Engineering PapersSearch

NASA NTRS · 20060039221

Joining A Distributed Simulation Environment Via ALSP

Abstract

This paper describes the approach and changes that allow CBS to successfully join the ALSP Confederation.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Dubon, Lydia P.. 1993-12-12. Joining A Distributed Simulation Environment Via ALSP. https://ntrs.nasa.gov/citations/20060039221

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Provider of Services for Urban Air Mobility (PSU) Prototype Simulation (X5) Final Report

Urban Air Mobility (UAM) is a new air transportation service concept to carry passengers or cargo in metropolitan areas, leveraged by innovative aircraft and air traffic automation technologies. NASA has conducted a series of simulations, called the X-series simulation, to evaluate the UAM concept of operations and support the development of airspace procedures and services for UAM operations. The simulation called “X5” was conducted in 2023 to test a Provider of Services for UAM (PSU) prototype developed by NASA for UAM flight planning, strategic conflict management support, and data exchange between UAM operators. In this simulation, two strategic conflict management capabilities, Demand-Capacity Balancing and Sequencing and Scheduling, were further investigated. This document describes the UAM system architecture modeled, the X5 simulation environment to be executed (e.g., traffic scenario and UAM airspace construct), and the strategic conflict management processes developed and evaluated in this study. Then, the simulation results are provided using several system performance metrics, such as the number of operations planned and activated, demand-capacity imbalances detected and resolved, and pre-departure delays. Based on these metrics, the test findings and lessons learned from this simulation are discussed. NASA developed a PSU prototype as part of a reference implementation of UAM system architecture and evolved strategic conflict management capabilities for UAM operations from the previous collaborative simulations with industry partners. Below is the summary of the achievements: - Aligned NASA’s UAM reference architecture with the FAA’s UAM ConOps notional architecture - Extended UAM airspace management capabilities to include 1) Demand-Capacity Balancing (DCB) to ensure operators coordinate planned usage of shared vertiports, and 2) Sequencing and Scheduling (S&S) at UAM corridor entry and exit points to help facilitate an orderly flow of traffic - Defined the PSU information exchange APIs and requirements towards informing industry standards - Developed and tested a NASA PSU prototype as reference implementation to validate the requirements and APIs - Developed a prototype service connecting NASA’s PSU and the FAA system for testing future PSU-ATM interface requirements - Tested NASA-developed assumptions for UAM operations such as airspace design, procedures, vehicle performance, and strategic conflict management methods to inform future Cooperative Operating Practices (COPs) development with industry - Evaluated system performance metrics such as number of simultaneous operations and ground delays that can help define system-level requirements. The simulation results showed that the UAM traffic demand could be managed to minimize the needs of tactical separation provision with ground delays assigned by DCB and S&S. These accomplishments and the lessons learned from the PSU Prototype X5 simulation activities will be valuable inputs for the Air Mobility Pathfinders (AMP) project, which is NASA’s new project to create and evaluate a reference architecture for safe, secure, and scalable UAM operations.

Simulation

Rheology of Lunar Regolith Simulant Under Varying Gravitational Conditions

Understanding structure-property-process relationship aka rheology of regolith in varying gravity conditions is critical for exploration and future missions. In this work, a framework for studying rheology of lunar regolith simulant in varying gravity conditions (Terrestrial, Lunar and Martian) is described theoretically/numerically, where the driving force of flow of simulants was gravitational acceleration. In the analysis particle-particle interaction forces were included. It was found that the dynamic behavior of granular material is extremely sensitive to external conditions by virtue of the myriad of forces present between particle grains. The results obtained were validated against results obtained in earth and Lunar gravity conditions. The theoretical/numerical and experimental results showed that the complex interaction of these forces can drastically change the dynamics of the material, which is not captured by standard design rules, generally used in industry, for variable gravity applications.

Simulation

Exploration Systems Exterior Lighting Design Guidance

Humans are returning to the Moon — this time, to stay. NASA has selected a location that maximizes line-of-sight communication with Earth, solar visibility, and access to water ice: the Lunar South Pole (LSP). While the Sun is more consistently in the lunar sky at the poles, it never rises more than 7° above the horizon in the target landing regions. This harsh lighting environment--never experienced during the Apollo missions or in human spaceflight--presents an engineering challenge: Support and protect functional vision. The human vision system, which despite having a high-dynamic range, cannot see well into bright light and cannot adapt quickly from bright to dark or vice versa. The design of helmets, windows, and lighting solutions must work in a complementary fashion to achieve a system of lighting and functional vision support that enables crews to see into darkness while their eyes are light-adapted and see in bright light while still dark-adapted that protects their eyes from injury. This report brings together information and identifies gaps related to LSP Natural environment (topology, regolith, temperature, lighting, and so forth), NASA historical experience exploring the Moon, human vision capabilities and needs, exploration operations, simulation capabilities and needs (for design verification, training, mission planning, and so forth) and existing engineering, safety, medical and performance requirements related to support human exploration.

Simulation