Brief of Progress: A. Preparations for the 26 November launching of ABLE-4 ATLAS are proceeding as scheduled, with no problems apparent at this time. Many of the electrical tests and subsystems checks have been completed. Minor modifications have been made to the solar paddle tie-down and release mechanism, after an extensive testing program; B. Work toward the 10 December launching of ABLE-4 THOR is also progressing on schedule. Subsystem checks have been started, and mechanical fit checks have been completed; C. During the month of October, a total of 136 tests were performed on components and assemblies related to the ABLE program. These included acceptance tests, type tests, R&D tests, etc. Of this total, only three failures occurred, all of which have been corrected; D. The Space Physics Data Library, Los Angeles, California, is now in operation. Data reduction gear in the Library is in breadboard operation with completion of the installation expected by mid-November. Analysis of ABLE-3 data is progressing satisfactorily at the Library.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1959-11-10. Space Probes Program Status Report. https://engineeringpapers.com/record/nasa%3A20170000904/space-probes-program-status-report

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Engineering Papers by Indiciae: BibTeX · RIS.