DOE OSTI · 1048161
Critical Path-Based Thread Placement for NUMA Systems
Abstract
Multicore multiprocessors use Non Uniform Memory Architecture (NUMA) to improve their scalability. However,NUMA introduces performance penalties due to remote memory accesses. Without efficiently managing data layout and thread mapping to cores, scientific applications, even if they are optimized for NUMA, may suffer performance loss. In this paper, we present an algorithm that optimizes the placement of OpenMP threads on NUMA processors. By collecting information from hardware counters and defining new metrics to capture the effects of thread placement, the algorithm reduces NUMA performance penalty by minimizing the critical path of OpenMP parallel regions and by avoiding local memory resource contention. We evaluate our algorithm with NPB benchmarks and achieve performance improvement between 8.13% and 25.68%, compared to the OS default scheduling.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Su, Chun-Yi, Li, Dong, Nikolopoulos, Dimitrios, Grove, Matthew, Cameron, Kirk W., de Supinski, Bronis R.. 2012-01-01. Critical Path-Based Thread Placement for NUMA Systems. https://doi.org/10.1145/2381056.2381079. https://engineeringpapers.com/record/osti%3A1048161/critical-path-based-thread-placement-for-numa-systems
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Engineering Papers by Indiciae: BibTeX · RIS.