DOE OSTI · 2999520
Craig Energy Center Feasibility Study
Abstract
Tri-State Generation and Transmission Association Inc. (“Tri-State”) provides wholesale electric power to its member cooperatives and public power districts that collectively deliver electricity to more than a million consumers in Colorado, Nebraska, New Mexico and Wyoming. The Craig Power Station has been an integral part of Tri-State’s dispatchable generation fleet that ensures an affordable, reliable and resilient energy supply for its members. The ownership of the Craig Station Unit 1&2 is a collaborative between Tri-State, Salt River Project Agricultural Improvement and Power District, Platte River Power Authority, PacifiCorp, and Public Service Company of Colorado and is known as the Yampa Project. Tri-State owns all of Craig Unit 3 and is the operator of all three units. All three of the Craig units have planned retirement dates that will not extend beyond 2028 and Tri-State Generation wanted to evaluate carbon-neutral emitting technologies that could provide approximately 300 megawatts (“MWs) of capacity and energy that will be lost after Unit 3 ceases operation, as well as provide a similar level of economic benefits to the Craig community. This report is to serve as a technology feasibility study constrained to the current land area available at the Craig site and was conducted based on the limitations of the region.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Reasoner, John [Tri-State Generation and Transmission Association, Inc., Westminster, CO (United States)]. 2025-05-30. Craig Energy Center Feasibility Study. https://doi.org/10.2172/2999520
Cite the original work for its findings. Save a collection to share your selection of sources.