Engineering PapersSearch

NASA NTRS · 20230010470

Automated Fiber Placement Through Thickness Defect Stacking Optimization

Abstract

In its 2022 commercial market outlook, Boeing forecasted an 80% increase in the global fleet through 2041 compared to 2019 pre-pandemic levels. This sharp rise in demand will drive pressure onto airframe manufacturers to ramp up production and find more efficient ways to design and manufacture airplanes. Complicating this challenge is the industry’s recent transformation from traditional metal-based airframes towards hybrid composite-metal aircraft. While composites have been used in aviation for decades, aircraft manufacturers are still struggling to design and manufacture quality parts at a high rate. Automated Fiber Placement (AFP) is one of the main manufacturing techniques used to produce large-scale composite parts. After a design has been created, a manufacturing strategy has to be developed based on the working material, part geometry, and machine capabilities. This process planning stage is essential to the AFP workflow and currently requires a high level of manual input from an experienced process planner. In an effort to automate and optimize this stage, the Computer Aided Process Planning (CAPP) module was developed. CAPP assists process planners in identifying optimal starting point location and layup strategy for each ply of a laminate. This Ply-Level Optimization (PLO) phase operates on the quantification of ply quality through predictable geometry-based defects such as gaps, overlaps, angle deviation, and steering. As you move from PLO to Laminate-Level Optimization (LLO) the design space grows exponentially, emphasizing the need for automated optimization. The work presented in this thesis expands CAPP’s functionality by comparing the planned fiber paths through the thickness of the laminate to mitigate stacked area defects and achieve an optimal laminate-level manufacturing strategy. Within CAPP, predicted gap and overlap defects are imported from Vericut Composites Programming (VCP) and then discretized to streamline the through-thickness comparison. Two objective functions are used to score different combinations of ply layup strategies based on defect stacking both globally and locally. Four combinatorial optimization algorithms were coupled with these objective functions to investigate the laminate-level manufacturing strategy design space and converge on the optimal plan. These algorithms were evaluated based on accuracy and efficiency through virtual testing on a complex tool surface. A separate LLO approach was developed to achieve near-optimal laminates in significantly less time. The end result is a software package which greatly reduces the required input from process planners, shortening the design-build cycle time and improving part quality.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Noah Swingle. 2023-09-01. Automated Fiber Placement Through Thickness Defect Stacking Optimization. https://ntrs.nasa.gov/citations/20230010470

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Center Planning and Development: Multi-User Spaceport Initiatives

The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any additional questions posed by potential proposers. After amending the AFP and posting additional material for potential users to consider, proposals are being accepted until July 31, at which point they will be evaluated to determine the proposer which best meets the objectives of the government. By identifying VAB HB2 as available and seeking proposals from the commercial sector for VAB HB2 and MLP use, Center Planning and Development is ensuring Kennedy Space Centers relevance in the evolving launch industry of the 21st century.

AFP