Engineering Papers⌕ Search

DOE OSTI · 1975658

NREL HPC FY24 Allocation Cycle

Abstract

The FY24 HPC Allocations webinar and PowerPoint presentation covers background, instructions, and details related to FY24's allocations process.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Munch, Kris (ORCID:0000000349965172), Andersen, Aaron. 2023-05-24. NREL HPC FY24 Allocation Cycle. https://www.osti.gov/biblio/1975658

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology that was developed to allocate reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) program's subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. Allocating is an iterative process; as systems moved beyond their conceptual and preliminary design phases this provided an opportunity for the reliability engineering team to reevaluate allocations based on updated designs and maintainability characteristics of the components. Trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper will discuss the value of modifying reliability and maintainability allocations made for the GSDO subsystems as the program nears the end of its design phase.

allocations↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology and value of modifying allocations to reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) program’s subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. This iterative process provided an opportunity for the reliability engineering team to reevaluate allocations as systems moved beyond their conceptual and preliminary design phases. These new allocations are based on updated designs and maintainability characteristics of the components. It was found that trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper discusses the results of reliability and maintainability reallocations made for the GSDO subsystems as the program nears the end of its design phase.

allocations↗