Engineering PapersโŒ• Search

NASA NTRS ยท 20090016333

Lunar Surface Operations: Surface Duration - Part 2

Abstract

The objectives of this slide presentation are to review the activities on the lunar surface during the stay. The objectives include (1) Summarize Lunar Module Basics emphasizing module layout and storage. (2) Identify the primary activities occurring during each of the lunar s urface timelines, (3) List the EVA Prep tasks, (4) Identify the EVA Objectives, (5) Identify the activities associated with Post EVA (6) Describe the lessons learned during both EVA and Non EVA activities. Included are overview drawings of the Lunar Roving Vehicle, pictures of the tools, and sample return containers. There are also time lines for the Apollo 11, and Apollo 12 through 14, Apollo 15, Apollo 16 and Apollo 17. Diagrams of the EVA suits are shown, including the Liquid Cooling Garment, and the Pressure Garment Assembly. The activity prior to the EVA are reviewed. The science mission assignments of each mission are viewed. The activities after the EVA are reviewed

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Interbartolo, Michael. 2009-01-01. Lunar Surface Operations: Surface Duration - Part 2. https://ntrs.nasa.gov/citations/20090016333

Cite the original work for its findings. Save a collection to share your selection of sources.