Engineering PapersSearch

DOE OSTI · 3029508

Towards Improving luminosity using optics tuning and data-driven methods

Abstract

The results of Run 24 experiments at Relativistic Heavy Ion Collider (RHIC) for improving luminosity using optics tuning are presented in this study. In the first experiment, MADx matching was used to output magnet strengths corresponding to specific s star movements around Interaction Region 8 (IR8). The corresponding Zero Degree Calorimeter (ZDC) signal was measured in place of luminosity, and Bayesian Optimization aids search of optimal movements. It was found that values retrieved from matching were inaccurate, resulting in negative feedback loops. The second experiment focused on calculating accurate s star movements. The matching method was replaced with a linear sensitivity matrix, directly relating optics to power supply, and its null space was used to fit constraints such as hysteresis effects. At the experiment, beam losses were observed at collimators around boundary of IR8, which were fixed for the third experiment. Dynamic mode decomposition was also introduced to improve quality of turn-by-turn (TBT) data as well as accuracy and consistency of optics measurements at IR8. These improvements will be tested in the experiment of next RHIC run for luminosity optimization.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Fung, William [Michigan State Univ., East Lansing, MI (United States)]. 2025-05-30. Towards Improving luminosity using optics tuning and data-driven methods. https://doi.org/10.18429/jacow-ipac2025-wepm020

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Transverse BBU Suppression with Feedback for Energy-Recovery Linacs

The Electron–Ion Collider (EIC) achieves its design luminosity by cooling the ion beam with a high-current electron beam generated in an energy-recovery linac (ERL). The baseline ERL lattice employs a BNL five-cell cavity that is frequency-scaled to 197 MHz, 591 MHz, and 1.773 GHz, raising concerns about multibunch beam-breakup (BBU) instabilities. Threshold currents for each frequency option are established with two independent BBU tracking codes, providing cross-validated operating margins that guide cavity selection. To further increase the current limit, we incorporate a digital transverse feedback (FB) system that targets the dominant higher-order modes (HOMs). Simulations show the FB raises the BBU threshold by roughly an order of magnitude: power-spectral-density analysis of the beam centroid at the linac exit confirms strong suppression of the aliased HOM peak, although some spectral growth appears at secondary frequencies. This combined study quantifies baseline BBU limits, demonstrates effective active mitigation, and charts a practical path toward robust, high-current operation of the EIC ERL.

Accelerator Physics

A reactive ferroelectric tuner for microphonics compensation

Jefferson Lab (JLab) is actively pursuing an extensive research program focused on developing advanced Nb₃Sn superconducting technology for particle accel-eration. Due to the brittle nature of Nb₃Sn coatings, a Ferroelectric Tuner (FRT) currently represents the most viable approach for microphonics compensation in these next-generation cavities. We suggest a novel, fast-responding FRT integrated directly into the main coupler, eliminating the need for an additional RF port. Leveraging a unique RF design based on a magic-T configuration, this advanced FRT will enable micro-phonics compensation in the ±30 Hz range without undesirable changes to the external quality factor.

Accelerator Physics

Lifetime extension of legacy CEBAF LLRF hardware

A significant portion of the Low-Level Radio Frequency (LLRF) hardware in Jefferson Lab’s CEBAF is from the original construction of the facility using 1980’s CAMAC technology. Of the fifty-three zones in CEBAF, thirty-six of them are legacy hardware. The age of the legacy system has led to difficulties in maintaining the hardware due to parts going obsolete without suitable drop in replacements. Continued operation of the legacy system is required as the installation of LLRF 3.0 systems is costly and cannot be completed in a short period of time with the available resources. The most pressing failure in the legacy system was a failing buffer card, which is responsible for communication between the EPICs network and individual RF control modules. A new buffer card was designed as a transparent, drop in, replacement so that upgrades are simply a matter of swapping the existing legacy hardware. This buffer card upgrades a single point failure component and promises to extend the operable lifetime of CEBAF’s legacy systems.

Accelerator Physics