Engineering PapersSearch

DOE OSTI · 2539794

HEP High Power Targetry Roadmap -- Workshop Report

Abstract

Designing a reliable target is already a challenge for MW-class facilities today and has led several major accelerator facilities to operate at lower than design power due to target concerns. With present plans to increase beam power for next generation accelerator facilities in the next decade, timely R and D in support of robust high power targets is critical to secure the full physics benefits of ambitious accelerator power upgrades. A comprehensive R and D program must be implemented to address the many complex challenges faced by multi MW beam intercepting devices. This roadmap is envisioned to be helpful to the DOE-OHEP office when planning and prioritizing future R and D activities as well as leveraging synergies across the Office of Science. The roadmap will be extremely beneficial to the broader (external to DOE HEP) HPT community by communicating OHEP s high level strategy and objectives for HPT R and D and highlighting possible opportunities for collaboration.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Ammigan, K. [Fermilab] (ORCID:0000000313156760), Barbier, C. [Oak Ridge], Bidhar, S. [Fermilab] (ORCID:0000000236284303), Casella, A. [PNL, Richland], Calviani, M. [CERN], Densham, C. [Rutherford], Hurh, P. [Fermilab] (ORCID:0000000290245399), Kim, D. [Brookhaven], Liu, D. [Bristol U.], Lynch, K. [Fermilab] (ORCID:0000000280071196), Makimura, S. [KEK, Tsukuba], Pellemoine, F. [Fermilab] (ORCID:000900040916931X), Senor, D. [PNL, Richland], Shiltsev, V. [Fermilab] (ORCID:0000000332824701), Stratakis, D. [Fermilab] (ORCID:0000000170421781), Terry, J. [IIT, Chicago], Yonehara, K. [Fermilab] (ORCID:0000000254404153). 2025-02-05. HEP High Power Targetry Roadmap -- Workshop Report. https://www.osti.gov/biblio/2539794

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Design and Integration of High Precision Superconducting Magnet Power Supply Systems

This paper reviews the design and integration approach being taken to power more than 400 superconducting magnets in Electron Ion Collider (EIC) by power supplies ranging from 20V to 400V and 100A to 18kA. A major challenge is to integrate existing legacy power supplies with new high current systems and maximize performance and reduce costs. Successful implementation requires coordinated integration of power convertors, current regulation, quench protection, energy extraction, machine protection, controls and existing accelerator infrastructure.

43 PARTICLE ACCELERATORS

Searching for the Most Harmful Field Errors in the HSR IR Superconducting Magnets

In this project, we improve beam stability for the Electron-Ion Collider. Magnetic field errors can reduce beam stability, making it essential to identify the field errors that have the greatest impact on accelerator performance. However, this is particularly challenging because beam stability depends on the complex interactions of many magnetic field errors, resulting in a high-dimensional and nonlinear optimization problem. We determine which field errors are the most influential for the large physical aperture superconducting magnet B2PF, a critical magnet in the Interaction Region (IR) in the Hadron Storage Ring (HSR). We complete and analyze nearly 30,000 simulations on the Brookhaven National Laboratory Linux Cluster by varying 18 nonlinear magnetic field errors. We evaluate beam stability using the dynamic aperture and the tune diffusion. We identify the field errors that most strongly influence beam stability and establish quantitative field error tolerances that improve accelerator performance.

43 PARTICLE ACCELERATORS