Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ARRA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

PNWSGD Data Collection: Ellensburg, WA

5-minute energy data from January 1, 2008 - December 31, 2014 for the City of Ellensburg, WA, U.S.A. This data was collected under the Pacific Northwest Smart Grid Demonstration Project under the American Recovery and Reinvestment Act (ARRA).

Kuchar, Olga Anna↗

Novel CT's Equilibrium, Stability, and Dynamics

The main effort at the Swarthmore Spheromak Experiment (or SSX) is to study the dynamics and magnetic structure of plasma objects called compact tori (or CTs). If the magnetic geometry is favorable, these objects could have useful fusion applications in the future. Our goal is to discover a natural magnetic field geometry that effectively traps hot plasma (protons and electrons). At SSX, our principle diagnostic has been a local measurement of the magnetic field. These CT plasmas are geometrically complex and their dynamics are complicated. Until recently we have only been able to measure these objects at a few locations (only up to 80 channels) and at a slow rate (1 MHz). We have used the $46,400 ARRA (American Recovery and Reinvestment Act) grant to more than double our measurement capability in this area. We have purchased and implemented modern digitizers from DTAQ (96 total channels at 2 MHz, 14 bit, 20 volts). This added capability will allow our research to add to the understanding of complex, twisted CT plasmas.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Topic Brief 4: Above-Code Buildings

The American Recovery and Reinvestment Act (ARRA) requires a plan for achieving compliance with building energy codes in at least 90% of the new and renovated residential and commercial building space. The Department of Energy's (DOE's) Building Energy Codes Program (BECP) is developing procedures and tools for measuring compliance as required in this legislation. This is the fourth topic brief, to be posted on the BECP website, responding to feedback received on these procedures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

U.S. Department of Energy clean cities five-year strategic plan.

Clean Cities is a government-industry partnership sponsored by the U.S. Department of Energy's (DOE) Vehicle Technologies Program, which is part of the Office of Energy Efficiency and Renewable Energy. Working with its network of about 100 local coalitions and more than 6,500 stakeholders across the country, Clean Cities delivers on its mission to reduce petroleum consumption in on-road transportation. In its work to reduce petroleum use, Clean Cities focuses on a portfolio of technologies that includes electric drive, propane, natural gas, renewable natural gas/biomethane, ethanol/E85, biodiesel/B20 and higher-level blends, fuel economy, and idle reduction. Over the past 17 years, Clean Cities coalitions have displaced more than 2.4 billion gallons of petroleum; they are on track to displace 2.5 billion gallons of gasoline per year by 2020. This Clean Cities Strategic Plan lays out an aggressive five-year agenda to help DOE Clean Cities and its network of coalitions and stakeholders accelerate the deployment of alternative fuel and advanced technology vehicles, while also expanding the supporting infrastructure to reduce petroleum use. Today, Clean Cities has a far larger opportunity to make an impact than at any time in its history because of its unprecedented $300 million allocation for community-based deployment projects from the American Recovery and Reinvestment Act (ARRA) (see box below). Moreover, the Clean Cities annual budget has risen to $25 million for FY2010 and $35 million has been requested for FY2011. Designed as a living document, this strategic plan is grounded in the understanding that priorities will change annually as evolving technical, political, economic, business, and social considerations are woven into project decisions and funding allocations. The plan does not intend to lock Clean Cities into pathways that cannot change. Instead, with technology deployment at its core, the plan serves as a guide for decision-making at both the national and local levels of Clean Cities over the next five years. The plan recognizes the need for flexibility and sets out a strategic direction that will build on the progress of current technologies and new opportunities presented in emerging fuels and technologies, such as hydrogen and fuel cells, as well as new niche markets such as off-road applications that build additional throughput at existing alternative fuel stations.

02 PETROLEUM↗

DOSE ASSESSMENT OF THE FINAL INVENTORIES IN CENTER SLIT TRENCHES ONE THROUGH FIVE

In response to a request from Solid Waste Management (SWM), this study evaluates the performance of waste disposed in Slit Trenches 1-5 by calculating exposure doses and concentrations. As of 8/19/2010, Slit Trenches 1-5 have been filled and are closed to future waste disposal in support of an ARRA-funded interim operational cover project. Slit Trenches 6 and 7 are currently in operation and are not addressed within this analysis. Their current inventory limits are based on the 2008 SA and are not being impacted by this study. This analysis considers the location and the timing of waste disposal in Slit Trenches 1-5 throughout their operational life. In addition, the following improvements to the modeling approach have been incorporated into this analysis: (1) Final waste inventories from WITS are used for the base case analysis where variance in the reported final disposal inventories is addressed through a sensitivity analysis; (2) Updated K{sub d} values are used; (3) Area percentages of non-crushable containers are used in the analysis to determine expected infiltration flows for cases that consider collapse of these containers; (4) An updated representation of ETF carbon column vessels disposed in SLIT3-Unit F is used. Preliminary analyses indicated a problem meeting the groundwater beta-gamma dose limit because of high H-3 and I-129 release from the ETF vessels. The updated model uses results from a recent structural analysis of the ETF vessels indicating that water does not penetrate the vessels for about 130 years and that the vessels remain structurally intact throughout the 1130-year period of assessment; and (5) Operational covers are included with revised installation dates and sets of Slit Trenches that have a common cover. With the exception of the modeling enhancements noted above, the analysis follows the same methodology used in the 2008 PA (WSRC, 2008) and the 2008 SA (Collard and Hamm, 2008). Infiltration flows through the vadose zone are identical to the flows used in the 2008 PA, except for flows during the operational cover time period. The physical (i.e., non-geochemical) models of the vadose zone and aquifer are identical in most cases to the models used in the 2008 PA. However, the 2008 PA assumed a uniform distribution of waste within each Slit Trench (WITS Location) and assumed that the entire inventory of each trench was disposed of at the time the first Slit Trench was opened. The current analysis considers individual trench excavations (i.e., segments) and groups of segments (i.e., Inventory Groups also known as WITS Units) within Slit Trenches. Waste disposal is assumed to be spatially uniform in each Inventory Group and is distributed in time increments of six months or less between the time the Inventory Group was opened and closed.

54 ENVIRONMENTAL SCIENCES↗

UNREVIEWED DISPOSAL QUESTION EVALUATION: CENTER SLIT TRENCHES ONE THROUGH FIVE OPERATIONAL COVERS REANALYSIS

Operational inventory limits for the disposal of solid low-level waste in Slit Trenches 1-7 were established by the Special Analysis (SA) performed by Collard and Hamm (2008). To determine disposal limits for the Slit Trenches, the SA followed the methodology used in the 2008 PA (WSRC, 2008) which assumed that the inventories in each trench were instantaneously placed in 12/1995, which is the date when SLIT1 began operation. The 2008 SA analyzed the impact from placing storm-water runoff covers simultaneously over Slit Trenches 1-7 at 5, 10 and 15 years after the inventory was introduced. To include a measure of conservatism in the limits, the lowest of the limits calculated for any storm-water runoff cover placement time or that calculated in the original 2008 PA was chosen as the operational limit for each radionuclide. Through the availability of funding provided by the American Recovery and Reinvestment Act (ARRA), storm-water runoff covers were placed over Slit Trenches 1-5 in December 2010. SRNL was requested to perform a UDQE for this accelerated action. Table 1 below lists the operational dates for Slit Trenches 1-5 and the time elapsed between when the first waste package was disposed in each Slit Trench and when the storm-water runoff covers were placed. As shown in Table 1, SLIT1 was covered 15.0 years after the date of the first waste package disposal. SLIT2 was covered 9.2 years after the date of the first waste package disposal in SLIT2 which falls within the window of {+-} 1.0 year within which the 2008 SA cover time analysis was assumed to be valid (Crowley and Butcher, 2008). Therefore, the analysis of SLIT1 and SLIT2 in the 2008 SA is considered adequate. However, the cover timings for SLIT3, SLIT4 and SLIT5 are from 2.2 to 1.6 years beyond the nearest cover time of 5 years assumed in the 2008 SA analysis and fall outside of the acceptable one-year margin. Therefore, an additional study was conducted by Collard et al. (2011) that assessed the impact on Slit Trench performance from a covering date that is between 12/2010 and 9/2011. Accelerated placement of storm-water runoff covers over Slit Trenches 1-5 put the cover timing outside of the range considered in the 2008 SA (Collard and Hamm, 2008) which establishes Slit Trench disposal limits. Results from a recent study (Collard et al., 2011) demonstrate that the actual cover installation in December 2010 produces acceptable Slit Trench performance. Additionally, covering Slit Trench 5 separately from Slit Trenches 6 and 7, which will be operationally closed at a later date, does not adversely affect performance of the operationally closed trenches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solar-Assisted Electric Vehicle Charging Station Interim Report

Oak Ridge National Laboratory (ORNL) has been awarded $6.8 million in the Department of Energy (DOE) American Recovery and Reinvestment Act (ARRA) funds as part of an overall $114.8 million ECOtality grant with matching funds from regional partners to install 125 solar-assisted Electric Vehicle (EV) charging stations across Knoxville, Nashville, Chattanooga, and Memphis. Significant progress has been made toward completing the scope with the installation of 25 solar-assisted charging stations at ORNL; six stations at Electric Power Research Institute (EPRI); and 27 stations at Nissan's Smyrna and Franklin sites, with three more stations under construction at Nissan's new lithium-ion battery plant. Additionally, the procurement process for contracting the installation of 34 stations at Knoxville, the University of Tennessee Knoxville (UTK), and Nashville sites is underway with completion of installation scheduled for early 2012. Progress is also being made on finalizing sites and beginning installations of 30 stations in Nashville, Chattanooga, and Memphis by EPRI and Tennessee Valley Authority (TVA). The solar-assisted EV charging station project has made great strides in fiscal year 2011. A total of 58 solar-assisted EV parking spaces have been commissioned in East and Middle Tennessee, and progress on installing the remaining 67 spaces is well underway. The contract for the 34 stations planned for Knoxville, UTK, and Nashville should be underway in October with completion scheduled for the end of March 2012; the remaining three Nissan stations are under construction and scheduled to be complete in November; and the EPRI/TVA stations for Chattanooga, Vanderbilt, and Memphis are underway and should be complete by the end of March 2012. As additional Nissan LEAFs are being delivered, usage of the charging stations has increased substantially. The project is on course to complete all 125 solar-assisted EV charging stations in time to collect meaningful data by the end of government fiscal year 2012. Lessons learned from the sites completed thus far are being incorporated and are proving to be invaluable in completion of the remaining sites.

14 SOLAR ENERGY↗

Weatherization Assistance Program - Background Data and Statistics

This technical memorandum is intended to provide readers with information that may be useful in understanding the purposes, performance, and outcomes of the Department of Energy's (DOE's) Weatherization Assistance Program (Weatherization). Weatherization has been in operation for over thirty years and is the nation's largest single residential energy efficiency program. Its primary purpose, established by law, is 'to increase the energy efficiency of dwellings owned or occupied by low-income persons, reduce their total residential energy expenditures, and improve their health and safety, especially low-income persons who are particularly vulnerable such as the elderly, the handicapped, and children.' The American Reinvestment and Recovery Act PL111-5 (ARRA), passed and signed into law in February 2009, committed $5 Billion over two years to an expanded Weatherization Assistance Program. This has created substantial interest in the program, the population it serves, the energy and cost savings it produces, and its cost-effectiveness. This memorandum is intended to address the need for this kind of information. Statistically valid answers to many of the questions surrounding Weatherization and its performance require comprehensive evaluation of the program. DOE is undertaking precisely this kind of independent evaluation in order to ascertain program effectiveness and to improve its performance. Results of this evaluation effort will begin to emerge in late 2010 and 2011, but they require substantial time and effort. In the meantime, the data and statistics in this memorandum can provide reasonable and transparent estimates of key program characteristics. The memorandum is laid out in three sections. The first deals with some key characteristics describing low-income energy consumption and expenditures. The second section provides estimates of energy savings and energy bill reductions that the program can reasonably be presumed to be producing. The third section deals with estimates of program cost-effectiveness and societal impacts such as carbon reduction and reduced national energy consumption. Each of the sections is brief, containing statistics, explanatory graphics and tables as appropriate, and short explanations of the statistics in order to place them in context for the reader. The companion appendices at the back of the memorandum explain the methods and sources used in developing the statistics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LANL Activities: FY12-Q2 National Risk Assessment Partnership (NRAP): Industrial Carbon Capture Program (Quarterly Report)

This report summarizes progress of LANL activities related to the tasks performed under the LANL FWP FE102-002-FY10, National Risk Assessment Partnership (NRAP): Industrial Carbon Capture Program. This FWP is funded through the American Recovery and Reinvestment Act (ARRA). Overall, the NRAP activities are focused on understanding and evaluating risks associated with large-scale injection and long-term storage of CO 2 in deep geological formations. One of the primary risks during large-scale injection is due to changes in geomechanical stresses to the storage reservoir, to the caprock/seals and to the wellbores. These changes may have the potential to cause CO 2 and brine leakage and geochemical impacts to the groundwater systems. While the importance of these stresses is well recognized, there have been relatively few quantitative studies (laboratory, field or theoretical) of geomechanical processes in sequestration systems. In addition, there are no integrated studies that allow evaluation of risks to groundwater quality in the context of CO 2 injection-induced stresses. The work performed under this project is focused on better understanding these effects. LANL approach will develop laboratory and computational tools to understand the impact of CO 2 -induced mechanical stress by creating a geomechanical test bed using inputs from laboratory experiments, field data, and conceptual approaches. The Geomechanical Test Bed will be used for conducting sensitivity and scenario analyses of the impacts of CO 2 injection. The specific types of questions will relate to fault stimulation and fracture inducing stress on caprock, changes in wellbore leakage due to evolution of stress in the reservoir and caprock, and the potential for induced seismicity. In addition, the Geomechanical Test Bed will be used to investigate the coupling of stress-induced leakage pathways with impacts on groundwater quality. LANL activities are performed under two tasks: (1) develop laboratory and computational tools to understand CO 2 -induced mechanical impacts and (2) use natural analog sites to determine potential groundwater impacts. We are using the Springerville-St. John Dome as a field site for collecting field data on CO 2 migration through faults and groundwater impacts as well as developing and validating computational models. During the FY12 second quarter we have been working with New England Research Company to construct a tri-axial core-holder. We have built fluid control system for the coreflood system that can be ported to perform in-situ imaging of core. We have performed numerical simulations for groundwater impacts of CO 2 and brine leakage using the reservoir model for Springerville-St John's Dome site. We have analyzed groundwater samples collected from Springerville site for major ion chemistry and isotopic composition. We are currently analyzing subsurface core and chip samples acquired for mineralogical composition.

25 ENERGY STORAGE↗

Impact of E4 Training and Field Auditing of GSA Heartland Region Facilities

To assess the impact of energy efficiency expert evaluation (E4) training and field audits performed since 2007, the Federal Energy Management Program (FEMP) undertook a follow-up study on the implementation of E4 recommendations and an analysis of energy savings. The building property manager and O and M contractor of each facility were interviewed to obtain feedback and implementation status of the E4 recommendations. Overall, there were more than 160 recommendations documented in the E4 reports; about 50% of these recommendations were fully implemented and the remaining 50% either partially implemented or not implemented. In four buildings, the E4 recommendations were aligned with American Recovery and Reinvestment Act of 2009 (ARRA) projects replacing HVAC equipment or upgrading the building control system. The E4 recommendations were not followed-up in two buildings because of uncertainty of the long-term use of the facility or personnel changes. Results of this followon study are reported in this document.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Thermal Energy Corporation Combined Heat and Power Project

To meet the planned heating and cooling load growth at the Texas Medical Center (TMC), Thermal Energy Corporation (TECO) implemented Phase 1 of a Master Plan to install an additional 32,000 tons of chilled water capacity, a 75,000 ton-hour (8.8 million gallon) Thermal Energy Storage (TES) tank, and a 48 MW Combined Heat and Power (CHP) system. The Department of Energy selected TMC for a $10 million grant award as part of the Financial Assistance Funding Opportunity Announcement, U.S. Department of Energy National Energy Technology, Recovery Act: Deployment of Combined Heat and Power (CHP) Systems, District Energy Systems, Waste Energy Recovery Systems, and Efficiency Industrial Equipment Funding Opportunity Number: DE-FOA-0000044 to support the installation of a new 48 MW CHP system at the TMC located just outside downtown Houston. As the largest medical center in the world, TMC is home to many of the nation's best hospitals, physicians, researchers, educational institutions, and health care providers. TMC provides care to approximately six million patients each year, and medical instruction to over 71,000 students. A medical center the size of TMC has enormous electricity and thermal energy demands to help it carry out its mission. Reliable, high-quality steam and chilled water are of utmost importance to the operations of its many facilities. For example, advanced medical equipment, laboratories, laundry facilities, space heating and cooling all rely on the generation of heat and power. As result of this project TECO provides this mission critical heating and cooling to TMC utilizing a system that is both energy-efficient and reliable since it provides the capability to run on power independent of the already strained regional electric grid. This allows the medical center to focus on its primary mission providing top quality medical care and instruction without worrying about excessive energy costs or the loss of heating and cooling due to the risk of power outages. TECO's operation is the largest Chilled Water District Energy System in the United States. The company used DOE's funding to help install a new high efficiency CHP system consisting of a Combustion Turbine and a Heat Recovery Steam Generator. This CHP installation was just part of a larger project undertaken by TECO to ensure that it can continue to meet TMC's growing needs. The complete efficiency overhaul that TECO undertook supported more than 1,000 direct and indirect jobs in manufacturing, engineering, and construction, with approximately 400 of those being jobs directly associated with construction of the combined heat and power plant. This showcase industrial scale CHP project, serving a critical component of the nation's healthcare infrastructure, directly and immediately supported the energy efficiency and job creation goals established by ARRA and DOE. It also provided an unsurpassed model of a district energy CHP application that can be replicated within other energy intensive applications in the industrial, institutional and commercial sectors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Documentation, User Support, and Verification of Wind Turbine and Plant Models (Final Report)

As part of the Utility Wind Energy Integration Group (UWIG) and EnerNex's Wind Turbine Modeling Project, EnerNex has received ARRA (federal stimulus) funding through the Department of Energy (DOE) to further the progress of wind turbine and wind plant models. Despite the large existing and planned wind generation deployment, industry-standard models for wind generation have not been formally adopted. Models commonly provided for interconnection studies are not adequate for use in general transmission planning studies, where public, non-proprietary, documented and validated models are needed. NERC MOD (North American Electric Reliability Corporation) reliability standards require that power flow and dynamics models be provided, in accordance with regional requirements and procedures. The goal of this project is to accelerate the appropriate use of generic wind turbine models for transmission network analysis by: (1) Defining proposed enhancements to the generic wind turbine model structures that would allow representation of more advanced; (2) Comparative testing of the generic models against more detailed (and sometimes proprietary) versions developed by turbine vendors; (3) Developing recommended parameters for the generic models to best mimic the performance of specific commercial wind turbines; (4) Documenting results of the comparative simulations in an application guide for users; (5) Conducting technology transfer activities in regional workshops for dissemination of knowledge and information gained, and to engage electric power and wind industry personnel in the project while underway; (6) Designing of a "living" homepage to establish an online resource for transmission planners.

17 WIND ENERGY↗

Design, Test and Demonstration of Saturable Reactor High-Temperature Superconductor Fault Current Limiters

Zenergy Power has successfully designed, built, tested, and installed in the US electrical grid a saturable reactor Fault Current Limiter. Beginning in 2007, first as SC Power Systems and from 2008 as Zenergy Power, Inc., ZP used DOE matching grant and ARRA funds to help refine the design of the saturated reactor fault current limiter. ZP ultimately perfected the design of the saturated reactor FCL to the point that ZP could reliably design a suitable FCL for most utility applications. Beginning with a very basic FCL design using 1G HTS for a coil housed in a LN2 cryostat for the DC bias magnet, the technology progressed to a commercial system that was offered for sale internationally. Substantial progress was made in two areas. First, the cryogenics cooling system progressed from a sub-cooled liquid nitrogen container housing the HTS coils to cryostats utilizing dry conduction cooling and reaching temperatures down to less than 20 degrees K. Large, round cryostats with warm bore diameters of 1.7 meters enabled the design of large tanks to hold the AC components. Second, the design of the AC part of the FCL was refined from a six legged spider design to a more compact and lighter design with better fault current limiting capability. Further refinement of the flux path and core shape led to an efficient saturated reactor design requiring less Ampere-turns to saturate the core. In conclusion, the development of the saturable reactor FCL led to a more efficient design not requiring HTS magnets and their associated peripheral equipment, which yielded a more economical product in line with the electric utility industry expectations. The original goal for the DOE funding of the ZP project Design, Test and Demonstration of Saturable Reactor High-Temperature Superconductor Fault Current Limiters was to stimulate the HTS wire industry with, first 1G, then 2G, HTS wire applications. Over the approximately 5 years of ZP's product development program, the amount of HTS wire employed per FCL and its cost as a percentage of the total FCL product content had not dropped substantially from an unsustainable level of more than 50% of the total cost of the FCL, nor had the availability increased (today the availability of 2G wire for commercial applications outside of specific partnerships with the leading 2G wire manufacturers is extremely limited). ZP had projected a very significant commercial potential for FCLs with higher performance and lower costs compared to the initial models built with 1G wire, which would come about from the widespread availability of low-cost, high-performance 2G HTS wire. The potential for 2G wires at greatly reduced performance-based prices compared to 1G HTS conductor held out the potential for the commercial production of FCLs at price and performance levels attractive to the utility industry. However, the price of HTS wire did not drop as expected and today the available quantities of 2G wire are limited, and the price is higher than the currently available supplies of 1G wire. The commercial option for ZP to provide a reliable and reasonably priced FCL to the utility industry is to employ conventional resistive conductor DC electromagnets to bias the FCL. Since the premise of the original funding was to stimulate the HTS wire industry and ZP concluded that copper-based magnets were more economical for the foreseeable future, DOE and ZP decided to mutually terminate the project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FY12-Q3 National Risk Assessment Partnership (NRAP): Industrial Carbon Capture Program (Quarterly Report for LANL Activities)

This report summarizes progress of LANL activities related to the tasks performed under the LANL FWP FE102-002-FY10, National Risk Assessment Partnership (NRAP): Industrial Carbon Capture Program. This FWP is funded through the American Recovery and Reinvestment Act (ARRA). Overall, the NRAP activities are focused on understanding and evaluating risks associated with large-scale injection and long-term storage of CO 2 in deep geological formations. One of the primary risks during large-scale injection is due to changes in geomechanical stresses to the storage reservoir, to the caprock/seals and to the wellbores. These changes may have the potential to cause CO 2 and brine leakage and geochemical impacts to the groundwater systems. While the importance of these stresses is well recognized, there have been relatively few quantitative studies (laboratory, field or theoretical) of geomechanical processes in sequestration systems. In addition, there are no integrated studies that allow evaluation of risks to groundwater quality in the context of CO 2 injection-induced stresses. The work performed under this project is focused on better understanding these effects. LANL approach will develop laboratory and computational tools to understand the impact of CO 2 -induced mechanical stress by creating a geomechanical test bed using inputs from laboratory experiments, field data, and conceptual approaches. The Geomechanical Test Bed will be used for conducting sensitivity and scenario analyses of the impacts of CO 2 injection. The specific types of questions will relate to fault stimulation and fracture inducing stress on caprock, changes in wellbore leakage due to evolution of stress in the reservoir and caprock, and the potential for induced seismicity. In addition, the Geomechanical Test Bed will be used to investigate the coupling of stress-induced leakage pathways with impacts on groundwater quality. LANL activities are performed under two tasks: 1) develop laboratory and computational tools to understand CO 2 -induced mechanical impacts and 2) use natural analog sites to determine potential groundwater impacts. We are using the Springerville-St. John Dome as a field site for collecting field data on CO 2 migration through faults and groundwater impacts as well as developing and validating computational models. During the FY12 fourth quarter we received the tri-axial core-holder from New England Research Company (NERC). We have completed the construction of the experimental set up for performing coupled flow-stress experiments. We will be completing first set of flow through experiments in October.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

MINDES - Data Mining for Inverse Design (Final Report)

This is the final summary report on the work done as part of the ARRA-funded, MINDES: Data Mining for Inverse Design SciDAC-e project. The goal of this project was to apply data mining techniques to data generated by the Center for Inverse Design, an Energy Frontier Research Center (EFRC) of the Office of Science, US Department of Energy. This center is pursuing a new approach to material science; rather than using the conventional direct approach (“Given the structure, find the electronic properties”), they are using a “materials by inverse design” approach (“Given the desired property, find the structure”). The specific target properties of interest include general semiconductor optical and electrical properties.

97 MATHEMATICS AND COMPUTING↗

Research in Superconducting Radiofrequency Systems

The aim of the program is to transfer our successes in single cell high gradient R&D to multi-cell cavities of advanced shapes. We have also developed a new technique for electropolishing (EP) which is much less expensive than the standard EP technique used at other labs. Our aim is to apply this technique to multi-cell cavities of advanced shapes. The scientific program of this grant was concluded in 2010. An extension of this grant al-lowed us to receive ARRA funding, which we used to improve the helium-liquefier system in Cornell's SRF laboratory. Part of this system had been purchased and installed by another grant. The extension to grant DE-FG02-04ER41354 was proposed to extend this system to sufficient power so that helium can be recovered from SRF-cavity test and simultaneously can be liquefied. This significantly increased the number of cavities we can test per week. This upgrade project was finished in the spring of 2010 and has been in regular use ever since.

43 PARTICLE ACCELERATORS↗

Economic Impact of Fuel Cell Deployment in Forklifts and for Backup Power under the American Recovery and Reinvestment Act

Through the American Recovery and Reinvestment Act (the Recovery Act or ARRA), the United States Department of Energy (DOE) funded several projects to deploy polymer electrolyte membrane (PEM) fuel cells in forklift and backup power applications. DOE invested $\$$9.7 million to deploy fuel cells in forklifts and an additional $\$$11.8 million was contributed through industry cost shares, for a total investment of $\$$21.5 million in forklift projects. DOE invested $\$$18.5 million to deploy fuel cells in backup power projects and an additional $\$$30.8 million was contributed through industry cost shares, for a total investment of $\$$49.3 million in backup power projects.

Mintz, M.↗

Estimating the Maximum Potential Revenue for Grid Connected Electricity Storage: Arbitrage and Regulation

The valuation of an electricity storage device is based on the expected future cash flow generated by the device. Two potential sources of income for an electricity storage system are energy arbitrage and participation in the frequency regulation market. Energy arbitrage refers to purchasing (storing) energy when electricity prices are low, and selling (discharging) energy when electricity prices are high. Frequency regulation is an ancillary service geared towards maintaining system frequency, and is typically procured by the independent system operator in some type of market. This paper outlines the calculations required to estimate the maximum potential revenue from participating in these two activities. First, a mathematical model is presented for the state of charge as a function of the storage device parameters and the quantities of electricity purchased/sold as well as the quantities offered into the regulation market. Using this mathematical model, we present a linear programming optimization approach to calculating the maximum potential revenue from an electricity storage device. The calculation of the maximum potential revenue is critical in developing an upper bound on the value of storage, as a benchmark for evaluating potential trading strategies, and a tool for capital finance risk assessment. Then, we use historical California Independent System Operator (CAISO) data from 2010-2011 to evaluate the maximum potential revenue from the Tehachapi wind energy storage project, an American Recovery and Reinvestment Act of 2009 (ARRA) energy storage demonstration project. We investigate the maximum potential revenue from two different scenarios: arbitrage only and arbitrage combined with the regulation market. Our analysis shows that participation in the regulation market produces four times the revenue compared to arbitrage in the CAISO market using 2010 and 2011 data. Then we evaluate several trading strategies to illustrate how they compare to the maximum potential revenue benchmark. We conclude with a sensitivity analysis with respect to key parameters.

electricity storage↗