/or expectations of the science areas in which space geodesy contributes or has the potential for contributing. The more well-known science areas include plate tectonics, earthquake processes, Earth rotation/orientation, gravity (static and temporal), ocean circulation, land, and ice topography, to name a few applications. It is unfortunate that the modern space geodesy techniques are often viewed as competitive, but this view is usually encouraged by funding competition, especially in an era of growing needs but diminishing budgets. The techniques are, for the most part, complementary and the ability to reduce the data to geodetic parameters from several techniques promotes confidence in the geophysical interpretations. In the following sections, the current SLR applications are reviewed in the context of the other techniques. The strengths and limitations of SLR are reviewed and speculation about the future prospects are offered.

Schutz, Bob E.↗

The Lunar Scout Program: An international program to survey the Moon from orbit for geochemistry, mineralogy, imagery, geodesy, and gravity

The Lunar Scout Program was one of a series of attempts by NASA to develop and fly an orbiting mission to the moon to collect geochemical, geological, and gravity data. Predecessors included the Lunar Observer, the Lunar Geochemical Orbiter, and the Lunar Polar Orbiter - missions studied under the auspices of the Office of Space Science. The Lunar Scout Program, however, was an initiative of the Office of Exploration. It was begun in late 1991 and was transferred to the Office of Space Science after the Office of Exploration was disbanded in 1993. Most of the work was done by a small group of civil servants at the Johnson Space Center; other groups also responsible for mission planning included personnel from the Charles Stark Draper Laboratories, the Lawrence Livermore National Laboratory, Boeing, and Martin Marietta. The Lunar Scout Program failed to achieve new start funding in FY 93 and FY 94 as a result of budget downturns, the de-emphasis of the Space Exploration Initiative, and the fact that lunar science did not rate as high a priority as other planned planetary missions, and was cancelled. The work done on the Lunar Scout Program and other lunar orbiter studies, however, represents assets that will be useful in developing new approaches to lunar orbit science.

Morrison, Donald A.↗

Planetary Spatial Analyst

This is a status report for the project entitled Planetary Spatial Analyst (PSA). This report covers activities from the project inception on October 1, 2007 to June 1, 2008. Originally a three year proposal, PSA was awarded funding for one year and required a revised work statement and budget. At the time of this writing the project is well on track both for completion of work as well as budget. The revised project focused on two objectives: build a solid connection with the target community and implement a prototype software application that provides 3D visualization and spatial analysis technologies for that community. Progress has been made for both of these objectives.

Keely, Leslie↗

Spacecraft Charging Analysis of a CubeSat

Spacecraft charging occurs when charged particles from the surrounding space plasma environment contact a spacecraft and unequal charging currents result in a net charge density accumulation on or in spacecraft materials. Charging becomes a threat when differential potentials between two points on the spacecraft or between the spacecraft and the ambient space environment build to the level that electric fields associated with the potentials exceed the electric breakdown strength of the spacecraft materials and electrostatic discharge arcs are generated. Electrostatic discharges resulting from spacecraft charging can adversely affect telemetry and cause irreparable damage to electronics. Other spacecraft charging effects include damage of solar arrays and thermal protection, enhancement of contamination of surfaces, and degradation of optics. Typically, the large government and commercial space programs include spacecraft charging analysis as part of the design process. CubeSat projects, however, usually do not have the time or funding to include a spacecraft charging analysis due to their low budget and quick-turnaround requirements. CubeSat projects also tend to rely heavily on commercial "off-the-shelf" products, many of which are not qualified for use in space, and are particularly vulnerable to the effects of the space environment. As the demand for longer and more complex CubeSat missions increases, it is becoming more and more important to consider the effects of spacecraft charging in the design process. Results of surface charging analysis using Nascap-2k on a typical CubeSat design for a polar orbit scenario are illustrated. These results show that for a polar orbiting CubeSat, spacecraft charging could be an issue and steps should be taken to mitigate the effects for these small satellites.

Willis, Emily M.↗

NASA Goddard Thermal Technology Overview 2016

This presentation summarizes the current plans and efforts at NASA Goddard to develop new thermal control technology for anticipated future missions. It will also address some of the programmatic developments currently underway at NASA, especially with respect to the NASA Technology Development Program. The effects of the recently enacted FY 16 NASA budget, which includes a sizeable increase, will also be addressed. While funding for basic technology development is still tight, significant efforts are being made in direct support of flight programs. Thermal technology implementation on current flight programs will be reviewed, and the recent push for Cube-sat mission development will also be addressed. Many of these technologies also have broad applicability to DOD, DOE, and commercial programs. Partnerships have been developed with the Air Force, Navy, and various universities to promote technology development. In addition, technology development activities supported by internal research and development (IRAD) program and the Small Business Innovative Research (SBIR) program are reviewed in this presentation. Specific technologies addressed include; two-phase systems applications and issues on NASA missions, latest developments of electro-hydrodynamically pumped systems, Atomic Layer Deposition (ALD), Micro-scale Heat Transfer, and various other research activities.

Thermal Vacuum Testing↗

NASA Goddard Thermal Technology Overview 2017

This presentation summarizes the current plans and efforts at NASA Goddard to develop new thermal control technology for anticipated future missions. It will also address some of the programmatic developments currently underway at NASA, especially with respect to the NASA Technology Development Program. The effects of the recently enacted FY 17 NASA budget, which includes a sizeable increase, will also be addressed. While funding for basic technology development is still tight, significant efforts are being made in direct support of flight programs. Thermal technology Implementation on current flight programs will be reviewed, and the recent push for CubeSat mission development will also be addressed. Many of these technologies also have broad applicability to DOD (Dept. of Defense), DOE (Dept. of the Environment), and commercial programs. Partnerships have been developed with the Air Force, Navy, and various universities to promote technology development. In addition, technology development activities supported by internal research and development (IRAD) program and the Small Business Innovative Research (SBIR) program are reviewed in this presentation. Specific technologies addressed include; two-phase systems applications and issues on NASA missions, latest developments of electro-hydrodynamically pumped systems, Atomic Layer Deposition (ALD), Micro-scale Heat Transfer, and various other research activities.

thermal vacuum testing↗

Energy R&D portfolio analysis based on climate change mitigation

The diverse nature and uncertain potential of the energy technologies that are or may be available to mitigate greenhouse gas emissions pose a challenge to policymakers trying to invest public funds in an optimal R&D portfolio. This paper discusses two analytical approaches to this challenge used to inform funding decisions related to the U.S. Department of Energy (DOE) applied energy R&D portfolio. The two approaches are distinguished by the constraints under which they were conducted: the need to provide an end-to-end portfolio analysis as input to internal DOE budgeting processes, but with limited time and subject to institutional constraints regarding important issues such as expert judgment. Because of these constraints, neither approach should be viewed as an attempt to push forward the state of the art in portfolio analysis in the abstract. Instead, they are an attempt to use more stylized, heuristic methods that can provide first-order insights in the DOE institutional context. Both approaches make use of advanced technology scenarios implemented in an integrated assessment modeling framework and then apply expert judgment regarding the likelihood of achieving associated R&D and commercialization goals. The approaches differ in the granularity of the scenarios used and in the definition of the benefits of technological advance: in one approach the benefits are defined as the cumulative emission reduction attributable to a particular technology; in the other approach benefits are defined as the cumulative cost reduction. In both approaches a return on investment (ROI) criterion is established based on benefits divided by federal R&D investment. The ROI is then used to build a first-order approximation of an optimal applied energy R&D investment portfolio. Although these methodologies have been used to inform an actual budget request, the results reflect only one input among many used in budget formulation. The results are therefore not representative of an official U.S. government or DOE funding recommendation but should instead be considered illustrative of the way in which methodologies such as these could be applied.

Climate change↗

Development of a funding, cost, and spending model for satellite projects

The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

Johnson, Jesse P.↗

Center of Excellence in Model-Based Human Performance

The Center of Excellence (COE) was created in 1984 to facilitate active collaboration between the scientists at Ames Research Center and the Stanford Psychology Department. As this document will review, over that period of time, the COE served its function well. Funds from the Center supported a large number of projects over the last ten years. Many of the people who were supported by the Center Have gone on to distinguished research careers in government, industry and university. In fact, several of the people currently working at NASA Ames were initially funded by the Center mechanism, which served as a useful vehicle for attracting top quality candidates and supporting their research efforts. We are grateful for NASA's support over the years. As we reviewed in the reports for each year, the COE budget generally provided a portion of the true costs of the individual research project. Hence, the funds from the COE were leveraged with funds from industry and other government agencies. In this way, we feel that all parties benefitted greatly from the collaborative spirit and interactive aspects of the COE. The portion of the support from NASA was particularly important in helping members of the COE to set aside the time to publish papers and communicate advances in our understanding of human performance in NASA-related missions.

Wandell, Brian A.↗

Center of Excellence in Model-Based Human Performance

The Center of Excellence (COE) was created in 1984 to facilitate active collaboration between the scientists at Ames Research Center and the Stanford Psychology Department. As this document will review, over that period of time, the COE served its function well. Funds from the Center supported a large number of projects over the last ten years. Many of the people who were supported by the Center have gone on to distinguished research careers in government, industry and university. In fact, several of the people currently working at NASA Ames were initially funded by the Center mechanism, which served as a useful vehicle for attracting top quality candidates and supporting their research efforts. We are grateful for NASA's support over the years. As we reviewed in the reports for each year, the COE budget generally provided a portion of the true costs of the individual research projects. Hence, the funds from the COE were leveraged with funds from industry and other government agencies. In this way, we feel that all parties benefitted greatly from the collaborative spirit and interactive aspects of the COE. The portion of the support from NASA was particularly important in helping members of the COE to set aside the time to publish papers and communicate advances in our understanding of human performance in NASA-related missions.

Wandell, Brian A.↗

NASA's Space Launch System: Affordability for Sustainability

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is charged with delivering a new capability for human exploration beyond Earth orbit in an austere economic climate. But the SLS value is clear and codified in United States (U.S.) budget law. The SLS Program knows that affordability is the key to sustainability and will provide an overview of initiatives designed to fit within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017 within the projected budget. It also has a long-range plan to keep the budget flat, yet evolve the 70-tonne (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through the competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface some 40 years ago. Astronauts train for long-duration voyages on platforms such as the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. To arrive at the launch vehicle concept, the SLS Program conducted internal engineering and business studies that have been externally validated by industry and reviewed by independent assessment panels. In parallel with SLS concept studies, NASA is now refining its mission manifest, guided by U.S. space policy and the Global Exploration Roadmap, which reflects the mutual goals of a dozen member nations. This mission planning will converge with a flexible heavy-lift rocket that can carry international crews and the air, water, food, and equipment they need for extended trips to asteroids and Mars. In addition, the SLS capability will accommodate very large science instruments and other payloads, using a series of modular fairings and adapters to configure the rocket for the mission. The SLS affordability plan includes streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture where the question Why? is often asked and the answer "Because we've always done it that way" is rarely heard. The SLS Program will deliver affordable space transportation solutions for the Orion Multi-Purpose Cargo Vehicle s first autonomous certification flight in 2017, followed by a crewed flight in 2021. As this briefing will show, the SLS will offer a global infrastructure asset for robotic and human scouts of all nations.

May, Todd A.↗

Budget estimates, fiscal year 1995. Volume 2: Mission support and Inspector General

The mission support appropriations provides funding for NASA's civil service work force, space communication services, safety and quality assurance activities, and for maintenance activities for the NASA institution. These objectives are accomplished through the following elements: safety, reliability, and quality assurance; space communication services; research and program management; and construction of facilities.

Source record↗

Thermal Transport Gen3 Liquid-Pathway Funds Re-Allocation Proposal

Further development of the Gen3 Liquid-Pathway project is necessary to address technical engineering challenges with respect to incorporation of a flow control valve and sodium system for the 2.0 MWth Pilot-Scale system. For the Thermal Transport development task 1.3, Sandia National Laboratories (SNL) originally set aside $\$$388,425 for the development of a heat trace test bed, however while the team felt that this work is necessary to de-risk a number critical design-related issues the team also has identified items that require more near-term attention. These items largely pertain to the Chloride molten salt values development, with operation up to 720°C, as well as operational mode/system design development as it pertains to the sodium system design, which is currently not included as part of the system design work. The Gen 3 project team requests the ~$\$$388k of funds be used to address these issues, where the previous work requested may be addressed with the 300kWth chloride molten salt loop. These funds would only be spent during the remainder of the Phase 1 budget period, in preparation of final design work for the Phase 2 portion of the project. For the Budget Summary below, please note that the values are burdened values and not raw values, so the actual values going to the entities will be less due to National Laboratory tax costs.

14 SOLAR ENERGY↗

Office of the Chief Financial Officer Annual Report 2007

2007 was a year of progress and challenges for the Office of the Chief Financial Officer (OCFO). I believe that with the addition of a new Controller, the OCFO senior management team is stronger than ever. With the new Controller on board, the senior management team spent two intensive days updating our strategic plan for the next five years ending in 2012, while making sure that we continue to execute on our existing strategic initiatives. In 2007 the Budget Office, teaming with Human Resources, worked diligently with our colleagues on campus to reengineer the Multi-Location Appointment (MLA) process, making it easier for our Principal Investigators (PIs) to work simultaneously between the Laboratory and UC campuses. The hiring of a point-of-contact in Human Resources to administer the program will also make the process flow smoother. In order to increase our financial flexibility, the OCFO worked with the Department of Energy (DOE) to win approval to reduce the burden rates on research and development (R&D) subcontracts and Intra-University Transfers (IUT). The Budget Office also performed a 'return on investment' (ROI) analysis to secure UCRP funding for a much needed vocational rehabilitation counselor. This new counselor now works with employees who are on medical leave to ensure that they can return to work in a more timely fashion, or if not able to return, usher them through the various options available to them. Under the direction of the new Controller, PriceWaterhouse Coopers (PWC) performed their annual audit of the Laboratory's financial data and reported positive results. In partnership with the Financial Policy and Training Office, the Controller's Office also helped to launch self-assessments of some of our financial processes, including timekeeping and resource adjustments. These self assessments were conducted to promote efficiencies and mitigate risk. In some cases they provided assurance that our practices are sound, and in others highlighted opportunities to improve. A third, and most important assessment on funds control was also conducted that proved very useful in making sure that our financial processes are sound and of the highest ethical standards. In June of 2007 the Procurement Department was awarded the DOE's FY2006 Secretarial Small Business Award for the advancement of small business contracts at Lawrence Berkeley National Laboratory (LBNL). The award was presented in Washington, D.C. Procurement also distinguished itself by passing the tri-ennial Procurement Evaluation and Re-engineering Team (PERT) Review of its systems and processes. We continue to reduce costs through the Supply Chain Initiative saving the Laboratory {approx}$6M to date and have placed over 11,000 orders with over seven vendors using the eBuy system. Our wall-to-wall inventory, which was completed in March of 2007, reported a result of 99+% for item count and 99.51% by value. This was a remarkable achievement that required the hard work of every Division and the Property Department working together. Training continues to be a major initiative for the OCFO and in 2007 we rolled out financial training programs specifically tailored to meet the needs of the scientific divisions. FY2008 presents several opportunities to enhance and improve our service to the scientific community. With the awarding of the HELIOS and JBEI programs, we will be developing new financial paradigms to provide senior management flexibility in decision making. Last year we heard the Laboratory community loud and clear when they expressed their frustration with our current travel system. As we head into the new fiscal year, a cross-functional travel team has identified a new model for how we provide travel services. We will be implementing the Oracle PeopleSoft Travel Reimbursement system by July of 2008. The new system will be more user-friendly and provide better information to the divisions and travel operations. We will also continue to review the travel disbursements operation for further improvement. Also in FY2008, several key information systems implementation projects are under way which will strengthen the Laboratory's financial and business processes. These include Supply Chain Management, and the Budget and Planning System. Future planned systems development includes an electronic sponsored research administration system. Continuing to improve the procurement process at the Laboratory is another major priority for the OCFO. To that end, we will be working to re-engineer the 'procure-to-pay' process. The goal will be to correct process flow to maximize efficiency and effectiveness, while implementing sound business practices and incorporating strong internal controls. Along the same lines, we will also be working with the divisions to implement the Property Management Improvement Program that was identified in FY2007.

57↗