Engineering PapersSearch

SEARCH · Engineering Papers

Search Engineering Papers

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Extending mARC II Arc-Jet Test Duration via Design and Implementation of Model System Cooling Sleeve

The mARC II is a 30 kW arc-jet facility at NASA Ames Research Center used to generate high-enthalpy flows for low-cost thermal protection system (TPS) technology development. Sustained operation of downstream instrumentation and material samples is constrained by thermal loading transmitted through the arc-jet test environment, limiting achievable run times and experimental throughput. This work presents the design, integration, and validation of a cooling sleeve implemented on the sweep arm drive motor feedthrough to mitigate thermal accumulation during testing. The addition of the cooling sleeve is a simple, robust upgrade that translates directly into enhanced facility capability by supporting longer run durations, reduced turnaround time, and higher throughput.

sting arm

Extending mARC II Arc-Jet Test Duration via Design and Implementation of Model System Cooling Sleeve

The mARC II is a 30 kW arc-jet facility at NASA Ames Research Center used to generate high-enthalpy flows for low-cost thermal protection system (TPS) technology development. Sustained operation of downstream instrumentation and material samples is constrained by thermal loading transmitted through the arc-jet test environment, limiting achievable run times and experimental throughput. This work presents the design, integration, and validation of a cooling sleeve implemented on the sweep arm drive motor feedthrough to mitigate thermal accumulation during testing. The addition of the cooling sleeve is a simple, robust upgrade that translates directly into enhanced facility capability by supporting longer run durations, reduced turnaround time, and higher throughput.

numerical simulations