Engineering Papers⌕ Search

DOE OSTI · 1909111

GDSA - Modeling and Integration – ORNL: PFLOTRAN modeling

Abstract

This report summarizes work done at Oak Ridge National Laboratory (ORNL) related to post-closure criticality consequence analysis of dual-purpose canister (DPC) direct disposal in unsaturated alluvium. PFLOTRAN software was used to model the behavior of a breached DPC with low water infiltration rates and unsaturated conditions in alluvial deposits such that a low-power criticality event occurs with a focus on thermal hydrological constraints on criticality timing and power output. This summary describes initial exploration of those thermal hydrological processes and of the long-term average power output from a criticality event that could be sustained without driving water out of the DPC package and thereby terminating the criticality event. The objectives are (1) to identify, for different groundwater infiltration rates, the time at which the DPC fills with water sufficiently to potentially initiate criticality; (2) to bound the power output that could be produced by a criticality event that would thermally drive water out of the package at various percolation rates; and (3) provide an estimate of how the size of a package breach affects the water infiltration and therefore the possibility timing of criticality.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Painter, Scott L., Kumar, Vineet, Cumberland, Riley, Fortner, Jeffrey. 2022-10-31. GDSA - Modeling and Integration – ORNL: PFLOTRAN modeling. https://doi.org/10.2172/1909111

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2025

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2025. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of the DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, the evaluation of data collected in 2025 continued to indicate that WVDP activities posed no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗