Optical Telescope Assembly Cost Estimating Model

Abstract

Parametric cost models can be used by designers and project managers to compare cost between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. The NASA Marshall Space Flight Center has developed a 5- parameter cost model that explains 93% (Adjusted R2) of the cost variation in a database of 46 total ground and space telescope assemblies. This model can be used to estimate the most probably cost for the Habitable Exoplanet Telescope Assembly.