Engineering Papers⌕ Search

DOE OSTI · 1837813

Planner Individual Project: Hybrid Planner (Final Draft)

Abstract

Systems engineering report for hybrid written-online planner.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Garafalo, Anne Mayer. 2021-12-28. Planner Individual Project: Hybrid Planner (Final Draft). https://doi.org/10.2172/1837813

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Fire Protection Design

The purpose of this project is to design the demolition and installation of a deluge valve swap from a DV-5 to a DV-5A valve.

99 GENERAL AND MISCELLANEOUS↗