Smart building HVAC control challenge: experience and solutions from the ADRENALIN project

Abstract

A smart building HVAC control competition crowdsourced and compared algorithms on fair and equal ground using the standardized BOPTEST framework. The competition attracted 138 participants, but only 9% submitted valid solutions for the final stage, highlighting the complexity of advanced HVAC control design. The winning solutions showed significant potential to reduce energy use and cost by shifting demand, without compromising occupant comfort. Across scenarios, thermal energy cost reductions of 36–76% relative to a baseline, were achieved. In peak heat periods, the cost reduction leveraged limited energy use reduction (0–15%), but more significant energy price reduction (34–62%). This shows smart controls' ability to avoid as much as possible consumption during the morning peak hours, when spot prices are tendentially the highest. Hosting the competition has highlighted challenges in creating competitions that both are fair and promotes solutions that are transferable to real life implementation.

Explore related subjects

Keep this discovery

BibTeXRIS

Walnum, Harald Taxt [SINTEF Community, Oslo (Norway); Norwegian Univ. of Science and Technology, Trondheim (Norway)] (ORCID:0000000287186797), Tolnai, Balázs András [Univ. of Southern Denmark, Odense (Denmark)], Blum, David [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)], Shi, Jicheng [Ecole Polytechnique Federale Lausanne (EPFL) (Switzerland)], Jones, Colin N. [Ecole Polytechnique Federale Lausanne (EPFL) (Switzerland)], Dessai, Deep [Independent Researcher, Goa (India)], Wang, Wenbin [Ecole Polytechnique Federale Lausanne (EPFL) (Switzerland)], Xu, Wenjie [Ecole Polytechnique Federale Lausanne (EPFL) (Switzerland)], Gros, Sebastien [Norwegian Univ. of Science and Technology, Trondheim (Norway)] (ORCID:0000000160542133), Sartori, Igor [SINTEF Community, Oslo (Norway)] (ORCID:0000000255370020). 2026-04-30. Smart building HVAC control challenge: experience and solutions from the ADRENALIN project. https://doi.org/10.1080/19401493.2026.2656363

Cite the original work for its findings. Save a collection to share your selection of sources.

Discover connections

Connections use source metadata and explicit phrase matches, not verified experimental comparisons.

KEEP EXPLORING

Related reports

IBPSA Project 2 BOPTEST: An update on the test cases available in the framework for testing advanced control strategies in buildings

Project 2 develops software infrastructure, test cases, and extensions for the Building Optimization Testing Framework (BOPTEST) to address the expanding needs of building and urban energy system controls through open international collaboration. This paper provides an overview of the new test cases available as of BOPTEST version 0.7.1. Each test case is developed using open-source Modelica libraries and Spawn of EnergyPlus, enabling the creation of high-fidelity building models that incorporate envelope dynamics, Heating Ventilation and Air Conditioning (HVAC) systems, and explicit control representations. Currently, eight test cases are available, with five additional cases under development. These test cases cover a wide range of climates, building types, and HVAC systems. This paper compiles and summarizes test case descriptions, cites original manuscripts that developed them for a more detailed description, and reports baseline control performance metrics. Furthermore, two example applications are presented: one illustrating different levels of control, from supervisory to low-level, and another demonstrating how Model Predictive Control (MPC) solutions must be adapted from continuous to integer to control some building actuators.

Zanetti, Ettore

A Probabilistic Approach to Load Modeling for Central HVAC Systems in Large Commercial Buildings for Retrofit Decisions Under Uncertainty

Retrofitting central HVAC systems in large commercial buildings with advanced technologies like heat recovery chillers (HRCs) offers a significant opportunity to enhance energy efficiency. However, analyzing these retrofits is challenging with traditional whole-building simulation tools, which require intensive calibration and struggle to model innovative system configurations and controls. To overcome these limitations, this study proposes a load profilebased retrofit analysis framework that provides better decisions under uncertainty. The main focus of this paper is the development of a probabilistic load profile model that can be used in the framework by using exploratory data analysis (EDA) of measured building data to properly quantify its inherent variability. A non-parametric Gaussian Process (GP) model was employed to capture the time- and weather-dependent characteristics of the heating load while explicitly modeling its uncertainty. The model's effectiveness is demonstrated through strong predictive performance on unseen data and physically interpretable insights into load behavior. This data-driven, probabilistic load profile serves as a robust and flexible input for subsequent system simulations, enabling a more confident and statistically sound analysis of retrofit potential.

Ham, S W

Challenges and Opportunities for HVAC + Phase Change Material Thermal Energy Storage in Buildings

Phase-change material (PCM) thermal-energy storage (TES) integrated with HVAC and domestic hot water (DHW) can shift a large share of building thermal loads. By flattening and shifting loads, PCM TES reduces peak electricity use, eases stress on local and grid infrastructure, and lowers costs. It can also defer costly upgrades to service panels, distribution, and transmission. Higher energy density relative to chilled or hot water storage makes PCM TES practical for small, space limited, and retrofit projects, while packaged HVAC-integrated systems expand cost-effective load shifting to commercial buildings that previously lacked options. Despite this promise, deployment faces barriers. This paper presents challenges, opportunities, and lessons learned from lab and field integrations of PCM TES with packaged HVAC systems. Key challenges include misalignment between default heat pump controls tuned for direct-to-load operation and TES charge/discharge objectives, PCM properties that diverge from manufacturer claims and evolve with cycling, and high integration and deployment costs with off-the-shelf products. These studies underscore the need for factory built, integrated systems that arrive as prepackaged modules with proven controls, reducing design and installation effort and delivering predictable performance across projects. The paper outlines steps to enable viable and scalable PCM TES HVAC and DHW systems, including 1) validated methods that can be used to characterize PCM properties and TES system performance, 2) supervisory controls that optimize charge/discharge scheduling, and 3) factory integrated packaging that eliminates bespoke field engineering.

Dutton, Spencer