Engineering Papers⌕ Search

DOE OSTI · 1035298

Critical Path-Based Thread Placement for NUMA Systems

Abstract

Multicore multiprocessors use a Non Uniform Memory Architecture (NUMA) to improve their scalability. However, NUMA introduces performance penalties due to remote memory accesses. Without efficiently managing data layout and thread mapping to cores, scientific applications, even if they are optimized for NUMA, may suffer performance loss. In this paper, we present algorithms and a runtime system that optimize the execution of OpenMP applications on NUMA architectures. By collecting information from hardware counters, the runtime system directs thread placement and reduces performance penalties by minimizing the critical path of OpenMP parallel regions. The runtime system uses a scalable algorithm that derives placement decisions with negligible overhead. We evaluate our algorithms and runtime system with four NPB applications implemented in OpenMP. On average the algorithms achieve between 8.13% and 25.68% performance improvement compared to the default Linux thread placement scheme. The algorithms miss the optimal thread placement in only 8.9% of the cases.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Su, C Y, Li, D, Nikolopoulos, D S, Grove, M, Cameron, K, de Supinski, B R. 2011-11-01. Critical Path-Based Thread Placement for NUMA Systems. https://doi.org/10.1145/2088457.2088471. https://engineeringpapers.com/record/osti%3A1035298/critical-path-based-thread-placement-for-numa-systems

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Engineering Papers by Indiciae: BibTeX · RIS.

KEEP EXPLORING

Related reports

TANTE: Time-adaptive operator learning via neural Taylor expansion

Operator learning for time-dependent partial differential equations (PDEs) has seen rapid progress in recent years, enabling efficient approximation of complex spatiotemporal dynamics. However, most existing methods rely on fixed time step sizes during rollout, which limits their ability to adapt to varying temporal complexity and often leads to error accumulation. In this work, we propose the Time-Adaptive Transformer with Neural Taylor Expansion (TANTE), a novel operator-learning framework that produces continuous-time predictions with adaptive step sizes. TANTE predicts future states by performing a Taylor expansion at the current state, where neural networks learn both the higher-order temporal derivatives and the local radius of convergence. This allows the model to dynamically adjust its rollout based on the local behavior of the solution, thereby reducing cumulative error and improving computational efficiency. We demonstrate the effectiveness of TANTE across a wide range of PDE benchmarks, achieving superior accuracy and adaptability compared to fixed-step baselines, delivering accuracy gains of 60-80 % and speed-ups of 30-40 % at inference time.

97 MATHEMATICS AND COMPUTING↗

Structured illumination for surface-resolved grazing-incidence X-ray scattering

Grazing-incidence (GI) scattering techniques are widely used to characterize thin films, offering high surface sensitivity and insight into morphology and structure. However, these approaches typically provide statistical averaged information due to elongated footprint or limited spatial resolution due to beam size. Here we introduce a method that combines structured illumination with GI X-ray scattering and leverages our computational imaging approach to resolve local structural details. We demonstrate that our method captures local features of an organic semiconductor thin film without the need for sample rotation as in tomography. The method expands GI techniques from statistical averaging to high-resolution imaging, thereby providing the capability for detailed analysis of local material properties, such as domain shape, orientation and polymorphism, which are critical for advancing material design towards more efficient and tailored materials.

97 MATHEMATICS AND COMPUTING↗