Engineering Papers⌕ Search

DOE OSTI · 1992247

Aqueous Nitrate Operations in PF-4 [Slides]

Abstract

Aqueous Processing has evolved since 1978. Recover plutonium from residues: recycle plutonium; waste disposal. Plutonium residues dissolved, purified, precipitated, oxidized. Liquid residues recycled, sent to Rad Liquid Waste, or Cement Fixation. Restart of operation in 2023 after ~10 yr pause.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Finstad, Casey Charles. 2023-07-25. Aqueous Nitrate Operations in PF-4 [Slides]. https://doi.org/10.2172/1992247

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2025

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2025. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of the DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, the evaluation of data collected in 2025 continued to indicate that WVDP activities posed no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗