DOE OSTI · 1431236
Decrease time-to-solution through improved linear-system setup and solve.
Abstract
The goal of the ExaWind project is to enable predictive simulations of wind farms composed of many MW-scale turbines situated in complex terrain. Predictive simulations will require computational fluid dynamics (CFD) simulations for which the mesh resolves the geometry of the turbines, and captures the rotation and large deflections of blades. Whereas such simulations for a single turbine are arguably petascale class, multi-turbine wind farm simulations will require exascale-class resources.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Hu, Jonathan J., Thomas, Stephen, Dohrmann, Clark R., Ananthan, Shreyas, Domino, Stefan P., Williams, Alan B., Sprague, Michael. 2018-03-01. Decrease time-to-solution through improved linear-system setup and solve.. https://doi.org/10.2172/1431236
Cite the original work for its findings. Save a collection to share your selection of sources.