The United States' energy future is being shaped by decades of technology innovation, rapidly changing consumer requirements, and governmental focus on securing reliable, low-cost energy sources. With expanded electrification and increased emphasis on grid reliability coupled with the heightened complexity and risks associated with transmission infrastructure, the use of distributed energy resources (DERs) is more commonly being considered a safe, efficient, and cost-effective way to maintain grid resilience and reliability. Amidst improvements in performance, decreasing costs, and unprecedented federal policy support for DERs, electric cooperatives are considering new opportunities to use these assets to ensure secure and reliable operations for millions of customers. In light of these developments, a series of workshops were held to collaborate on the development of business models for DERs in rural electric cooperative ecosystems. The first workshop was held July 11, 2024, at the Tri-State Generation and Transmission Association Inc. headquarters in Westminster, Colorado (hereafter referred to as the "Tri-State Workshop"). The second workshop was hosted by PNGC Power on Oct. 9, 2024, in Portland, Oregon (hereafter referred to as the "PNGC Power Workshop"). These workshops convened representatives from G&Ts, distribution cooperatives,2 the energy industry, the financial community, the U.S. government, national and regional organizations, and national laboratories to share perspectives on the unique needs, challenges, and opportunities that they face as DERs are further integrated into the grid. The workshops were designed to address the following objectives: (1) develop the enabling attributes of electric cooperative DER business models, (2) explore pathways for generating community benefits from these assets, and (3) identify technical challenges and market risks for DERs in rural electric cooperative service territories. This report outlines key findings and major themes identified by workshop participants that federal agencies, G&Ts, distribution cooperatives, and other entities can consider to advance electric cooperative DER business models.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Farr, Sophie [National Renewable Energy Laboratory (NREL), Golden, CO (United States)], Brush, Chloe [National Renewable Energy Laboratory (NREL), Golden, CO (United States)], Talamo, Julia [National Renewable Energy Laboratory (NREL), Golden, CO (United States)], Jenkins, Jennifer [Mana Group Consulting, Durango, CO (United States)], Schmitt, Nathan [Mana Group Consulting, Durango, CO (United States)], Newcomb, Charles [Mana Group Consulting, Durango, CO (United States)], MacDonald, Suzanne [National Renewable Energy Laboratory (NREL), Golden, CO (United States)], Preziuso, Danielle [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)], Baring-Gould, Ian [National Renewable Energy Laboratory (NREL), Golden, CO (United States)] (ORCID:0000000258563370), Baranowski, Ruth [National Renewable Energy Laboratory (NREL), Golden, CO (United States)] (ORCID:0000000201266762). 2025-01-10. Workshop Report: Rural Electric Cooperative Distributed Energy Resource Business Model Development Workshops. https://doi.org/10.2172/2502021

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION

From zonal to nodal capacity expansion planning: Spatial aggregation impacts on a realistic test-case

Solving power system capacity expansion planning (CEP) problems at realistic spatial resolutions is computationally challenging. Thus, a common practice is to solve CEP over zonal models with low spatial resolution rather than over full-scale nodal power networks. Due to improvements in solving large-scale stochastic mixed integer programs, these computational limitations are becoming less relevant, and the assumption that zonal models are realistic and useful approximations of nodal CEP is worth revisiting. Here, this work is the first to conduct a systematic computational study on the assumption that spatial aggregation can reasonably be used for ISO-scale CEP. By considering a realistic, large-scale test network based on the state of California with over 8000 buses, we find that well-designed small spatial aggregations can yield good approximations but that coarser zonal models may result in large distortions of investment decisions, e.g., capacity under-investment of up to 41% for the lowest resolution model considered.

24 POWER TRANSMISSION AND DISTRIBUTION

Multi-facility analysis using metered power data to quantify MRI energy use and utility bill costs across scanner operating modes

This study quantifies the energy consumption of magnetic resonance imaging (MRI) scanners across discrete operating modes during routine clinical workflows, based solely on electrical power measurements. Although previous studies have investigated MRI energy consumption within single hospitals or specific clinical settings, this research provides a broader and more systematic analysis. Researchers analyzed electrical power data and applied a previously developed semi-automatic method for identifying MRI operating modes using load duration curves for 20 MRI scanners across four different U.S. healthcare facilities, encompassing outpatient, inpatient, and mixed-use clinical settings. A key innovation is the inclusion of localized hourly utility rates to estimate costs, a parameter absent in prior literature. Key findings indicate significant variability in energy and cost profiles between weekdays and weekends. Scanner characteristics, including magnet strength, manufacturer, vintage, location, and clinical setting, influenced average daily energy consumption and power thresholds for operating modes. Notably, the clinical setting of a scanner predominantly determines its energy use. For example, the scanners in outpatient facilities consumed more energy. The breakdown of energy usage and costs by operating modes showed scanners spend between 61% and 93% of their time in nonproductive modes, with one outlier spending 34%. Average daily energy use for the scanners in the study ranged from 160 to 1069 kWh, with energy costs ranging from $\$$9 to $\$$149. This study uses an existing framework to quantify MRI energy behavior, leading to insights that can enable improved performance and cost savings across different healthcare environments.

24 POWER TRANSMISSION AND DISTRIBUTION