Engineering Papers⌕ Search

DOE OSTI · 1822689

PSMC Upgrade Development Documentation and Functional Testing

Abstract

The functional verification consists of verifying that the calibration (a.k.a. gain matching) is accurate and that there is no double pulsing or signal cross talk and interference. The calibration is shown to be satisfactory from the plateau plots on the right. The absence of double pulsing and cross talk can be seen in the time-interval diagram below. Both phenomena are manifested by spikes in the time interval distribution around 1µs to 5µs. No such spike is present.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Iliev, Metodi, Browne, Michael C.. 2021-09-23. PSMC Upgrade Development Documentation and Functional Testing. https://doi.org/10.2172/1822689

Cite the original work for its findings. Save a collection to share your selection of sources.