Engineering Papers⌕ Search

DOE OSTI · 1016194

SAPHIRE 8 Volume 4 - Tutorial

Abstract

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, or any of their employees, makes any warranty, expressed or implied, or assumes any legal liability of responsibility for any third party’s use, or the results of such use, or any information, apparatus, product or process disclosed in this report, or represents that its use by such third party would not infringe privately owned rights.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Smith, C L, Wood, S T, Beck, S T. 2011-03-01. SAPHIRE 8 Volume 4 - Tutorial. https://doi.org/10.2172/1016194

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Fire Protection Design

The purpose of this project is to design the demolition and installation of a deluge valve swap from a DV-5 to a DV-5A valve.

99 GENERAL AND MISCELLANEOUS↗