Advanced Distillation Final Report

Abstract

The Advanced Distillation project was concluded on December 31, 2009. This U.S. Department of Energy (DOE) funded project was completed successfully and within budget during a timeline approved by DOE project managers, which included a one year extension to the initial ending date. The subject technology, Microchannel Process Technology (MPT) distillation, was expected to provide both capital and operating cost savings compared to conventional distillation technology. With efforts from Velocys and its project partners, MPT distillation was successfully demonstrated at a laboratory scale and its energy savings potential was calculated. While many objectives established at the beginning of the project were met, the project was only partially successful. At the conclusion, it appears that MPT distillation is not a good fit for the targeted separation of ethane and ethylene in large-scale ethylene production facilities, as greater advantages were seen for smaller scale distillations. Early in the project, work involved flowsheet analyses to discern the economic viability of ethane-ethylene MPT distillation and develop strategies for maximizing its impact on the economics of the process. This study confirmed that through modification to standard operating processes, MPT can enable net energy savings in excess of 20%. This advantage was used by ABB Lumus to determine the potential impact of MPT distillation on the ethane-ethylene market. The study indicated that a substantial market exists if the energy saving could be realized and if installed capital cost of MPT distillation was on par or less than conventional technology. Unfortunately, it was determined that the large number of MPT distillation units needed to perform ethane-ethylene separation for world-scale ethylene facilities, makes the targeted separation a poor fit for the technology in this application at the current state of manufacturing costs. Over the course of the project, distillation experiments were performed with the targeted mixture, ethane-ethylene, as well as with analogous low relative volatility systems: cyclohexane-hexane and cyclopentane-pentane. Devices and test stands were specifically designed for these efforts. Development progressed from experiments and models considering sections of a full scale device to the design, fabrication, and operation of a single-channel distillation unit with integrated heat transfer. Throughout the project, analytical and numerical models and Computational Fluid Dynamics (CFD) simulations were validated with experiments in the process of developing this platform technology. Experimental trials demonstrated steady and controllable distillation for a variety of process conditions. Values of Height-to-an-Equivalent Theoretical Plate (HETP) ranging from less than 0.5 inch to a few inches were experimentally proven, demonstrating a ten-fold performance enhancement relative to conventional distillation. This improvement, while substantial, is not sufficient for MPT distillation to displace very large scale distillation trains. Fortunately, parallel efforts in the area of business development have yielded other applications for MPT distillation, including smaller scale separations that benefit from the flowsheet flexibility offered by the technology. Talks with multiple potential partners are underway. Their outcome will also help determine the path ahead for MPT distillation.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Fanelli, Maddalena, Arora, Ravi, Tonkovich, Annalee, Marco, Jennifer, Rode, Ed. 2010-03-24. Advanced Distillation Final Report. https://doi.org/10.2172/1000368

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Building the Business Case with JUSTIFI: Quantifying Multiple Benefits in the Automotive Industry

The Michigan State University Industrial Training and Assessment Center (MSU ITAC) conducted a pilot study at an automotive parts manufacturer in Michigan. The study identified energy-productivity enhancements through the application of the JUSTIFI software. Key recommendations included replacing six inefficient rooftop units (RTUs) with a new air rotational unit. By quantifying operational savings for this project, the expected payback period went from 6.6 years to 1.4 years. Additionally, the installation of variable frequency drives (VFDs) on condenser tower motors was suggested. By including all operational benefits, the payback period was reduced from 8.2 years to 1.3 years. This comprehensive analysis aims to bolster the manufacturer's goals of reducing energy while enhancing overall operational efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Physics-Informed Reinforcement Learning Framework for Economic-Thermal Co-Optimization of Crypto Mining Data Centers: Preprint

The rapid expansion of cryptocurrency mining has created a new class of high-density data centers characterized by extreme thermal flux and high sensitivity to volatile economic markets. Traditional thermal management strategies, typically reliant on rule-based control, maintain static setpoints that fail to account for fluctuating electricity prices and cryptocurrency values - factors critical to mining profitability. To address this, we present a physics-informed reinforcement learning (PIRL) framework for economic-thermal co-optimization in crypto mining data centers. This framework consists of a proximal policy optimization (PPO) agent, a virtual testbed powered by high-fidelity physics-based models, and an interactive frontend dashboard. The PPO agent is trained using the virtual testbed and strict hardware safety limits. This physics-informed approach allows the agent to learn a stochastic policy that dynamically balances mining revenue against operational costs by co-optimizing HVAC cooling setpoints and IT computational hashrate. The simulation results demonstrate that the integrated framework achieved an 8.62% increase in net operational profit compared to traditional baseline strategies while strictly adhering to safety-critical temperature constraints (coolant supply temperature < 32 degrees C). This work provides a scalable template for the deployment of reinforcement learning in mission critical facilities where economic volatility and physical safety must be managed simultaneously.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗