Engineering Papers⌕ Search

DOE OSTI · 2350666

Approximating a linear multiplicative objective in watershed management optimization

Abstract

Implementing management practices in a cost-efficient manner is critical for regional efforts to reduce the amount of pollutants entering the Chesapeake Bay. We study the problem of selecting a subset of practices that minimizes pollutant load—subject to budgetary and environmental constraints—as simulated in a widely used regulatory watershed model. Mimicking the computation of pollutant load in the regulatory model, we formulate this problem as a continuous optimization model with a linear multiplicative objective function and linear constraints. To lay the groundwork for incorporating additional stakeholder requirements in the future, especially those that would require integer variables, we present and study a continuous linear optimization model that approximates the nonlinear model. The linear model, which requires an exponential number of variables, arises naturally as an alternative model for the same underlying physical process. We examine the theoretical behavior of these optimization models and investigate restrictions of the linear model to handle its large number of variables. Through extensive computational tests on real and randomly generated instances, we demonstrate that the linear model and its restrictions provide optimal solutions close to those of the nonlinear model in practice, despite poor approximation properties in the worst case. We conclude that the linear model—together with our approach to handling its large number of variables—provides a viable framework from which to extend the optimization model to better meet the needs of the Chesapeake Bay watershed management stakeholders.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Boddiford, Ashley N., Kaufman, Daniel E., Skipper, Daphne E., Uhan, Nelson A.. 2022-06-12. Approximating a linear multiplicative objective in watershed management optimization. https://doi.org/10.1016/j.ejor.2022.06.006

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Water4Energy Step-1 Band-M Ready-to-Train Samples for TVA Weeks-to-Years Prediction, Version 0

AI-ready Band-M (monthly) labelled training pack for the Water4Energy Genesis Task-1 project on weeks-to-years prediction of Tennessee Valley temperature and precipitation. The deposit includes leakage-aware issue-time samples (samples_M_v0.nc; N=486), train-only scalers, issue-time split table, supporting monthly panels, and Python generation scripts to recreate the pack from the companion Tier-1 raw observation collection (https://doi.org/10.13139/ORNLNCCS/3398576). Each sample pairs a 12-month lookback of teleconnection indices and SST box anomalies with TVA-mean ERA5 anomaly targets (t2m, tp, msl) at leads 1–3 months.

54 ENVIRONMENTAL SCIENCES↗

Multi-Angle Snowflake Camera, particle analysis

The c1 level data product for the Mutli-Angle Snowflake Camera contains snowflake fall speeds and particle size, among other analysis for images associated with each hydrometeor.

54 ENVIRONMENTAL SCIENCES↗

Multi-Angle Snowflake Camera, time bins

The c1 level data product for the Mutli-Angle Snowflake Camera contains snowflake fall speeds and particle size, among other analysis for images associated with each hydrometeor.

54 ENVIRONMENTAL SCIENCES↗